Textbook Question
Chapter 16, Problem 4RQ
Prepare a typical bay estimate based on the following information:
a. Bay size of
b. There are 50 bays in the building.
c. Unit prices:
• Concrete piles: $950.00 each
• Concrete pile caps: $725.00 each
• Slab-on-grade: $12.50 per sq. ft.
• Structural steel frame: $4.90 per sq. ft.
• Roof structure: $10.75 per sq. ft.
• Roofing: $8.20 per sq. ft.
• Plumbing & HVAC: $9.80 per sq. ft.
• Electrical: $6.10 per sq. ft.
• Exterior foundations: $100.00 per linear ft.
• Exterior walls: 728.00 per linear ft.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
How soil is compressed below the pile toe and dragged down along the sides of a pile during installation?
What is pipe piles
How does the value of bearing capacity factor the soil above the pile tip is comparable to the soil below the pile tip?
Chapter 16 Solutions
Fundamentals Of Construction Estimating
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Calculate the cost per cubic yard to place concrete using each of the alternatives described. The work in both cases consists of placing 140 cubic yards of concrete in footings. a. Using a crane and bucket at a price of $225 per hour, including an operator, with a crew consisting of 6 laborers, a cement finisher, and a foreman. The concrete will be placed in 7 hours using this setup, and transportation of the crane costs $390. b. Using a concrete pump at a price of $295 per hour, including an operator and a crew consisting of 5 laborers, a cement finisher, and a foreman. With this setup, concrete is placed in 6 hours and transportation of the pump costs $290.arrow_forwardDescribe the Standard Model of Consolidationarrow_forwardhow did you get 1.025 for solving the pre consolidation?arrow_forward
- SHOW COMPLETE SOLUTIONS AND DRAWINGS: A column with a section of 0.30m x 0.35m is to be filled up class AA reinforced concrete. It is 3.00m in height How many cement bags do you need to fill it up? If you will have a total of 10 columns, how many cubic meters of sand and gravel will you need? Compute for the Total Cost needed for the 10 columns if 1 cement bag is Php 275 pesos, and 1 cubic meter of Sand is sold at Php 1850.00, and 1 cubic meter of Gravel is sold at Php 1950.00. Take note: The Class AA type of concrete mix has 12 bags of cement per cubic meter. To get the volume of the following: Volume of sand= volume of column x 0.50 Volume of Gravel= volume of column x 1.00arrow_forwardWrite a small report of construction materials used on Gariep damarrow_forwardDefine the term Compensation grouting.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Construction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Pricing Concrete Jobs - 24' X 24' Concrete Floor (Prep, Pour, Finish); Author: Mike Day Concrete;https://www.youtube.com/watch?v=V-fgI1Hiu9w;License: Standard Youtube License