Concept explainers
Construction on the Bonita Full-Service Car Wash is nearing completion. The owner is Dave Kear, a retired accounting professor. The car wash is strategically located on a busy street that separates an affluent suburban community from a middle-class community. It has two state-of-the-art stalls. Each stall can provide anything from a basic two-stage wash and rinse to a five-stage luxurious bath. It is all “touchless,” that is, there are no brushes to potentially damage the car. Outside each stall, there is also a 400 horse-power vacuum. Dave likes to joke that these vacuums are so strong that they will pull the carpet right out of your car if you aren’t careful.
Dave has some important decisions to make before he can open the car wash. First, he knows that there is one drive-through car wash only a 10-minute drive away. It is attached to a gas station; it charges $5 for a basic wash, and $4 if you also buy at least 8 gallons of gas. It is a “brush”-type wash with rotating brush heads. There is also a self-serve “stand outside your car and spray until you are soaked” car wash a 15-minute drive away from Dave’s location. He went over and tried this out. He went through $3 in quarters to get the equivalent of a basic wash. He knows that both of these locations always have long lines, which is one reason why he decided to build a new car wash.
Dave is planning to offer three level of wash service—Basic, Deluxe, and Premium. The Basic is all automated; it requires no direct intervention by employees. The Deluxe is all automated except that at the end an employee will wipe down the car and will put a window treatment on the windshield that reduces glare and allows rainwater to run off more quickly. The Premium level is a “pampered” service. This will include all the services of the Deluxe, plus a special wax after the machine wax. and an employee will vacuum the car. wipe down the entire interior, and wash the inside of the windows. To provide the Premium service. Dave will have to hire a couple of “car wash specialists” to do the additional pampering.
Dave has pulled together the following estimates, based on data he received from the local Chamber of Commerce and information from a trade association.
Per Unit | Total | |
Direct materials per Basic wash | $0.30 | |
Direct materials per Deluxe wash | $0.80 | |
Direct materials per Premium wash | $1.10 | |
Direct labor per Basic wash | na | |
Direct labor per Deluxe wash | $0.40 | |
Direct labor per Premium wash | $2.40 | |
Variable |
$0.10 | |
Variable overhead per Deluxe and Premium washes | $0.20 | |
Fixed overhead | $117,000 | |
Variable selling and administrative expenses all washes | $0.10 | |
Fixed selling and administrative expenses | $130,500 |
The total estimated number of washes of any type is 45,000. Dave has invested assets of $393,750. He would like a
Instructions
Answer each of the following questions.
(a) Identify the issues that Dave must consider in deciding on the price of each level of service of his car wash. Also discuss what issues he should consider in deciding on what levels of service to provide.
(b) Dave estimates that of the total 45,000 washes. 20,000 will be Basic. 20,000 will be Deluxe, and 5,000 will be Premium. Calculate the selling price, using cost-plus pricing, that Dave should use for each type of wash to achieve his desired ROI of 20%.
(c) During the first year, instead of selling 45,000 washes, Dave sold 43,000 washes. He was quite accurate in his estimate of first-year sales, but he was way off on the types of washes that he sold. He sold 3,000 Basic, 31,000 Deluxe, and 9,000 Premium. His actual total fixed expenses were as he expected, and his variable cost per unit was as estimated. Calculate Dave’s actual net income and his actual ROI. (Round to two decimal places.)
(d) Dave is using a traditional approach to allocate overhead. As a consequence, he is allocating overhead equally to all three types of washes, even though the Basic wash is considerably less complicated and uses very little of the technical capabilities of the machinery. What should Dave do to determine more accurate costs per unit? How will this affect his pricing and. consequently, his sales?
Want to see the full answer?
Check out a sample textbook solutionChapter 8 Solutions
Managerial Accounting: Tools for Business Decision Making
- Suppose that a surfboard designer owns a building and is renting part of the building's space to a library. Further suppose that because the surfboard designer is the owner, he has the right to make noise during the day while he sands the boards. While the library cannot insist on a quiet environment, it could move to a quieter building. However, rent in the next best building is $350/month more than rent in the noisy building. The surfboard designer can adopt a new technology that eliminates the noise for $275/month. Given this situation, can the library find a private solution with the surfboard designer that will make both better off? What is the minimum and maximum payment the library would make to the surfboard designer to get it to install the noise-reducing equipment? NOTE: Round your answers to the nearest dollar.arrow_forwardLisa is a contractor, and she owns a small home renovation company that specializes in kitchen renovations. Lisa fears she has been underbidding her projects, and that translates into lost profits that could help sustain her through slow periods. She is putting together an estimate for a potential client and has determined the following activities: Activity Demo of Existing Space Cabinet Installation Countertop Installation Final bid price Cost Driver $ Square Footage # of Hours Square Footage Rate $3.26 /square foot $205 /hour $12.00 /square foot Estimated Use for Job 520 square feet 8 hours Previously, Lisa was billing at a flat rate of $16 per square foot of the demo space with no additional markup. Lisa would like to add a 20% markup to the cost to arrive at the final bid price. Using Activity-Based Costing (ABC), what is the final bid price for her potential customer? (Round intermediate calculations and final answ to 2 decimal places, e.g. 25,000.25.) 280 square feetarrow_forwardSuppose that you have been given a summer job as an intern at Issac Aircams, a company that man- ufactures sophisticated spy cameras for remote-controlled military reconnaissance aircraft. The company, which is privately owned, has approached a bank for a loan to help it finance its growth. The bank requires financial statements before approving such a loan. You have been asked to help prepare the financial statements and were given the following list of costs: Depreciation on salespersons’ cars. Rent on equipment used in the factory. Lubricants used for machine maintenance. Salaries of personnel who work in the finished goods warehouse. Soap and paper towels used by factory workers at the end of a shift. Factory supervisors’ salaries. Heat, water, and power consumed in the factory. Materials used for boxing products for shipment overseas. (Units are not normally boxed.) Advertising costs. Workers’ compensation insurance for factory employees. Depreciation on…arrow_forward
- My neighbor, Mrs. Dubois, is the accountant for the cranberry processing plant. The plant has a piece of equipment, nicknamed Harvey that is used to clean and prepare the harvested cranberries. Mrs. Dubois needs to determine if Harvey should be replaced with a newer, better version. Using the NPV tool, we will provide her a recommendation. Facts provided: 1. Old Cranberry Cleaner (Nickname: Harvey) Cost $260,000 2. Harvey’s Accumulated Depreciation $150,000 3. Cash Sales Price for Harvey $60,000 4. New Equipment Cost $448,000 5. New Equipment Depreciation (Each Year) $44,800 6. New Equipment Net Cash Revenues (Each Year) $482,000 7. New Equipment Net Cash Expenses (Each Year) $365,000 8. New Equipment Estimated Useful Life 10 Years 9. Tax Rate 40% 10. Cost of Capital 10% Step 1 A: Identify both the timing and amount of cash inflows and cash outflows (A) Compute the inflows & outflows for any…arrow_forwardDrain Your Brain, a local video arcade, is considering the addition of a new virtual reality system. Several different vendors have been contacted. The owner of the arcade, affectionately referred to by patrons as Wizard, has narrowed his selection to one of three choices (mutually exclusive alternatives). The data below describes the three systems under evaluation. Annual costs are based on electricity consumed, replacement parts based on use, and preventive maintenance. Revenue estimates are provided by the vendors based on regional data and relative thrill as compared to other arcade games and a cost of $1.00 per play. a) Which method (PW, AW, FW, IRR) would be best (easiest) to use to select the preferred alternative? b) What is the implicit study period for this problem? c) Which alternative should be selected when MARR is 15%? (AWA=$ ?)arrow_forwardManzeck Company operates a snow-removal service. The company owns five trucks, each of which has a snowplow in the front to plow driveways and a snowthrower in the back to clear sidewalks. Because plowing snow is very tough on trucks, the company incurs significant maintenance costs. Truck depreciation and maintenance represent a significant portion of the company’s overhead. The company removes snow at residential locations, in which case the drivers spend the bulk of their time walking behind the snow thrower machine to clear sidewalks. On commercial jobs, the drivers spend most of their time plowing. Manzeck allocates overhead based on labor hours. Total overhead costs for the year are $42,000. Total estimated labor hours are 1,500 hours. The average estimated residential property requires 0.5 hours of labor, while the average commercial property requires 2.5 hours of labor. The following additional information is available.Activity Cost Pools Cost Drivers…arrow_forward
- There are four factories in the city of Gotham that are polluting the waterways. Each firm is currently producing 4 pounds of pollution; Managers will continue to pollute unless the local government intervenes. Managers will prefer to maximize economic profit by avoiding paying any costs to reduce or prevent pollution created by their business. The table below shows the marginal cost of cleaning up each pound of pollution. For example, the Gamma’s cost of cleaning up the third-pound of pollution is $180. Beta’s cost of cleaning up the first pound of pollution is $30. If Alpha cleaned up all four pounds of pollution, the total cost will be $320 (=40+40+80+160) i.e. add up the marginal cost. MARGINAL COST OF CLEANING UP POLLUTION Name of firm Alpha Beta Delta Gamma in $ in $ in $ in $ 1 st pound $40 $30 $80 $20 2 nd pound $40 $60 $90 $60 3 rd pound $80 $120 $100 $180 4 th pound $160…arrow_forwardThe state Department of Education owns a computer system, which its employees use for word processing and keeping track of education statistics. The governor’s office recently began using this computer also. As a result of the increased usage, the demands on the computer soon exceeded its capacity. The director of the Department of Education was soon forced to lease several personal computers to meet the computing needs of her employees. The annual cost of leasing the equipment is $14,000.Required:1. What type of cost is this $14,000?2. Should this cost be associated with the governor’s office or the Department of Education? Why?arrow_forwardJohn Patrick has recently been hired as controller of Valdosta Vinyl Company (VVC), a manufacturer of vinyl siding used in residential construction. VVC has been in the vinyl siding business form any year sand is currently investigating ways to modernize its manufacturing process. At the first staff meeting Patrick attended, Jack Kielshesky , chief engineer, presented a proposal for automating the Molding Department. Kielshesky recommended that the company purchase two robots that would have the capability of replacing the eight direct-labor employees in the department. The cost savings outlined in the proposal include the elimination of direct-labor cost in the Molding Department plus a reduction of manufacturing overhead cost in the department to zero, because VVC charges manufacturing overhead on the basis of direct-labor dollars using a plant wide rate. The president of VVC was puzzled by Kielshesky's explanation: “This just doesn't make any sense. How can a department’s overhead…arrow_forward
- a retailer in the home improvement industry, currently operates seven retail outlets in Manama and Dubai. Management is contemplating building an eighth retail store across town from its most successful retail outlet. The company already owns the land for this store, which currently has an abandoned warehouse located on it. Last month, the marketing department spent $10,000 on market research to determine the extent of customer demand for the new store. Now Noor Supply must decide whether to build and open the new store. Which of the following should be included as part of the incremental earnings (or cash flow) for the proposed new retail store? The cost of the land where the store will be located. The cost of demolishing the abandoned warehouse and clearing the lot. The loss of sales in the existing retail outlet, if customers who previously drove across town to shop at the existing outlet become customers of the new store instead. The $10,000 in market research spent to…arrow_forwardhe state Department of Education owns a computer system, which its employees use for word processing and keeping track of education statistics. The governor’s office recently began using this computer also. As a result of the increased usage, the demands on the computer soon exceeded its capacity. The director of the Department of Education was soon forced to lease several personal computers to meet the computing needs of her employees. The annual cost of leasing the equipment is $14,000. Required: 1. What type of cost is this $14,000? 2. Should this cost be associated with the governor’s office or the Department of Education? Why?arrow_forwardTom Belford and Tony Sorrentino own a small business devoted to kitchen and bath granite installations. Recently, building contractors have insisted on up-front bid prices for a house rather than the cost-plus system that Tom and Tony had been using. They worry because natural flaws in the granite make it impossible to tell in advance exactly how much granite will be used on a particular job. In addition, granite can be easily broken, meaning that Tom or Tony could ruin a slab and would need to start over with a new one. Sometimes the improperly cut pieces could be used for smaller installations, sometimes not. All their accounting is done by a local certified public accounting firm headed by Charlene Davenport. Charlene listened to their concerns and suggested that it might be time to implement tighter controls by setting up a standard costing system. Charlene reviewed the invoices pertaining to a number of Tom and Tony's previous jobs to determine the average amount of granite and…arrow_forward
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage LearningManagerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage Learning