Textbook Question
Chapter 3, Problem 9RQ
The cost of transportation of materials has to be allowed for in the estimate, but this item is not usually measured or even referenced in the takeoff. List six other similar items.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
8-6. Determine the haul equation constants a and b for the following data.
Average haul speed, mi/h Round-trip distance, mi/trip
"Arip
4%-9
10
0.9
20
2.9
25
4.0
29
5.5
30
6.0
35
8.0
39
10.0
40
11.0
45
15.5
50
28.0
You are a project manager on a construction project that is located 500 kms away from your
barracks. Your team is composed of 41 persons including you. Going to the site, you are
allowed to use 7 vehicles. Some of the vehicles can hold 7 people each, and the rest can hold
5 people each. Assuming all the vehicles are filled to capacity, and all the vehicles have
designated drivers that are included in your team.
a. Exactly how many of the vehicles can hold 7 people?
b. Exactly how many of the vehicles can hold 5 people?
9. A rigging job calls for lifting a structure that weighs 150 tons. Two cranes are available, one with a rated
capacity of 85 tons and the other with a rated capacity of 120 tons. The total weight of the rigging required
to make the lift is 15 tons, of which 10 tons is to be carried by the larger crane and 5 tons is to be carried
by the smaller crane. If the cranes are to be loaded in proportion to their net capacities, what should be the
approximate net load on the 120-ton crane?
A. 85 tons
B. 44 tons
C. 56 tons
D. 63 tons
Chapter 3 Solutions
Fundamentals Of Construction Estimating
Ch. 3 - What is the objective of a quantity takeoff?Ch. 3 - Why is it recommended that estimators follow a...Ch. 3 - What is the difference between an estimator’s...Ch. 3 - Prob. 4RQCh. 3 - What are the two components that make up a takeoff...Ch. 3 - In what order are dimensions entered onto the...Ch. 3 - Why should a figured dimension be used in...Ch. 3 - Why should an estimator include headings and side...Ch. 3 - The cost of transportation of materials has to be...Ch. 3 - What level of accuracy should the estimator pursue...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- What are the two components that make up a takeoff item?arrow_forwardDetermine the length of overhaul if the cost of hauling is P192000.0arrow_forwardPlease use the graphic below for the following questions. ESALS per Vehicle 6 0.0007 Car 0.10 2 1.35 Delivery Truck Loaded 18-Wheeler 1.85 Loaded 40' Bus 5.11 Loaded 60° Articulated Bus A) Delivery truck - Assuming that the truck has two separate axles with even distribution of ESAL's. Determine the load in pounds for each of the axles in pound? B) Loaded 18-Wheler - Assuming that the 18-wheeler has a single axle on the front that carries 1/5 ESAL's and two rear double axles caring 2/5 ESALS on each. What is the front axle and each of two double axles in pound?arrow_forward
- How did you get the average cost for this question? the question is from (Engineering economics analysis, p39)arrow_forwardA machine cost $45,000 to purchase. Fuel, oil grease,and minor maintenance are estimated to cost $12.34 peroperating hour. A set of tires cost $3,200 to replace, andtheir estimated life is 2,800 use hours. A $6,000 majorrepair will probably be required after 4,200hr of use. Themachine is expected to last for 8,400 hr, after which itwill be sold at a price equal to 10% of the originalpurchase price. A final set of new tires will not bepurchased before the sale. How much should the ownerof the machine charge per hour of use, if it is expectedthat the machine will operate 1,400 hr per year? Thecompany’s capital rate is 7%.arrow_forwardWith reference to mass haul diagram, explain what is meant by the following terms:-Free haul distance-Overhaul distance-Haul-Waste-Borrowarrow_forward
- A civil engineer involved in construction requires 6000, 5000, and 8000 m³ of sand, gravel, and coarse gravel, respectively, for building project. There are three pits from which these materials can be obtained. The composition of these pits Сoarse Sand% Fine Gravel% Gravel% Pit 1 32 30 38 Pit 2 25 40 35 Pit 3 35 15 50 How many cubic meters must be hauled from each pit in order to meet the engineer's needs? Use at least 2 from any matrix method.arrow_forwardAn open-topped tank is to be cylindrical in shape and have volume 50m3. The cost of the material for the circular base is £38 per m2. The cost of the material used for the curved surface is £(38 + 10) per m2. By first finding a function for the total cost of materials in terms of the radius of the tank, use differentiation to find the radius and height of the tank that minimises the total cost of materials. Give your answers in m, to 2 decimal places.arrow_forwardGiven the list of construction activities for your newly-acquired residential project. Determine the critical path for this project. Activity Depends on Duration (weeks) D A 5 B A 3 G E 3 4 E В. С 2 G. H, I 2 A 4 F C. D 5 E. F A none The critical path for this project is Note: Use this format in your final answer/s, such as if your answer is S, T, U, V, W, then type your final answer as S-T-U-V-Warrow_forward
- If a flight with 500 available seats carries 300 passengers, what is the passenger load factor?arrow_forwardThe Project consists of 10 activities as outlined below. All relationships are finish to start unless noted otherwise. Which option is the critical path? Activity Duration A B C D EF G H 6 5 6 4 4 5 6 6 4 A-C-G-J B-E-H-J A-D-G-J B-F-I-J Predecessors Successors C,D E, F G G H A A FF Lag= 7 B B C, D E F G, H, I J Jarrow_forwardTrue or False? The total machinery area for a machine is determined by identifying the floor space for each machine, machine travel, maintenance and service area requirements.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Concrete Slab Calculations 006; Author: Jerry Howard;https://www.youtube.com/watch?v=R19jILyBxio;License: Standard Youtube License