Students have asked these similar questions
Use time and location indices given is the table to prepare the conceptual cost
estimate of a building with 62700 m² of floor area and location is city B. A similar type of building that
cost Rs. 21,97,540 of area 38500 m² completed 2 years ago in city E. Estimate the probable cost of
proposed buildings.
Year construction
3 years ago
years ago
1 year ago
Current year
Cost (million)
358
359
362
378
Cost index
For city
B = 1.24
E = 1.17
a)
The GFA method is usually used for estimating building services components. It can
produce a very fast result but not very accurate. Below are the plan and section view of
a building. Calculate the cost of building using 'GFA Method'. You should provide all
the breakdown details of the calculation. You should make your own assumptions on any
data not provided.
Unit Price: RM 350.00/m2
300m
125m
50m
225m
100m
50m
350m
PLAN VIEW
Predicting construction cost using multiple regression techniques analysis.
Knowledge Booster
Similar questions
- What are the three degrees of accuracy that are acknowledged in capital cost estimation?arrow_forwardThe following information belongs to a target cost contract: Target cost = $250 M Target band = $230 M and ends $270 M Target contractor fee = $10.5 M Cost saving share = 55/45 by owner Cost increase share = 65/35 by contractor Contractor minimum fees =$5 M The GMC = $320 M Minimum expected project cost = $ 200 M Calculate the contractor fee, if the project cost is 280 M? Select one: a. 6 M b. 3 M c. 4 M d. 5 Marrow_forwardB. Given Table Construction Economic Trends 5 years ago 4 years ago 3 years ago 2 years ago 1 year ago Current Year 438 415 368 369 333 378 Location Cost Indices City A City B City C City D 1.033 1.125 1.278 1.345 Suppose that the construction cost of a project completed at city C is LE3,357,890, it is required to prepare a conceptual estimate for a similar project proposed in city A. (arrow_forward
- Explain the difference between unit-cost estimating methodsand resource enumeration methods. When would youuse unit cost? When would you use resource enumeration?arrow_forward3) For the construction of the final stage of a university laboratory building, the site engineer decided to purchase 12 beams whose value (in dollars) varies according to the length of the beam. In the last quote received by the engineer is the unit cost that the 12 beams would have, it is as follows: 2500 2600 2550 2480 2560 2570 2490 2490 2530 2510 2490 2410 a. The lot purchase criteria establishes that it should be acquired if its average cost does not belong to the cheapest 10% of lots or to the most expensive 10% of lots that have been purchased for the construction of the entire building. If it is known that the beams that have been purchased throughout the project have had a normally distributed cost with an average of $2,540, what should the engineer's decision be and why? b. What must be the minimum and maximum average costs of the lot so that it can be purchased?arrow_forwardConsider the bid rent curve (R) for the office sector (OS) and household sector (HH). Allow for both consumer substitution (CS) and factor substitution (FS). Draw the initial land use pattern in the urban area. Be sure to identify the boundaries and the initial land area for each sector. Label everything. Suppose an innovation in construction allows stackable buildings (no additional reinforcement is required for taller buildings) in Lego-Spider City. In addition, workers acquire new climbing skills and are able to rappel up and down the outside of the building and into and out of the residences to their workplaces. llustrate the impact of such shocks on the R curves of both sectors. Briefly explain the relative shape and position of each curves. What happens to the land area of the OS and land area of the HH sector?arrow_forward
- 20 Imagine that you want to add a bathroom to a house. You get a copy of a cost estimating guide and multiply the cost per square foot for a bathroom addition by the number of square feet of the bathroom. This is an example of what estimating method? A O Square foot method. BO Build-cost capitalization method. Stick and unit methods. Ballpark figure method.arrow_forwardDetermine four reliable sources of building material pricing data.arrow_forward1. After determining the various materials needed for the construction project, why is it that data should be organized and presented like the sample of bill of materials?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,