Concept explainers
You work for a small shipping company and warehouse. The owners have decided to update the software used for tracking, shipping, receiving, and inventory. Fifteen computers need to be updated. Hours of operation are 7 a.m. to 7 p.m. Monday through Saturday. Each computer must be updated manually by one of two trained employees, both of whom must be borrowed from other managers. The update procedure consumes 4 hours of the updater's time and generates an additional 1.5 hours of computer downtime. The work must be performed at a central loading station, away from the current location of the computer.
How does the project
Trending nowThis is a popular solution!
Step by stepSolved in 4 steps
- . The primary purpose of the “Single-Minute Exchange of Die” philosophy is to:a. reduce the setup time for a resource.b. increase the flow rate of a process.c. decrease the utilization of a process.d. eliminate resources that have setup times.arrow_forwardI have $1500.00 I have to save 20% of it.arrow_forwardJCL Inc. is a major chip manufacturing firm that sells its products to computer manufacturers like Dell, Gateway, and others. In simplified terms, chip making at JCL Inc. involves three basic operations: depositing, patterning, and etching. Depositing: Using chemical vapor deposition (CVD) technology, an insulating material is deposited on the wafer surface, forming a thin layer of solid material on the chip. Patterning: Photolithography projects a microscopic circuit pattern on the wafer surface, which has a light-sensitive chemical like the emulsion on photographic film. It is repeated many times as each layer of the chip is built. Etching: Etching removes selected material from the chip surface to create the device structures. The table below lists the required processing times and setup times at each of the steps. There is unlimited space for buffer inventory between these steps. Assume that the unit of production is a wafer, from which individual chips are cut at a later…arrow_forward
- You are the manager of a clinical laboratory at a mid-size (200-bed) community hospital. Physicians and nurses are concerned about the turnaround time for laboratory tests ordered on early morning rounds. It appears that the samples are collected by the phlebotomy team on the 6:00 A.M. rounds. Physicians begin their patient rounds at 7:30 A.M. The physicians prefer to review the results of the laboratory tests ordered at the time they see the patient. They explain to you that they cannot make decisions with regards to further patient treatment or dischargewithout these results. Time is of the essence, as the hospital is cutting the budget, and it is important to decrease the patient length of stay. You are expected to look into this matter and make recommendations regarding the most efficient and effective way to address this problem. Question: 1. What is the best method of addressing this problem? (What styles is the best in managing the field Autocratic, democratic or laissez-faire.)arrow_forwardEach column must have at least one value in some row to enable Pivot Tables to work properly. True Falsearrow_forwardP1 P4 P2 P3 P5 P5 P5 P6 ... P1 has a production rate of 15 units/hour, P2 = 30 units/hour, P3 = 10 units per hour, P4 = 4 units/hour, P5 = 1 unit(s) per hour for each P5 and P6 = 6 units per hour. Operation P4 occurs seperately from and simultaneously with operations P1-P3. Operation P5 has three parallel and identical lines; therefore, each part only needs to go through one of the three lines. Consider the following two independent improvements: Improvement 1: Change station P4 into two connected stations (P4-1 and P4-2, connected in series) that have process times of 4 min/unit and 6 min/unit respectively. Improvement 2: Add two additional P5 stations to give you 5 parallel and identical lines. Improvement 2 increases capacity because it improves the bottleneck. The new bottleneck is station P4 since the original bottleneck has a process time of The new yearly capacity would be units per year. a) Which of the two improvements will provide the largest increase in capacity? What is the…arrow_forward
- Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use of kanban to pull material through its manufacturing cells. Meritor has designed each cell to fabricate a specific family of muffler products. Fabricating a muffler assembly involves cutting and bending pieces of pipe that are welded to a muffler and a catalytic converter. The mufflers and catalytic converters are pulled into the cell based on current demand. The catalytic converters are made in a specialized cell. Catalytic converters are made in batches of 10 units and are moved in special hand carts to the fabrication cells. The catalytic converter cell is designed so that different types of catalytic converters can be made with virtually no setup loss. Meritor hires a team of consultants. The consultants suggest a partial robotic automation as well as the safety stock to be 9 percent. Meritor implements these suggestions. The result is an increase in efficiency in both the…arrow_forwardYou are the manager of a clinical laboratory at a mid-size (200-bed) community hospital. Physicians and nurses are concerned about the turnaround time for laboratory tests ordered on early morning rounds. It appears that the samples are collected by the phlebotomy team on the 6:00 A.M. rounds. Physicians begin their patient rounds at 7:30 A.M. The physicians prefer to review the results of the laboratory tests ordered at the time they see the patient. They explain to you that they cannot make decisions with regards to further patient treatment or dischargewithout these results. Time is of the essence, as the hospital is cutting the budget, and it is important to decrease the patient length of stay. You are expected to look into this matter and make recommendations regarding the most efficient and effective way to address this problem. Question: 1. What decision-making tools would facilitate the analysis of the problem?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.