Traffic and Highway Engineering
5th Edition
ISBN: 9781305156241
Author: Garber, Nicholas J.
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 8, Problem 5P
To determine
Possible conflict points on a four- leg signalized intersection for a two phase systemusing appropriate diagram.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Four-phases signal with a cycle time of 80 sec, Inter Green = 4 sec/phase, lost
time / phase = 2 sec. Saturation flow on all approaches are similar, but the
maximum traffic flows on two of the phases are triple the maximum traffic
flows on the remaining two approaches, what will be actual green time on each
phase ?
An signalized intersection located in
Baghdad Capital with four phases, if
EYi=O.77, lost time for each phase ( Lt = 3.O
%3D
sec. ).The cycle length for this signalized
intersection is equal:
10. For the intersection shown below draw a 3-phase traffic signal operation.
Chapter 8 Solutions
Traffic and Highway Engineering
Ch. 8 - Prob. 1PCh. 8 - Prob. 2PCh. 8 - Prob. 3PCh. 8 - Prob. 4PCh. 8 - Prob. 5PCh. 8 - Prob. 6PCh. 8 - Prob. 7PCh. 8 - Prob. 8PCh. 8 - Prob. 9PCh. 8 - Prob. 10P
Ch. 8 - Prob. 11PCh. 8 - Prob. 12PCh. 8 - Prob. 13PCh. 8 - Prob. 14PCh. 8 - Prob. 15PCh. 8 - Prob. 16PCh. 8 - Prob. 17PCh. 8 - Prob. 18PCh. 8 - Prob. 19PCh. 8 - Prob. 20PCh. 8 - Prob. 21PCh. 8 - Prob. 22PCh. 8 - Prob. 23PCh. 8 - Prob. 24PCh. 8 - Prob. 25PCh. 8 - Prob. 26PCh. 8 - Prob. 27PCh. 8 - Prob. 28P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Solve problem 3 plearrow_forwardAn signalized intersection located in Baghdad Capital with four phases, if EYi=0.77, lost time for each phase (Lt = 3.0 sec. ).The cycle length for this signalized intersection is equal: * 100 sec. 110 sec. O 107 min. O 41 sec. O 105 sec.arrow_forwardA signalized intersection has two lane groups. The two WBT lanes (lane group #1) have a total volume of 863 pc/h and an average control delay of 24.5 seconds. The one WBL lane (lane group #2) has a volume of 203 pc/h and an average control delay of 36.5 seconds. What is the approach's LOS? Group of answer choices LOS A LOS D LOS C LOS Barrow_forward
- select all correct options.arrow_forwardFor the traffic characteristics and signal phasing system shown below, determine suitable phase lengths for the intersection using the Webster method. For each approach, assume one dedicated left-turn lane, one through lane, and one through-right lane.arrow_forwardTwo adjacent signalized intersections along a major arterial are 650 ft apart (stop line to stop line distance). If the space mean speed between these two intersections is 22 mph, what should be the signal offset of the downstream intersection relative to the upstream intersection? Group of answer choices 20.0 sec 13.5 sec 40.0 sec 29.5 secarrow_forward
- Consider the tabulated intersection design data below, then the number of vehicles stopped during the red interval for Phase EW is about .............. vehicles. Assume that Qs is 2000 vphpl and use Webster's method procedure. All-red ts (sec) (sec) Qa (vph) Yellow Lane 1 Lane 2 (sec) Phase N 500 600 2 3 Phase S 650 550 2 2 2 Phase EW 300 250 2 1 2 а. 13 b. C. 10 d. 6. Clear my choicearrow_forwardThe maximum flow that could pass through an intersection from a given approach, if that approach was allocated all of the cycle time as effective green with no lost time. Saturation flow B) cycle flow Peak flow (D Approach capacityarrow_forwardThe average normal flow of traffic on cross roads A and B during design period are 400 and 250 pcu per hour; the saturations flow values on these roads are estimated as 1250 and 1000 pcu per hour respectively. The all-red time required for pedestrian crossing is 12 secs. Design two phase traffic signal by Webster's method.arrow_forward
- Nonearrow_forwardProblem 4: Compute delays and determine LOS for the NBTH and NBLT lane groups at this intersection. Assume a full-actuated control with unit extension (passage time, PT) of 4 seconds and absence of filtering/metering at the neighboring signalized intersections. Effective green signal times are. 8 NB,TH = 33.2s =17.3s 8 NB,LT and Cycle length is: C = 125 s 3.41 3.99m 4.02m 7.99m- 3.81m 3.82m N X Street 1.38m 3.03m 5.73m 5.29m 3.48m 1.55m 3.26m 3.21m 3.47m 4.51m 6.70m 3.19m 1.20m 3.44m 3.90m 3.87m 4.06m 4,09m 4,51m Y Street Figure 1. Dual-Ring Phasing, X St. and y Street (North is up)arrow_forwardA traffic signal control is being designed for a four-leg intersection on a divided highway with the characteristics shown in the table below. Assuming the average vehicle length L is 6m, Determine an appropriate length of the yellow interval for each approach and how you will provide it. Use the AASHTO recommended deceleration rate and perception-reaction time. N-S Approaches E-W Approaches Median width, (m) 6. 3 No. of 3.5 lanes 3 on each approach Design speed, km/h 60 Grade -3.5 2. 80arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning