3. A MSW facility is designed to handle solid waste generated by a town at a rate of 75,000 kg/d. The waste is delivered by compactor truck 4 days/week, and 30% of the waste is recycled. The density of the disposed waste before compaction is 120 kg/m3. The waste is compressed to a compaction ratio of 4.0. Daily cover takes up 20% of the total landfill cell volume, and a single lift is 3.5 m high. Engineers have designed the landfill for two lifts, and a total of 6.0 hectares are available for this MSW landfill. Calculate how long (in years) it will take to fill up this landfill as designed.

Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter2: Municipal Solid Waste Characteristics And Quantities
Section: Chapter Questions
Problem 2.13P
icon
Related questions
Question

3. A MSW facility is designed to handle solid waste generated by a town at a rate of 75,000 kg/d. The waste is delivered by compactor truck 4 days/week, and 30% of the waste is recycled. The density of the disposed waste before compaction is 120 kg/m3. The waste is compressed to a compaction ratio of 4.0. Daily cover takes up 20% of the total landfill cell volume, and a single lift is 3.5 m high. Engineers have designed the landfill for two lifts, and a total of 6.0 hectares are available for this MSW landfill. Calculate how long (in years) it will take to fill up this landfill as designed.

Expert Solution
steps

Step by step

Solved in 4 steps with 13 images

Blurred answer
Knowledge Booster
Municipal solid waste characteristics and quantities
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,