Structural Analysis
6th Edition
ISBN: 9781337630931
Author: KASSIMALI, Aslam.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
thumb_up100%
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by stepSolved in 4 steps with 5 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- 3(b) Another section of the highway has the Following Flow density relationship: q = 50k - 0.156 k²; H q= (v) 2M2 at bas Determine: 9977 Fa (i) the maximum flow (qmax) of the highway Section? (0) Lii) the speed at maximum flow? booge wolf - A 14 (1) Ciii) the density (K) when the highway is at one-quarter of its capacity?arrow_forwardA four-lane freeway (two lanes in each direction) operates at capacity during the peak hour. It has 11-ft lanes, 4-ft shoulders, and there are three ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. The freeway has only regular users, there are 8% large trucks and buses (no recreational vehicles), and it is on rolling terrain with a peak-hour factor of 0.85. It is known that 12% of the AADT occurs in the peak hour and that the directional factor is 0.6. What is the freeway's AADT?arrow_forwardi need correct solution asap in 20 minsarrow_forward
- Problem 2. Consider a freeway section with three lanes in each direction and with a length of 1.25mi (2km) and a +5% grade. In this freeway, the directional peak-hour volume is 3,800 veh/h, from which 76 are trucks and 152 are transit buses. The maximum 15-min volume within the hour of analysis is 1,055 vehicles. The lane widths are 12 ft (3.6m), and shoulder widths are 10 ft (3.1m). There are 2 exit ramps and 1 entrance ramp in the 3 miles in the upstream section and 1 exit ramp and 2 entrance ramp in the 3 miles in the downstream section (consider the same ramp density if using international (km) units). All transit buses will be removed from traffic since the transit service will be replaced by a commuter rail service. However, by removing buses, new additional passage car demand is expected. It is estimated that for each removed bus, 7 new passenger cars will be added to the original traffic volume of 3,800 veh/h. Question: Determine the change in speed and traffic density before…arrow_forwardA California freeway has four lanes in each direction and carries a traffic volume of 4000 veh/h. The lane width is 11 ft, right shoulder lateral clearance is 5 ft, and there are four interchanges in every six miles of this freeway. Each interchange has two ramps, one for entry and one for exit. There is a 1 mile long section of this freeway that has a 6% upgrade. It is known that on this segment 5% of the traffic is SUTs and 5% is TTs. Peak-hour factor (PHF) is 0.90. Determine the LOS for this segment.arrow_forward8. A two-lane highway is expected to serve ADT of 5000 veh, find DHV and DDHV in veh and pcu if the following information is given: K=0.1, D=0.6 Traffic composition includes 80 passenger cars and 20% trucks.arrow_forward
- Consider the freeway and traffic conditions described in Problem 6.3. If 180 of the 1800 vehicles observed in the peak hour were large trucks and buses, what would the level of service of this freeway be on a 5-mi, 6% downgrade?arrow_forwardA six-lane divided miltilane highway (three lanes in each direction) has a measured FFS of 70 mi/h. It is on rolling terrain with a traffic stream consisting of 17% heavy vehicles. One direction of the highway currently operates at maximum LOS C conditions, and it is known that the highway has PHF = 0.70. How many vehicles can be added to this highway (ignore capacity), assuming the proportion of vehicle types remain the same but the peak-hour factor increases to 0.89. (Note: range +/-3, round to the nearest vehicle)arrow_forwardQ: The expected daily traffic (AADT) for tow-way on a major six-lane flexible pavement highway consists of trucks of type 1 and 2 with equivalency factors as follow: type1 truck 1000/day(2. way) type2truck 500/day (2 way) 24kips(single) 24Kips(Tandem) 12kips(single) Equiv. 3.22 0.450 0.010 factor 24kips(single) 3.22 12 kips(Tandem) 0.026 Performance penod-15 years, annual growth rate=4%, tirectional distribution percent -70%, design lane percent 80 %, required structural number for subgrade = 5.7, asphalt concrete surfacing layer coefficient (4,-0.42), asphalt concrete base layer coefficient (a₂-034), gravel and soil subbase layer coefficient (93-0.12) and the modify drainage coefficient (m = 1.0) for all pavement courses Find the equivalent single axle load (ESAL) and draw a simple sketch of designed three pavement thickness courses with all necessary calculations?arrow_forward
- The average daily traffic on a stretch of road is 300 commercial vehicles per lane per day. Design traffic repetitions for 10 years when vehicle damage factor is 2.5 and traffic growth rate is 7% isarrow_forwardThe relationship between flow and density on a four-lane highway (two lanes per direction) is known to follow GreenShiled's model, with a free flow speed of 100 km/h and a jam density of 80 veh/km/lane. One of the two lanes of the EB direction will be closed for an entire month for maintenance. The traffic demand for the highway on a typical weekday is shown in the table below. a) What is the maximum length of the queue upstream of the bottleneck during both the morning and afternoon peak hours? b) At what time will the morning and afternoon queues be dissipated? c) Draw the shock wave diagram (for the entire day) showing shock wave speeds, critical times, and distances. Time 7:00 AM - 9:00 AM 9:00 AM 3:00 PM 3:00 PM 7:00 PM 7:00 PM–11:00 PM 11:00 PM 7:00 AM Average Demand (vph) 3000 1500 3200 1200 400arrow_forwardA four-lane rural freeway segment has a 510 m grade length of 2% upgrade followed by a 630 m grade length of 3%. The freeway has 3.4-m lane, 1.5m left-shoulder lateral clearances and interchanges spaced at every 25 km. During the peak hour, there are 6% trucks, 2% buses, 2% recreational vehicles and the rest are passenger cars. Driver population adjustment is determined to be 0.90, peak hour factor is 0.90 and the BFFS is 110 km/h. At present, the freeway operates at capacity during the peak hour in the direction in question. If an additional 3.4 m lane is introduced, and all other factors stay the same, what will be the new level of service?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning