Question
Chapter 11, Problem 30FE
To determine
Calculate the maximum acceptable cost.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
You are about to buy a piece of equipment (machine Alpha) for a project.
The initial cost is $500,000 and the annual maintenance costs is
$15,000. Another company offers you a second option (Machine Beta)
for which the annual maintenance cost is $20,000. What is the
maximum price (the initial cost) you would be willing to pay for the
second option? Both machines have the same useful life of 11 years and
the difference between their performances is negligible. Assume an
annual interest rate of 4%.
$767,524
$667,197
$456,197
$567,524
A food processing plant consumed 450,000 kW of electric energy annually and pays an average of P2.00 per kWh. A study is being made to generate its own power to supply the plant the energy required, and that the power plant installed would cost P2,000,000. Annual operation and maintenance, P800,000. Other expenses P100,000 per year. Life of power plant is 15 years; salvage value at the end of life is P200,000; annual taxes and insurances, 4% of first cost; and rate of interest is 14%. What is the rate of return? Is the power plant justifiable?
A car is needed for three years. Plans A and B for acquiring the car are being evaluated. An effective annual interest rate of 10% is to be used. Which plan is economically superior?
Plan A: Lease the car for $0.25/mile (all inclusive)
Plan B: Purchase the car for $30,000. Keep the car for three years. Sell the car after three years for $7200. Pay $0.14 per mile for oil and gas. Pay other costs of $500 per year.
Chapter 11 Solutions
Engineering Economy (17th Edition)
Ch. 11 - Prob. 1PCh. 11 - Refer to Example 11-2. Assuming gasoline costs...Ch. 11 - Prob. 3PCh. 11 - Prob. 4PCh. 11 - Prob. 5PCh. 11 - Prob. 6PCh. 11 - Prob. 7PCh. 11 - Prob. 8PCh. 11 - Prob. 9PCh. 11 - Prob. 10P
Ch. 11 - Prob. 11PCh. 11 - Prob. 12PCh. 11 - Prob. 13PCh. 11 - Prob. 14PCh. 11 - Prob. 15PCh. 11 - Prob. 16PCh. 11 - Prob. 17PCh. 11 - Prob. 18PCh. 11 - Prob. 19PCh. 11 - A bridge is to be constructed now as part of a new...Ch. 11 - An aerodynamic three-wheeled automobile (the Dart)...Ch. 11 - Prob. 23PCh. 11 - Prob. 24SECh. 11 - Prob. 25SECh. 11 - Prob. 26SECh. 11 - Prob. 27SECh. 11 - Prob. 28SECh. 11 - Prob. 29SECh. 11 - Prob. 30FECh. 11 - Prob. 31FECh. 11 - A supermarket chain buys loaves of bread from its...Ch. 11 - A supermarket chain buys loaves of bread from its...Ch. 11 - Prob. 34FECh. 11 - Prob. 35FECh. 11 - Prob. 36FECh. 11 - Prob. 37FECh. 11 - Prob. 38FECh. 11 - Prob. 39FECh. 11 - Prob. 40FECh. 11 - Prob. 41FECh. 11 - Prob. 42FE
Knowledge Booster
Similar questions
- A food processing plant consumed 600,000 kW of electric energy annually and pays an average of P2.50 per kWh. A study is being made to generate its own power to supply the plant the energy required, and that the power plant installed would cost P2,000,000. Annual operation and maintenance, P800,000. Other expenses P100,000 per year. Life of power plant is 15 years; salvage value at the end of life is P200,000; annual taxes and insurances, 6% of the first cost; and rate of interest is 15%. Using the sinking fund method for depreciation, what is the cost savings/loss if the power plant is to be generated (indicated negative(-) sign if the cost is a loss) using the Present Worth Method.arrow_forwardA bridge is to be constructed now as part of a new road. Engineers have determined that traffic density on the new road will justify a two-lane road and a bridge at the present time. Because of uncerta. regarding future use of the road, the time at which an extra two lanes will be required is currently being studied. The two-lane bridge will cost $210,000 and the four-lane bridge, it built initially, will cost $400,000. The future cost of widering a two-lane bridge to four lanes will be an extra $210,000 plus $23,000 for year that widening is delayed The MARR used by the highway department is 15% per year. The following estimates have been made of the times at which the four-lane bridge will be required: 4 years Pessimistic estimate Most likely estimate 5 years 9 years Optimistic estimate In view of these estimates, what would you recommend? List some advantages and disadvantages of this method of preparing estimates Click the icon to view the interest and annuity table for discrete…arrow_forwardYour company is considering the introduction of a new product line. The initial investment required for this project is $500,000, and annual maintenance costs are anticipated to be $45,000. Annual operating costs will be directly proportional to the level of production at $8.50 per unit, and each unit of product can be sold for $65. If the MARR is 15% and the project has a life of 5 years, what is the minimum annual production level for which the project is economically viable? The equipment can be sold for $80,000 at the end of five years.arrow_forward
- solve it using manual computation; do not use Microsoft Excel The Ajax Corporation has an overhead crane that has an estimated remaining life of 10 years. The crane can be sold now for $8,000. If the crane is kept in service, it must be overhauled immediately at a cost of $5,000. Operating and maintenance costs will be $3,000 per year after the crane is overhauled. The overhauled crane will have zero MV at the end of the 8-year study period. A new crane will cost $20,000, will last for 8 years, and will have a $4,000 MV at that time. Operating and maintenance costs are $1,000 per year for the new crane. The company uses a before-tax interest rate of 10% per year in evaluating investment alternatives. Should the company replace the old crane?arrow_forwardFive years ago a dam was constructed to impound irrigation water and to provide flood protection for the area below the dam. Last winter a 100-year flood caused extensive damage both to the dam and to the surrounding area. This was not surprising, since the dam was designed for a 50-year flood. The cost to repair the dam now will be $250,000. Damage in the valley below amounts to $750,000. If the spillway is redesigned at a cost of $250,000 and the dam is repaired for another $250,000, the dam may be expected to withstand a 100-year flood without sustaining damage. However, the storage capacity of the dam will not be increased and the probability of damage to the surrounding area below the dam will be unchanged. A second dam can be constructed up the river from the existing dam for $1 million. The capacity of the second dam would be more than adequate to provide the desired flood protection. If the second dam is built, redesign of the existing dam spillway will not be necessary, but…arrow_forwardThe purchase of a used pick-up truck for $9,000 is being considered. Records for other vehicles show that costs for oil, tires, and repairs roughly equal the cost for fuel. Fuel costs are $990 a year if the truck is driven 16,000 km. The salvage value after five years of use drops by $0.05 per km. Find the equivalent uniform annual cost if the discount rate is 8%. How much does this change if the annual mileage is 24,000 km? 8,000 km? Assume that, drop in Salvage Value is based on total kilometers driven, rather than the annual distance driven.arrow_forward
- K CB Electronix needs to expand its capacity. It has two feasible alternatives under consideration. Both alternatives will have essentially infinite lives. Alternative 1: Construct a new building of 20,000 square metres now. The first cost will be $2,300,000. Annual maintenance costs will be $7,000. In addition, the building will need to be painted every 15 years (starting in 15 years) at a cost of $11,000. Alternative 2: Construct a new building of 12,500 square metres now and an additional 7,500 square metres in 9 years. The first cost of the 12,500-square-metre building will be $1,350,000. The annual maintenance costs will be $3,000 for the first 9 years (i.e., until the addition is built). The 7,500-square-metre addition will have a first cost of $1,300,000. Annual maintenance costs of the renovated building (the original building and the addition) will be $9,000. The renovated building will cost $11,000 to repaint every 15 years (starting 15 years after the addition is done).…arrow_forwardThe purchase of a motor for $11,823.97 and a generator for $6,415.31 will allow a company to produce its own energy. The configuration can be assembled for $1,036.99. The service will operate for 2,920.98 hours/year for 10 years. The maintenance cost is $300/year, and the cost to operate is $0.85/h for fuel and related costs. There is $458.02 in salvage value for the system at the end of 10 years. Using straight line depreciation, what is the annual cost for the operation?arrow_forwardA bridge is to be constructed now as part of a new road. Engineers have determined that current traffic volume on the new road will justify a two-lane road and a bridge at the present time. Because of the uncertainty regarding future traffic, the time at which the additional two lanes will be required is currently being studied. Two alternatives are being considered. Alternative 1 - One-stage construction: Build a four lane bridge right now for $360,000. Alternative 2 - Two-stage construction: Start with a two-lane bridge now for $170,000 and widen to four lanes later when traffic justifies. The future cost of widening the bridge to four-lanes at that time will be $170,000 plus an extra $23,000 for every year that widening is delayed. For example, if future widening is done at the end of year 7, the cost of widening at that time will be equal to $170,000 + 7x($23,000) = $331,000. The following estimates have been made of when widening to a four-lane bridge will be required: Pessimistic…arrow_forward
- An integrated, combined cycle power plant produces 290 MW of electricity by gasifying coal. The capital investment for the plant is $530 million, spread evenly over two years. The operating life of the plant is expected to be 15 years. Additionally, the plant will operate at full capacity 74% of the time (downtime is 26% of any given year). The MARR is 5% per year. a. If this plant will make a profit of three cents per kilowatt-hour of electricity sold to the power grid, what is the simple payback period of the plant? Is it a low-risk venture? b. What is the IRR for the plant? Is it profitable?arrow_forwardAn integrated, combined cycle power plant produces 295 MW of electricity by gasifying coal. The capital investment for the plant is $450 million, spread evenly over two years. The operating life of the plant is expected to be 15 years. Additionally, the plant will operate at full capacity 72% of the time (downtime is 28% of any given year). The MARR is 8% per year. a. If this plant will make a profit of two cents per kilowatt-hour of electricity sold to the power grid, what is the simple payback period of the plant? Is it a low-risk venture? b. What is the IRR for the plant? Is it profitable? a. The simple payback period of the plant is 12.1 years. (Round up to one decimal place.) It's a high-risk venture. b. The IRR for the plant is %. (Round to one decimal place.)arrow_forwardA highway bridge is being considered for replacement. The new bridge would cost $X and would last for 20 years. Annual maintenance costs for the new bridge are estimated to be $25,000. People will be charged a toll of $0.26 per car to use the new bridge. Annual car traffic is estimated at 410,000 cars. The cost of collecting the toll consists of annual salaries for five collectors at $11,000 per collector. The existing bridge can be refurbished for $1,300,000 and would need to be replaced in 20 years. There would be additional refurbishing costs of $65,000 every five years and regular annual maintenance costs of $18,000 for the existing bridge. There would be no toll to use the refurbished bridge. If MARR is 15% per year, what is the maximum acceptable cost (X) of the new bridge?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education