Textbook Question
Chapter 12, Problem 12.23AE
Calculate the payback and NPV for a sustainable energy project (Learning Objectives 1 & 3)
SUSTAINABILITY
Grant Industries is evaluating whether to invest in solar panels to provide some of the electrical needs of its main office building in Buffalo, New York. The solar panel project would cost $600,000 and would provide cost savings in its utility bills of $50,000 per year. It is anticipated that the solar panels would have a life of 20 years and would have no residual value.
Requirements
- 1. Calculate the payback period in years of the solar panel project.
- 2. If the company uses a discount rate of 12%, what is the
net present value of this project? - 3. If the company has a rule that no projects will be undertaken that have a payback period of more than five years, would this investment be accepted? If not, what arguments could the energy manager make to try to obtain approval for the solar panel project?
- 4. What would you do if you were in charge of approving capital investment proposals?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Liwayway High School is planning to install solar panels to provide some of the electricity for its groundwater desalting facilty. The project would be done in two phases. The first phase will cost P400 million in year 1 and P500 million in year 2. This investment will result in energy savings (phase 2) of P54,000,000 in year 3, P54,600,000 in year 4, and amounts increasing by P600,000 each year through year 10. Let i = 10% per year.(a) What is the future worth of the savings?(b) Is the cost of the solar project justified by the savings? (Hint: Calculate the difference between savings and cost).
The Culinary Institute is considering a classroom remodeling project. The cost of the remodel would be $350,000 and will be depreciated over six years using the straight- line method. The model will acoomoodate five extra student per year. Additional information related to the project follows:Cost of the remodel project: $350,000
Useful life of project in years: 6
Annual number of extra students: 5
Annual tuition per student: $22,000
Before- tax incremental cost of a student: $2,000
Company's income tax rate: 20%
Required rate of return: 12%
Assuming a six- year time horizon, what is the internal rate of return of the remodeling project? Calculate using both present value factors and separately using Excel's IRR function. Please include formulas to show how you arrive at each solution!
A) Annual cash flow:
Revenue ?
Less costs:Other than depreciation ?
Depreciation ?
Income before taxes ?
Income tax expense ?…
An electric utility is considering a photovoltaic (PV) solar panel system to provide power to water conditioning pumps within the power plant. The project will be done in two phases. Phase 1 has an initial cost of $3 million. Phase 2 will cost $2.2 million at the beginning of year 3. The system will be put into service at the beginning of year 4. The annual savings using the PV panels is estimated to be $900,000, increasing by $120,000 per year through year 10. The utility’s Minimum Attractive Rate of Return (MARR) is 10%.
1. Determine if the cost of the PV system is justified. (Hint: Consider comparing the present worth of the costs and present worth of the savings.)
2. What is the actual rate of return for this project?
Chapter 12 Solutions
Managerial Accounting (5th Edition)
Ch. 12 - Prob. 1QCCh. 12 - (Learning Objective 2) After identifying potential...Ch. 12 - Prob. 3QCCh. 12 - Prob. 4QCCh. 12 - Prob. 5QCCh. 12 - Prob. 6QCCh. 12 - Prob. 7QCCh. 12 - Prob. 8QCCh. 12 - Prob. 9QCCh. 12 - (Learning Objective 5) Which of the following...
Ch. 12 - Order the capital budgeting process (Learning...Ch. 12 - Prob. 12.2SECh. 12 - Prob. 12.3SECh. 12 - Prob. 12.4SECh. 12 - Prob. 12.5SECh. 12 - Prob. 12.6SECh. 12 - Prob. 12.7SECh. 12 - Prob. 12.8SECh. 12 - Prob. 12.9SECh. 12 - Prob. 12.10SECh. 12 - Prob. 12.11SECh. 12 - Prob. 12.12SECh. 12 - Prob. 12.13SECh. 12 - Prob. 12.14SECh. 12 - Prob. 12.15SECh. 12 - Identify ethical standards violated (Learning...Ch. 12 - Prob. 12.17AECh. 12 - Compute payback period and analyze changes...Ch. 12 - Prob. 12.19AECh. 12 - Prob. 12.20AECh. 12 - Prob. 12.21AECh. 12 - Prob. 12.22AECh. 12 - Calculate the payback and NPV for a sustainable...Ch. 12 - Prob. 12.24AECh. 12 - Prob. 12.25AECh. 12 - Prob. 12.26AECh. 12 - Prob. 12.27AECh. 12 - Prob. 12.28AECh. 12 - Prob. 12.29AECh. 12 - Prob. 12.30AECh. 12 - Prob. 12.31AECh. 12 - Prob. 12.32AECh. 12 - Prob. 12.33AECh. 12 - Prob. 12.34AECh. 12 - Prob. 12.35AECh. 12 - Prob. 12.36BECh. 12 - Prob. 12.37BECh. 12 - Prob. 12.38BECh. 12 - Prob. 12.39BECh. 12 - Prob. 12.40BECh. 12 - Prob. 12.41BECh. 12 - Prob. 12.42BECh. 12 - Prob. 12.43BECh. 12 - Prob. 12.44BECh. 12 - Prob. 12.45BECh. 12 - Prob. 12.46BECh. 12 - Prob. 12.47BECh. 12 - Prob. 12.48BECh. 12 - Prob. 12.49BECh. 12 - Prob. 12.50BECh. 12 - Prob. 12.51BECh. 12 - Prob. 12.52BECh. 12 - Prob. 12.53BECh. 12 - Prob. 12.54BECh. 12 - Prob. 12.55APCh. 12 - Prob. 12.56APCh. 12 - Prob. 12.57APCh. 12 - Prob. 12.58APCh. 12 - Prob. 12.59BPCh. 12 - Prob. 12.60BPCh. 12 - Evaluate an investment using all four methods...Ch. 12 - Prob. 12.62BPCh. 12 - Prob. 12.63SCCh. 12 - Discussion Questions 1. Describe the capital...Ch. 12 - Prob. 12.65ACTCh. 12 - Prob. 12.66ACTCh. 12 - Prob. 12.67ACT
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Austins cell phone manufacturer wants to upgrade their product mix to encompass an exciting new feature on their cell phone. This would require a new high-tech machine. You are excited about his new project and are recommending the purchase to your board of directors. Here is the information you have compiled in order to complete this recommendation: According to the information, the project will last 10 years and require an initial investment of $800,000, depreciated with straight-line over the life of the project until the final value is zero. The firms tax rate is 30% and the required rate of return is 12%. You believe that the variable cost and sales volume may be as much as 10% higher or lower than the initial estimate. Your boss understands the risks but asks you to explain the alternatives in a brief memo to the board, Write a memo to the Board of Directors objectively weighing out the pros and cons of this project and make your recommendation(s).arrow_forwardGina Ripley, president of Dearing Company, is considering the purchase of a computer-aided manufacturing system. The annual net cash benefits and savings associated with the system are described as follows: The system will cost 9,000,000 and last 10 years. The companys cost of capital is 12 percent. Required: 1. Calculate the payback period for the system. Assume that the company has a policy of only accepting projects with a payback of five years or less. Would the system be acquired? 2. Calculate the NPV and IRR for the project. Should the system be purchasedeven if it does not meet the payback criterion? 3. The project manager reviewed the projected cash flows and pointed out that two items had been missed. First, the system would have a salvage value, net of any tax effects, of 1,000,000 at the end of 10 years. Second, the increased quality and delivery performance would allow the company to increase its market share by 20 percent. This would produce an additional annual net benefit of 300,000. Recalculate the payback period, NPV, and IRR given this new information. (For the IRR computation, initially ignore salvage value.) Does the decision change? Suppose that the salvage value is only half what is projected. Does this make a difference in the outcome? Does salvage value have any real bearing on the companys decision?arrow_forwardA university spent $1.3 million to install solar panels atop a parking garage. These panels will have a capacity of 400 kilowatts (kW) and have a life expectancy of 20 years. Suppose that the discount rate is 20%, that electricity can be purchased at $0.30 per kilowatt-hour (kWh), and that the marginal cost of electricity production using the solar panels is zero. Hint: It may be easier to think of the present value of operating the solar panels for 1 hour per year first. Approximately how many hours per year will the solar panels need to operate to enable this project to break even? a. 2,224.69 b. 1,112.35 c. 2,892.10 d. 2,447.16 If the solar panels can operate only for 2,002 hours a year at maximum, the project __________ break even. Continue to assume that the solar panels can operate only for 2,002 hours a year at maximum. In order for the project to be worthwhile (i.e., at least break even), the university would need a grant of…arrow_forward
- A university spent $1.7 million to install solar panels atop a parking garage. These panels will have a capacity of 600 kilowatts (kW) and have a life expectancy of 20 years. Suppose that the discount rate is 10%, that electricity can be purchased at $0.30 per kilowatt-hour (kWh), and that the marginal cost of electricity production using the solar panels is zero. Hint: It may be easier to think of the present value of operating the solar panels for 1 hour per year first. Approximately how many hours per year will the solar panels need to operate to enable this project to break even? 776.54 1,109.34 1,774.94 1,331.21 If the solar panels can operate only for 998 hours a year at maximum, the project Continue to assume that the solar panels can operate only for 998 hours a year at maximum. In order for the project to be worthwhile (i.e., at least break even), the university would need a grant of at least break even.arrow_forwardA university spent $1.8 million to install solar panels atop a parking garage. These panels will have a capacity of 500 kw, have a life expectancy of 20 years and suppose the discount rate is 10%. a. If electricity can be purchased for costs of $0.10 per kwh, how many hours per year will the solar panels have to operate to make this project break even? b. If efficient systems operate for 2,400 hours per year, would the project break even? c. The university is seeking a grant to cover capital costs. How big of a grant would make this project worthwhile (to the university)?arrow_forward"A university wants to utilize a solar energy system to reduce its energy bill. The investment cost 500000$ and the system will have a market value of 10000$ at the end of the estimated lifetime which 25 years. The saving amount in the energy bill will be 105000$ per year. If the university's MARR is 15% per year, what is the Present worth of this investment?" 179035 267432 249753 232073 214394 196714 161355 143676 None of themarrow_forward
- . Austin Utilities is planning to install solar panels to provide some of the electricity for its groundwater desalting plant. The project would be done in two phases. The first phase will cost $4 million in year 1 and $5 million in year 2. This investment will result in energy savings (phase 2) of $540,000 in year 3, $546,000 in year 4, and amounts increasing by $6000 each year through year 10. Let i= 10% per year. (b) Is the cost of the solar project justified by the savings?arrow_forwardLittle Rhody Manufacturing needs to purchase a new central air-conditioning system for a plant. There are two choices. The first system costs $70,000 and is expected to last 6 years, and the second system costs $102,000 and is expected to last 9 years. Assume that the opportunity cost of capital is 12 percent. Which air-conditioning system should you purchase? Show your work. Hint: There are two ways to solve this. The hard way: Use formula for EAC The easy way: TMV exercise and solve for PMT assuming annual P/Y. Whichever has the lower PMT, go with that system. PV = cost. FV = 0, I/Y = 12%, N = Number of years. P/Y = 1arrow_forwardYour company is environmentally conscious and is looking at two heating options for a new research building. What you know about each option is below, and your company will use an annual interest rate of 8% for this decision: Gas Heating Option: The initial equipment and installment of the natural gas system would cost $225,000 right now. The maintenance costs of the equipment are expected to be $2,000 per year, starting next year, for each of the next 20 years. The energy cost is expected to be $5,000,starting next year, and is expected to rise by 5% per year for each of the next 20 years due to the price of natural gas increasing. Geothermal Heating Option: Because of green energy incentives provided by the government, the geothermal equipment and installation is expected to cost only $200,000 right now, which is cheaper than the gas lines. There would be no energy cost with geothermal, but because this is a relatively newer technology, the maintenance costs are expected to be…arrow_forward
- Your company is developing a new textbook for FIN 301 and you paid your current FIN 301 instructor $700,000 for his input about the feasibility of such a product. The project would involve initial capital investment of $1,200,000 and installation costs related to the capital expenditures of $600,000. The project would also necessitate an increase in net working capital of $200,000 at the beginning of the project. You can straight line depreciate any depreciable expenses to zero over the three-year life of the project, and you don't expect the capital investment to be sold at the end of the project. Each year, you estimate you will receive $3,000,000 in sales revenue from your awesome textbook. Variable product and selling costs associated with these sales are expected to be 40% of revenue in each of those years. The fixed costs in each of the three years of the project will be $500,000. The corporate tax rate is 40%. Calculate the total year 0 cash flows associated with the project. $…arrow_forwardA new equipment is being considered to replace an old equipment in a facility. The equipment would cost $7,480 and it would require a special maintenance at year 10 of the life expectancy of the equipment, which is of 15 years (also life of the project). The new equipment will generate savings in the order of $1,000 per year. If a discount rate of 6% is used what is the maximum cost of the maintenance at year 10 to make the project to be considered as a feasible option? answer is 4000 but howarrow_forwardA university's college of engineering would like to determine how much it will cost to keep its computing equipment current. In today's dollars, the college estimates that it will cost $160,000 to replace old computing equipment. Due to decreasing prices on computers, it estimates that this cost will decrease each of the following years by 4%. What would the present worth of computing updates for years 1-5 be, assuming a required 11% real return on its investments? Click here to access the TVM Factor Table calculator. $ Carry all interim calculations to 5 decimal places and then round your final answer to a whole number. The tolerance is ± $10.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage LearningPrinciples of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax College
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Principles of Accounting Volume 2
Accounting
ISBN:9781947172609
Author:OpenStax
Publisher:OpenStax College
Relevant Costing Explained; Author: Kaplan UK;https://www.youtube.com/watch?v=hnsh3hlJAkI;License: Standard Youtube License