Question
Chapter 16, Problem 6RQ
To determine
The unit price of the pile cap assembly shown in the figure below.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Homework # 2
Problem 1
The labor and material cost for a riprapping work is as follows:
Labor:
Materials: (For every 1 cu. m. volume)
1 Foreman @ P500.00 per hour
Cement = 3 bags @ P150.00 per bag
1 Skilled Worker @ p40.00 per hour
Sand = 0.25 cu. m. @P300.00 per cu. m.
5 Unskilled Workers @ P35.00 per hour
Boulder = 1 cu. m. @P250.00 per cu. m.
The accomplishment of the above laborers is 0.45 cubic meter per hour. Profit,
overhead and miscellaneous expenses is 30% of the labor and material cost. Value
Added Tax (VAT) is 10% of the labor cost.
a) Determine the labor cost per cubic meter.
b) Determine the cost of materials per cubic meter.
c) Give the total cost of riprapping per cubic meter.
USE PRESENT WORTH. Show complete solution and cash flow diagram
There is a continuing requirement for stand by electrical power at a public utilityservice facility. Alternative A involves an initial cost of $72,000, a 3-year useful life.and an annual cost of $2,200 the first year and increasing $300 per year thereafterand a net salvage value of $8,400 at the end of the useful life. Alternative B has aninitial cost of $90,000. a six-year useful life, and annual cost of 2,100 and a netsalvage value of $13,000. The current interest rate is 10% annually. Whatalternative are you going to recommend if you use co terminated (study period is 3 years, epsilon = 10%) assumption?
how did you get 1.025 for solving the pre consolidation?
Chapter 16 Solutions
Fundamentals Of Construction Estimating
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Calculate the cost per cubic yard to place concrete using each of the alternatives described. The work in both cases consists of placing 140 cubic yards of concrete in footings. a. Using a crane and bucket at a price of $225 per hour, including an operator, with a crew consisting of 6 laborers, a cement finisher, and a foreman. The concrete will be placed in 7 hours using this setup, and transportation of the crane costs $390. b. Using a concrete pump at a price of $295 per hour, including an operator and a crew consisting of 5 laborers, a cement finisher, and a foreman. With this setup, concrete is placed in 6 hours and transportation of the pump costs $290.arrow_forwardA project to move packed earth requires you to decide whether to use a dozer/scraper operation or excavator/truck operation. Determine the most economical operation based on the dozer/scraper operation estimated at $1.25/cy. All equipment carries a rated heaped capacity, has a fill factor of 100%, and works 45-min hours. Excavator costs $95/hr (including operator), cycle time is 0.28 min, and bucket heaped capacity is 5.0 cy. Truck costs $150/hr (including operator), dump time is 0.5 min (maneuver, dump, turn), heaped capacity is 31.7 cy, and 12 trucks are available for the project. Hauling equipment operates in one direction from A to B to C and finally to D. Section ABCD Load full full empty empty Length (ft) 3,000 2,500 3,000 3,000 Speed (mph) 9 17 36 16arrow_forwardGiven the following information, determine the cost of excavation, the number of loads required toremove the material and how many days it will take to complete the job.o 5225m3 of material is to be excavatedo Equipment cost is $280/houro Operator cost is $55/houro Equipment can remove 55m3/houro Assume 20% swell in soil when excavated for removal off siteo Trucks can carry 10m3o Work 10hr daysarrow_forward
- 5.26 An industrial engineer is considering two robots for purchase by a fiber-optic manufacturing com- pany. Robot X will have a first cost of $80,000, an annual maintenance and operation (M&O) cost of S30,000, and a $40,000 salvage value. Robot Y will have a first cost of $97,000, an annual M&O cost of $27,000, and a $50,000 salvage value. Which should be selected on the basis of a future worth comparison at an interest rate of 15% per year? Use a 3-year study period.arrow_forwardA project to move packed earth requires you to decide whether to usea dozer/scraper operation or excavator/truck operation. Determinethe most economical operation based on the dozer/scraper operationestimated at $1.25/cy. All equipment carries a rated heaped capacity, hasa fill factor of 100%, and works 45-min hours. Excavator costs $95/hr(including operator), cycle time is 0.28 min, and bucket heaped capacityis 5.0 cy. Truck costs $150/hr.(including operator), dump time is 0.5 min(maneuver, dump, turn), heaped capacity is 31.7 cy, and 12 trucks areavailable for the project.Hauling equipment operates in one directionfrom A to B to C and finally to D. Section Load Length (ft) Speed (mph) A full 3000 9B full 2500 17C empty 3000 36D empty 3000 16arrow_forward2.1) Show your calculation in determining the total required storage yard for reinforcing steel bar (A) in m' given that:- the total quantity of rebar required for the project (Q) = 1,800 tons, project duration (T) = 120 days, the average stock (t) = 7 days, fluctuation factor of usage (k) = 0.80, quantity of rebar can be stored/m (g.) = 1.40 tons/m, and • utilization index for rebar () = 0.75arrow_forward
- What is shovel productivity? What is factored into shovel productivity?arrow_forwardCalculate the total operation time for this construction activity if the volume of soil to be removed is 8 cu.m. (considered 33% for bulking of materials.) The speed of dumptruck is 30 kph and travel distance (round trip) from the source to disposal area vice-versa is 6 km. The bucket size of excavator is 0.50 cu.m at 0.50 min loading time, tipping time is 4 mins. a. 15.18 minutes b. 22.02 minutes c. 25.32 minutes d. 30.00 minutesarrow_forwardCalculate for the labor cost per square meter of CHB laying considering the following data: Labor Productivity = 12 sq.m. per day Gang Rates: Labor Rate @ 1 mason per diem = Php 856.00 Labor Rate @ 1 Labor per diem = Php 581.00 a. Php 119.75 per sq.m b. Php 958.00 per sq.m c. Php 1,077.75 per sq.m d. Php 2,155.50 per sq.marrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,