MINIMIZING COSTS Perth Mining Company operates two mines for the purpose of extracting gold and silver. The Saddle Mine costs
a. How many days should each mine be operated so that the target can be met at a minimum cost?
b. Find the range of values that the Saddle Mine's daily operating cost can assume without changing the optimal solution.
c. Find the range of values that the requirement for gold can assume.
d. Find the shadow price for the requirement for gold.
Want to see the full answer?
Check out a sample textbook solutionChapter 3 Solutions
Finite Mathematics for the Managerial, Life, and Social Sciences
- If during the following year it is predicted that each comedy skit will generate 30 thousand and each musical number 20 thousand, find the maximum income for the year. A television program director must schedule comedy skits and musical numbers for prime-time variety shows. Each comedy skit requires 2 hours of rehearsal time, costs 3000, and brings in 20,000 from the shows sponsors. Each musical number requires 1 hour of rehearsal time, costs 6000, and generates 12,000. If 250 hours are available for rehearsal and 600,000 is budgeted for comedy and music, how many segments of each type should be produced to maximize income? Find the maximum income.arrow_forwardRedo Exercise 5, assuming that the house blend contains 300 grams of Colombian beans, 50 grams of Kenyan beans, and 150 grams of French roast beans and the gourmet blend contains 100 grams of Colombian beans, 350 grams of Kenyan beans, and 50 grams of French roast beans. This time the merchant has on hand 30 kilograms of Colombian beans, 15 kilograms of Kenyan beans, and 15 kilograms of French roast beans. Suppose one bag of the house blend produces a profit of $0.50, one bag of the special blend produces a profit of $1.50, and one bag of the gourmet blend produces a profit of $2.00. How many bags of each type should the merchant prepare if he wants to use up all of the beans and maximize his profit? What is the maximum profit?arrow_forwarderth Mining Company operates two mines for the purpose of extracting gold and silver. The Saddle Mine costs $15,000/day to operate, and it yields 65 oz of gold and 2900 oz of silver each day. The Horseshoe Mine costs $15,500/day to operate, and it yields 70 oz of gold and 1300 oz of silver each day. Company management has set a target of at least 540 oz of gold and 16,800 oz of silver. How many days should each mine be operated so that the target can be met at a minimum cost? Saddle- Days Horseshoe- Days Minimum Cost-arrow_forward
- I need help please.arrow_forwardA florist provides fresh flowers to shops in Wollongong. At present she has one nursery in Goulburn with capacity 9000 units a year. The florist is considering opening shops in Canberra and Sydney, and has found three potential nursery sites at Wagga, Orange and Bathurst. The transportation tableau below summarises the projected nursery capacities (units), the cost per unit of shipping from each nursery to each destination (dollars), and the demand (units) for the coming year. j=1 j=2 j=3 Sydney Capacities Wollongong Canberral 5 i=1 Goulburn 12 9000 i=2 Wagga 7 10 4000 i=3 Orange 4 7000 i=4 Bathurst 11000 Demand 11000 5000 8000 There are further constraints on how the nurseries can be located: • If a nursery is located in Wagga, another must be located in Bathurst and vice- versa. • One nursery can be located in Orange or Bathurst, but not both. Suppose that the costs of establishing new nurseries are Wagga $180,000 Orange $160,000 Bathurst $270,000 The goal is to develop a 0-1…arrow_forwardTh have $150,000 available to purchase additional equipment and 250 square feet of floor space to install the new equipment. They can purchase a lathe, a press, a grinder, a metal bender, a shearing table, or some combination of the above. The company can only purchase one of each item, but they Manufacturing Company is looking to expand their production capabilities. They may purchase as many of items as they can afford. The cost and square footage for each machine is detailed in the table below. Name Cost Square Footage Lathe (x1) $45,000 50 sq ft Press (x2) $65,000 80 sq ft Grinder (x3) $30,000 120 sq ft Metal Bender (x4) $75,000 70 sq ft Shearing Table (x5) $15,000 80 sq ft The company estimates they can generate a profit each day from each piece of equipment of $800 from the lathe, $600 from the press, $1,400 from the grinder, $1.200 from the metal bender, and $400 from the shearing table. Unfortunately, the manufacturing company only has the safety permit to install the lathe or…arrow_forward
- Algebra & Trigonometry with Analytic GeometryAlgebraISBN:9781133382119Author:SwokowskiPublisher:CengageCollege Algebra (MindTap Course List)AlgebraISBN:9781305652231Author:R. David Gustafson, Jeff HughesPublisher:Cengage LearningLinear Algebra: A Modern IntroductionAlgebraISBN:9781285463247Author:David PoolePublisher:Cengage Learning