Question
Book Icon
Chapter 14, Problem 15P
To determine

The conditions to prefer in borrowing new material from a borrow pit for a highway embankment

Blurred answer
Students have asked these similar questions
A 7000  meters long and 8 meters wide road is to be constructed in a remote region. Cut and fill are necessary where there is a  poor subgrade soil. Four bulldozers excavated the poor subgrade soils. The dimensions of the excavated trench were  0.8 m deep by 10 meter wide and 3.5 kilometers long. The road will have 100 mm aggregate base and 50 mm of asphalt thickness. A bulldozer displaced 115 m3\day, at a rate of 100 cedis per day.  A laterite soil will be used in the fill operation.  The fill operation will need a grader, a vibratory roller and a water truck for 20 days each at a cost of 130 cedis, 138 cedis and 68 cedis respectively. Daily labor rates for this excavation operation is a foreman, 30 cedis, five laborers, 15 cedis each. Truck driver, 21 Cedis and grade checker, 26 Cedis.  Daily labor rates for the fill operations are the same as the excavation rates. One forman, ten laborers and a truck driver will be employed for the fill operations.  Grading and asphalt laying will…
A 7000 meters long and 8 meters wide road is to be constructed in a remote region. Cut and fill are necessary where there is a poor subgrade soil. Four bulldozers excavated the poor subgrade soils. The dimensions of the excavated trench were 0.8 m deep by 10 meter wide and 3.5 kilometers long. The road will have 100 mm aggregate base and 50 mm of asphalt thickness. A bulldozer displaced 115 m \day, at a rate of 100 cedis per day. A laterite soil will be used in the fill operation. The fill operation will need a grader, a vibratory roller and a water truck for 20 days each at a cost of 130 cedis, 138 cedis and 68 cedis respectively. Daily labor rates for this excavation operation is a foreman, 30 cedis, five laborers, 15 cedis each. Truck driver, 21 Cedis and grade checker, 26 Cedis. Daily labor rates for the fill operations are the same as the excavation rates. One forman, ten laborers and a truck driver will be employed for the fill operations. Grading and asphalt laying will require:…
For a typical road construction which requires soil embankment prior subgrade, what is the proper sequence of activities to properly prepare that layer of soil embankment? Which earthwork equipment should we use in order, from first to last?
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning