A two-story reinforced concrete building is to be built on a vacant parcel of land. This building will be 100 ft wide and 200 ft long. Based on information from Other borings on adjacent properties, you are reasonably certain that the soils below a depth of 5 to 8 ft (1.5 - 2.5 m) are strong and relatively incompressible. However, the upper soils are questionable because several uncompacted fills have been found in the neighborhood. Not only are these uncompacted fills loose, they have often contained various debris such as wood, rocks, and miscellaneous trash. However, none of these deleterious materials is present at the ground surface at this site. Plan a site investigation program for this project and present your plan in the form of written instructions to your field crew. This plan should include specific instructions regarding what to do, where to do it, and any special instructions. You should presume that the field crew is experienced in soil investigation work, but is completely unfamiliar with this site.
Want to see the full answer?
Check out a sample textbook solutionChapter 4 Solutions
Foundation Design: Principles and Practices (3rd Edition)
Additional Engineering Textbook Solutions
Materials for Civil and Construction Engineers (4th Edition)
Structural Steel Design (6th Edition)
Structural Analysis (10th Edition)
Elementary Surveying (14th Edition)
Elementary Surveying: An Introduction To Geomatics (15th Edition)
- What is unconsolidated-un drained test? Explain the practical applications of CD analysis of Clay. Both answers should be in your own wordsarrow_forwardA developer plans to extend Bayview Haven residential estate in Darwin by constructing a 3.5mm fill platform over very soft mangrove silty clay soils. Borehole drilling indicates the very soft clay soils are 5m thick and underlain by rock of extremely low permeability, with the water table at the ground surface. Laboratory testing indicates the following geotechnical properties of the soils: • Very Soft Silty Clay: Degree of saturation - 100%, Coefficient of Volume Compressibility (m.) - 0.85 MPa', coefficient of consolidation of clay (c.) = 2.5 m/yr; dry unit weight - 13 kN/m', moisture content - 38%. Compacted fill: bulk unit weight = 22 kN/m'. (a) Estimate the final consolidation settlement (s.) of the clay layer AM (b) Estimate the consolidation settlement after 14.5 months (c) How long will it take the silty clay layer to reach 90% consolidation, in years. (d) If the silty clay has an overconsolidation ratio (OCR) of 1.5, what is the preconsolidation pressure at the midpoint of…arrow_forwardQ2) A temporary fill of 253 kN/m² was placed on the surface of the soil shown in figure below. After final consolidation was achieved, the fill got removed and a circular footing, 5.5m in diameter was constructed at 1m below the ground surface. Estimate: i. Total consolidation settlement due to fill. Total consolidation settlement after 85 days of fill application. iii. Total heave (expansion) of the soil surface after of the fill was removed. iv. Total consolidation settlement due to footing when uniform pressure of 103 kN/m² on the footing surface. W.T N.G.S 4m Sand Y sat. 18.5 kN/m³ 5m clay Ysat. 19 kN/m',OCR-1 C-3.533 m/month e-0.95, C-0.3, C,-0.05 Rockarrow_forward
- A 5-ft fill is to be placed over the following soil profile shown below. Determine if the clay is normally consolidated or over-consolidated. The pre-consolidation pressure (past maximum consolidation stress) of the clay is 1000 lb/ft3. 5 ft 2 ft 4 ft Proposed Fill, y = 120 lb/ft³ Sand Clay Rock 2 ft A Ydry = 100 lb/ft³ Ground water table Ysat 110 lb/ft³ = o'= Pc = 1000 lb/ft²arrow_forwardA new retail store is being planned for a site that contains 20 feet of soft clay underlain by impermeable bedrock. The coefficient of consolidation for the clay is 0.25 ft /day. The groundwater table is at the ground surface. Ten feet of sandy fill with a total unit weight of 120 pcf is placed at the site as a working platform for construction. Determine the excess pore pressure at a depth of 5 feet above the bedrock three years after the fill is placed. 3.arrow_forwardIn what type of soils can you perform the consolidated drained test? What shear strength parameters can you obtain if you perform this test, depending on the duration of the construction?arrow_forward
- a. Compute the value of x b. Compute the area in the fill c. Compute thr area in cutarrow_forwardA saturated clay encountered in a deep excavation is found to have a water content of 23.5%. Determine its porosity and (saturated) unit weight.arrow_forwardsilty clay encountered in a deep excavation is found to have a moisture content of 20%. Guess its void ratio and bulk density remarking on your assumption .arrow_forward
- How do you determine amount of material (embankment cubic yards) that is needed to build an engineered fill portion? Only given information: square footage of slab on grade: 16" deep in-situ wet density: pcf in-situ moisture content: % required compaction: 95% as well as a distribution report and compaction test report I just need equations to find this out please.arrow_forwardQuestion#1: Explain the Tri axial Shear test in your own words. Question#2: Describe the practical applications of consolidated-drained analysis for clay soil. Kindly solve both questionsarrow_forwardAssuming the bedrock is impermeable, determine the time it took the clay layer to reach 90% consolidation after sand fill placement and after sand fill removal. Assume cV = 8 e-6 ft ^2/s.arrow_forward