a. A new road 18 m wide is under construction in flat terrain. Excavation to the sub-grade i taken to a depth of 600 mm below the ground surface. In order to stockpile the excavated material for later re-use you are required to stockpile the fill in two conical stockpiles. Tl excavated material is common fill and is dry with an angle of repose of 31 and a swell factor of 27%. Determine the size of each conical stockpile required for an excavation th is 40 m in length for the full width of the new road. b. If each stockpile is limited to a maximum height of 3m, what length of roadway should t excavated?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
a. A new road 18 m wide is under construction in flat terrain. Excavation to the sub-grade is
taken to a depth of 600 mm below the ground surface. In order to stockpile the excavated
material for later re-use you are required to stockpile the fill in two conical stockpiles. The
excavated material is common fill and is dry with an angle of repose of 31° and a swell
factor of 27%. Determine the size of each conical stockpile required for an excavation that
is 40 m in length for the full width of the new road.
b. If each stockpile is limited to a maximum height of 3m, what length of roadway should the
excavated?
Transcribed Image Text:a. A new road 18 m wide is under construction in flat terrain. Excavation to the sub-grade is taken to a depth of 600 mm below the ground surface. In order to stockpile the excavated material for later re-use you are required to stockpile the fill in two conical stockpiles. The excavated material is common fill and is dry with an angle of repose of 31° and a swell factor of 27%. Determine the size of each conical stockpile required for an excavation that is 40 m in length for the full width of the new road. b. If each stockpile is limited to a maximum height of 3m, what length of roadway should the excavated?
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning