Chapter 12, Problem 15P

1a.

To determine

Throughput time is the total amount of time required to complete a process. For example, the time required to manufacture machinery from the beginning till its end is the throughput time. Processing capacity, inspection time, move time, and queue time all contribute to throughput time. Wait time is not included in the calculation of throughput time.

:

The throughput time for each month.

2a.

To determine

The various quality control measures that result in a positive direction will help in improving the company’s performance. For instance, testing the units produced and determining if they are within the defined set of quality criteria.

To identify:

The areas in which the company seems to be improving.

3a.

To determine

Throughput time:

Throughput time is the elapsed time from the time of inception of the production process till the goods are dispatched to the customer.

Manufacturing cycle efficiency:

The manufacturing cycle refers to the amount of time in the manufacturing process that is spent on enriching or improving the product.

:

The throughput time and MCE for Month 5.

Blurred answer
Students have asked these similar questions
Measures of Internal Business Process Performance DataSpan. Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The following average times have been logged over the last four months: Required: 1. For each month, compute the following: a. The throughput time. b. The delivery cycle time. c. The manufacturing cycle efficiency (MCE). 2. Evaluate the company’s performance over the last four months. 3. Refer to the move lime, process time, and so forth, given above for month 4. a. Assume that…
D: Measures of Internal Business Process PerformanceDataSpan, Inc., automated its plant at the start of the current year and installed a flexiblemanufacturing system. The company is also evaluating its suppliers and moving toward LeanProduction. Many adjustment problems have been encountered, including problems relating toperformance measurement. After much study, the company has decided to use the performancemeasures below, and it has gathered data relating to these measures for the first four months ofoperations.Month1 2 3 4Throughput time (days) ? ? ? ?Delivery cycle time (days) ? ? ? ?Manufacturing cycle efficiency (MCE) ? ? ? ?Percentage of on-time deliveries 91% 86% 82% 78%Total sales (units) 3460 3312 3143 3025Management has asked for your help in computing throughput time, delivery cycle time, and MCE.The following average times have been logged over the last four months: Average per Month (in days)1 2 3 4Move time per unit 0.7 0.5 0.6 0.6Process time per unit 2.8 2.7 2.6…
Pareto Chart and Cost of Quality Report for a Manufacturing Company The president of Mission Inc. has been concerned about the growth in costs over the last several years. The president asked the controller to perform an activity analysis to gain a better insight into these costs. The result of the activity analysis is summarized as follows: Activities Activity Cost Correcting invoice errors $11,250 Disposing of incoming materials with poor quality 9,000 Disposing of scrap 31,500 Expediting late production 27,000 Final inspection 22,500 Inspecting incoming materials 4,500 Inspecting work in process 22,500 Preventive machine maintenance 15,750 Producing product 67,500 Responding to customer quality complaints 13,500 Total $225,000 The production process is complicated by quality problems, requiring the production manager to expedite production and dispose of scrap. Required: 1.  On paper or in a spreadsheet program, prepare a Pareto chart for each of the…
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Text book image
Managerial Accounting: The Cornerstone of Busines...
Accounting
ISBN:9781337115773
Author:Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger
Publisher:Cengage Learning
Text book image
Financial And Managerial Accounting
Accounting
ISBN:9781337902663
Author:WARREN, Carl S.
Publisher:Cengage Learning,
Text book image
Managerial Accounting
Accounting
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:South-Western College Pub