Fundamentals Of Construction Estimating
4th Edition
ISBN: 9781337399395
Author: Pratt, David J.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 3, Problem 10RQ
What level of accuracy should the estimator pursue in the measurement of work in a takeoff?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Exampte 2
Computing the lengths in feet corresponding to the folowing distances measured
with Gunter's chain: (b): 6 ch 12 lk (HW): (): 24 ch 8 Ik (HW)
QI: Computing the lengths in feet, m, and km corresponding to the
following distances measured with Gunter's chain of (a): 20 ch 25 Ik: (b):
50 ch 5 Ik
A 25-ton truck-mounted hydraulic crane is being used on a construction
site. The maximum horizontal distance from the center of rotation of the
crane to the hoist line of the crane when lifting a load of 9,000 lbs will
be 40 ft. Use Table 16.2 crane data to select the minimum-length boom
required to safely hoist the load.
Solved the problem and show complete solution.
Chapter 3 Solutions
Fundamentals Of Construction Estimating
Ch. 3 - What is the objective of a quantity takeoff?Ch. 3 - Why is it recommended that estimators follow a...Ch. 3 - What is the difference between an estimator’s...Ch. 3 - Prob. 4RQCh. 3 - What are the two components that make up a takeoff...Ch. 3 - In what order are dimensions entered onto the...Ch. 3 - Why should a figured dimension be used in...Ch. 3 - Why should an estimator include headings and side...Ch. 3 - The cost of transportation of materials has to be...Ch. 3 - What level of accuracy should the estimator pursue...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Why is it recommended that estimators follow a standard method of measurement when preparing a takeoff?arrow_forwardWhy should an estimator include headings and side notes throughout a takeoff?arrow_forwardAssume that you wish to evaluate the objective function and feasibility of a problem with N decision variables, X₁, X2, ..., XN, where each variable can take on a value of either 0 or 1, and that a computer can evaluate the objective function and determine the feasibility of 10° possible solutions per second. What is the greatest number of variables N such that the compute could evaluate all possibilities in less than 100 hours? Show your work to receive credit.arrow_forward
- Q: Using the data and collection process information showing in the figure below, answer the following questions Staff 1.750 BS A Staff -3.100 IS Staff 1. What is the height between point C and point D? 2. What is the height between point B and D? 3. At which point the level instrument was moved? Show all calculation process. 1.490 IS Staff C -2.560 FS -4.210 BS Staff 4.200 FSarrow_forwardWhat amount is measured from measuring ground movement (seismometer) and explain the measurement method usedarrow_forwardIn a certain situation repeated measurements of a property are within the experimental precision of the measuring device used, but results suggest a high percentage of error. What could have gone wrong?arrow_forward
- Q2: For the project, its data shown below find: ● Time in weeks that gives a probability of %97.5 Probability of finishing the project 4 weeks more than TE Probability of finishing the project 3 weeks less than TE Act. 1-2 2-3 2-5 2-4 3-4 3-7 5-6 6-7 4-7 0 8 4 7 7 4 7 10 10 4 M 10 5 9 6 8 14 14 5 P 24 12 21 11 8 15 24 24 12arrow_forwardCite some factors that can increase the accuracy of the measurement.arrow_forwardExplain and give examples of systematic errors and random uncertainties that may occur when using these types of equipment: a weighing scale, a thermometer, a colorimeter and a measuring cylinderarrow_forward
- Convert 350 gpm into cfs and m^3/hr. ***Show the complete solution and do not round off in between calculations. Express your final answer in 2 decimal places.***arrow_forwardTrue or false Topic: Quantity surveying 1. wherever possible, estimators should use prices based on experience or developed from actual, similar projects. true or false 2. Equipment costs includes the labor expense of operators true or false 3. Generally, the number of coats required consists of five primer coats and one or thirty topcoats for previously unpainted surfaces. true or false Please answer accurately thank youarrow_forwardQUESTION 7 Level of Service is a quantitative measure used to describe operational conditions. O True Falsearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
What Is A Construction Takeoff? | Are They Still Necessary In Quantity Surveying?; Author: Metroun Quantity Surveying;https://www.youtube.com/watch?v=uTWoDPtcOjg;License: Standard Youtube License