Grace Greenberg, production planner for Science and Technology Labs, in New Jersey, has the master production plan shown below:
Lead time = 1 period; setup costs = $200; holding cost = $10 per week; stockout cost = $10 per week. Develop an ordering plan and costs for Grace, using these techniques:
- a. Lot-for-lot.
- b. EOQ.
- c. POQ.
- d. Which plan has the lowest cost?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
M. de Koster, of Rene Enterprises, has the master production plan shown here: Lead time = I period; setup cost= $200; holding cost = $10 perweek; stockout cost = $10 per week. Your job is to develop an ordering plan and costs for:a) Lot-for-lot. b) EOQ.c) POQ. d) Which plan has the lowest cost?
Heather Adams, production manager for a Colorado exercise equipment manufacturer, needs to schedule an order for 50 UltimaSteppers, which are to be shipped in week
8.
Subscripts indicate quantity required for each parent. Assume lot-for-lot ordering.
Item
Lead Time
On-Hand Inventory
Components
Stepper
2
20
A(2),
B(2),
C(2)
A
1
10
D(1),
F(2)
B
2
20
E(2),
F(3)
C
2
10
D(2),
E(1)
D
1
15
E
2
5
F
2
20
c) Develop a net material requirements plan for F (enter your responses as whole numbers).
Week
Lead Time
Item
1
2
3
4
5
6
7
8
(weeks)
F
Gross req
2
On hand
Net req
enter your response here
enter your response here
Order receipt
enter your response here
enter your…
Heather Adams, production manager for a Colorado exercise equipment manufacturer, needs to schedule an order for 50 UltimaSteppers, which are to be shipped in week 10. Subscripts indicate quantity required for each parent. Assume lot-for-lot ordering.
Item
Lead Time
On-Hand Inventory
Components
Stepper
2
10
A(2),
B(2),
C(1)
A
1
10
D(1),
F(2)
B
2
20
E(1),
F(3)
C
3
10
D(2),
E(3)
D
2
15
E
2
5
F
2
20
c) Develop a net material requirements plan for F (enter your responses as whole numbers).
Week
Lead Time
Item
3
4
5
6
7
8
9
10
(weeks)
F
Gross req
enter your response here
enter your response here
2
On hand
enter your response here
enter your response here
Net req
enter your response here
enter your response here
Order…
Chapter 14 Solutions
Mylab Operations Management With Pearson Etext -- Access Card -- For Operations Management: Sustainability And Supply Chain Management (13th Edition)
Ch. 14 - Prob. 1EDCh. 14 - What is the difference between a gross...Ch. 14 - Prob. 2DQCh. 14 - What are the similarities between MRP and DRP?Ch. 14 - How does MRP II differ from MRP?Ch. 14 - Which is the best lot-sizing policy for...Ch. 14 - What impact does ignoring carrying cost in the...Ch. 14 - MRP is more than an inventory system; what...Ch. 14 - What are the options for the production planner...Ch. 14 - Master schedules are expressed in three different...
Ch. 14 - What functions of the firm affect an MRP system?...Ch. 14 - Prob. 11DQCh. 14 - Identify five specific requirements of an...Ch. 14 - What are the typical benefits of ERP?Ch. 14 - What are the distinctions between MRP, DRP, and...Ch. 14 - As an approach to inventory management, how does...Ch. 14 - What are the disadvantages of ERP?Ch. 14 - Use the Web or other sources to: a. Find stories...Ch. 14 - Prob. 18DQCh. 14 - Use the Web or other sources to identify what an...Ch. 14 - You have developed the following simple product...Ch. 14 - You are expected to have the gift bags in Problem...Ch. 14 - The demand for subassembly S is 100 units in week...Ch. 14 - Using the information in Problem 14.3, construct a...Ch. 14 - Using the information in Problem 14.3, construct a...Ch. 14 - Refer again to Problems 14.3 and 14.4. In addition...Ch. 14 - Refer again to Problems 14.3 and 14.5. In addition...Ch. 14 - As the production planner for Scott Sampson...Ch. 14 - Prob. 4PCh. 14 - a. Given the product structure and master...Ch. 14 - Prob. 11PCh. 14 - Based on the data in Figure 14.13, complete a net...Ch. 14 - Prob. 13PCh. 14 - A part structure, lead time (weeks), and on-hand...Ch. 14 - You are product planner for product A (in Problem...Ch. 14 - Prob. 16PCh. 14 - Data Table for Problems 14.17 through 14.20 14.17...Ch. 14 - Develop an EOQ solution and calculate total...Ch. 14 - Develop a POQ solution and calculate total...Ch. 14 - Using your answers for the lot sizes computed in...Ch. 14 - Prob. 26PCh. 14 - Grace Greenberg, production planner for Science...Ch. 14 - Karl Knapps, Inc., has received the following...Ch. 14 - Coleman Rich, Ltd., has received the following...Ch. 14 - Prob. 31PCh. 14 - Prob. 32PCh. 14 - Prob. 18PCh. 14 - When 18,500 Orlando Magic Fans Come to Dinner...Ch. 14 - When 18,500 Orlando Magic Fans Come to Dinner...Ch. 14 - When 18,500 Orlando Magic Fans Come to Dinner...Ch. 14 - MRP at Wheeled Coach Video Case Wheeled Coach, the...Ch. 14 - MRP at Wheeled Coach Video Case Wheeled Coach, the...Ch. 14 - MRP at Wheeled Coach Video Case Wheeled Coach, the...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Assume you are the manager of a shop that assembles power tools. You have just received an order for 55 chain saws, which are to be shipped at the start of week 8. Pertinent information on the saws follows: Item Lead Time (weeks) On Hand Saw A B C D E F 2 1 2 2 1 1 2 Gross requirements Scheduled receipts Projected on hand Net requirements Planned order receipt Planned order release Ĉ E(3) & E(2) LT = 1 week Lot size: Lot-for-Lot 15 10 5 65 20 10 30 Skip Extension Tip: Double click to open in new tab Show Transcribed Text Develop the material requirements plan for component E using lot-for-lot ordering for all items. (Leave no cells blank - be certain to enter "0" wherever required.) Components A(2), B(1), C(4) E(3), D(1) D (2), F(3) E(2), D (2) Beg. Inv. 1 2 3 190 5 210 6arrow_forwardUsing the gross requirements schedule below*, prepare an alternative ordering system that orders every 3 weeks for 3 weeks ahead (a periodic order quantity). What is the cost of this ordering system? Period 1 2 3 4 5 6 7 Gross requirements 25 20 40 0 10 50 30 The cost of this ordering system is $ Prepare a net requirements plan (enter your responses as whole numbers). *Holding cost = $1/unit/week; setup cost = $200; lead time = 1 week; beginning inventory = 25 units. Period Gross requirements On-hand at beginning of period On-hand at end of period Net requirements Order receipt Order release (enter your response as a whole number). 25 1 25 2 20 3 40 4 5 0 10 8 0 6 50 9 10 30 65 7 30 8 9 10 0 30 65arrow_forward1. The Wicked Witch Whisk Company manufactures a line of broomsticks. The mostpopular is the 36-inch model, and the sales department has prepared a forecast for 6weeks. The opening inventory is 30. As master scheduler, you must prepare an MPS.The brooms are manufactured in lots of 100.arrow_forward
- 4.7 Complete the following table. Lead time for the part is two weeks. The lot size is 50. What is the projected available at the end of week 3? When is it planned to release an order? Week Gross Requirements Scheduled Receipts 1 2 3 4 30 25 10 10 10 50 Projected Available 10 Net Requirements Planned Order Receipt Planned Order Releasearrow_forwardThe annual demand of ABC Inc. sole product totaled 450,000 units. Due to uncertainty in supply of items, the maximum possible lead time for the orders is 2 weeks and 1 day. A safety stock of 6,250 units is determined. What is the normal lead time? (Use 360 days) Choices: 1 week and 5 days 1 week 9 days 10 daysarrow_forwardComplete the MPS record below for an end item. (Enter your responses as integers. A response of "0" is equivalent to being not applicable.) Order Policy: 100 units Lead Time: 2 weeks Quantity on Hand: 80 Week 1 2 3 4 5 6 7 8 9 10 Forecast 25 25 35 45 25 20 45 55 Customer orders 25 30 7 11 (booked) Projected on-hand inventory MPS quantityarrow_forward
- a. If demand for the new videotape recorder is expected to be constant with a rate of 20 units per month, what is the recommended order quantity for the videotape recorder? b. What are the estimated annual inventory holding and ordering costs associated with this product? c. How many orders will be placed per year? d. With 250 working days per year, what is the cycle time for this product?arrow_forwardComplete the MPS record below for a single item. (Enter your responses as integers. A response of "0" is equivalent to being not applicable.) Order Policy: 100 units Lead Time: 1 week February Item: A Quantity on Hand: 80 Forecast Customer orders (booked) Projected on-hand inventory MPS quantity 1 60 35 20 0 January 2 70 15 3 18 8 60 90 BID 4 40 0 LE Week 5 45 30 6 45 70 7 55 0 8 50 0arrow_forward2.7 Which of the following help explain how the Reorder Point (ROP) works in conjunction with the Economic Order Quantity (Q), the number of orders (N) and the time between orders (T)? a) The Economic Order Quantity (Q) and the Annual Demand (D) are used to determine the number of Order (N) b) The number of orders (N) and the number of days that a firm works (W) are used to determine the time span between orders (T) c) Orders are placed every T days unless the inventory on hand fall to or below the Reorder Point d) Only a and b e) f) Only b and c All of a, b and c 2.8 The objective of Inventory Management is to balance inventory investment (cost) and customer service. a) TRUE b) False 2.9 The Economic Order Quantity (EOQ), the number of orders, the Reorder Point (ROP), the time between orders are important analytics in Inventory Management. a) TRUE b) FALSE 2.10 The number of working days for a firm is an important input in calculating the components of the Economic Order Quantity…arrow_forward
- The Shades Sunglass Company assembles sunglasses from frames, which it makes,and lenses, which it purchases from an outside supplier. The sales department hasprepared the following 6-week forecast for Ebony, a popular model. The sunglassesare assembled in lots of 220, and the opening inventory is 300 pairs. Complete theprojected available balance and the master production schedule.arrow_forwardA Corporation assembles two products as shown in the product structures below. It has orders for 480 on period 8 and 100 units on period 9 of product X.. Develop the MRP table for each of the items. Item Amount on hand Schedule receipts Lot-sizing rule X 180 0 L4L A 100 0 Periodic order quantity (2 weeks) B 50 0 100 C 50 0 200 D 50 0 400 X LT = 2 A (2) LT = 2 B (1) LT = 2 C (3) LT = 1 D (1) LT = 3 D (2) LT =2arrow_forwardHeather Adams, production manager for a Colorado exercise equipment manufacturer, needs to schedule an order for 50 UltimaSteppers, which are to be shipped in week 8. Assume lot-for- lot ordering. Below is information about the steppers and the quantity required for each parent. Item Lead Time On Hand Inventory Components Stepper 2 20 A(1), B(3), C(2) A 1 10 D(1), F(2) B 2 30 E(1), F(3) C 3 10 D(2), E(3) D 1 15 E 2 5 F 2 20 Develop a product structure diagram for Develop a net material requirements plan forarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY