Spencer's Sports manufactures outdoor equipment at three regional plants. The Freeway Plant produces two models of fishing reels, the Stream and the Surf. The Surf model is heavier and more durable.
Activity | Cost Driver | Cost | Cost Driver Volume | |
---|---|---|---|---|
Stream | Surf | |||
Setting up | Number of setups | $ 162,000 | 15 | 135 |
Inspecting | Number of inspections | 121,500 | 36 | 45 |
Packing and shipping | Number of packages shipped | 76,500 | 50 | 200 |
Total overhead | $ 360,000 |
The controller also collected the following information on production volume and direct costs for each product:
Stream | Surf | Total | |
---|---|---|---|
Units produced | 18,000 | 4,500 | 22,500 |
Direct materials cost | $ 450,000 | $ 337,500 | $ 787,500 |
Direct labor cost | 180,000 | 270,000 | 450,000 |
Total direct cost | $ 630,000 | $ 607,500 | $ 1,237,500 |
Required:
-
Compute the unit cost of each model under the current system.
-
Compute the unit cost of each model under the ABC system suggested by the controller's classification of overhead costs.
Step by stepSolved in 2 steps
- Brees, Inc., a manufacturer of golf carts, has just received an offer from a supplier to provide 2,600 units of a component used in its main product. The component is a track assembly that is currently produced internally. The supplier has offered to sell the track assembly for 66 per unit. Brees is currently using a traditional, unit-based costing system that assigns overhead to jobs on the basis of direct labor hours. The estimated traditional full cost of producing the track assembly is as follows: Prior to making a decision, the companys CEO commissioned a special study to see whether there would be any decrease in the fixed overhead costs. The results of the study revealed the following: 3 setups1,160 each (The setups would be avoided, and total spending could be reduced by 1,160 per setup.) One half-time inspector is needed. The company already uses part-time inspectors hired through a temporary employment agency. The yearly cost of the part-time inspectors for the track assembly operation is 12,300 and could be totally avoided if the part were purchased. Engineering work: 470 hours, 45/hour. (Although the work decreases by 470 hours, the engineer assigned to the track assembly line also spends time on other products, and there would be no reduction in his salary.) 75 fewer material moves at 30 per move. Required: 1. Ignore the special study, and determine whether the track assembly should be produced internally or purchased from the supplier. 2. Now, using the special study data, repeat the analysis. 3. Discuss the qualitative factors that would affect the decision, including strategic implications. 4. After reviewing the special study, the controller made the following remark: This study ignores the additional activity demands that purchasing would cause. For example, although the demand for inspecting the part on the production floor decreases, we may need to inspect the incoming parts in the receiving area. Will we actually save any inspection costs? Is the controller right?arrow_forwardVargas, Inc., produces industrial machinery. Vargas has a machining department and a group of direct laborers called machinists. Each machinist is paid 25,000 and can machine up to 500 units per year. Vargas also hires supervisors to develop machine specification plans and to oversee production within the machining department. Given the planning and supervisory work, a supervisor can oversee three machinists, at most. Vargass accounting and production history reveal the following relationships between units produced and the costs of direct labor and supervision (measured on an annual basis): Required: 1. Prepare two graphs: one that illustrates the relationship between direct labor cost and units produced, and one that illustrates the relationship between the cost of supervision and units produced. Let cost be the vertical axis and units produced the horizontal axis. 2. How would you classify each cost? Why? 3. Suppose that the normal range of activity is between 2,400 and 2,450 units and that the exact number of machinists is currently hired to support this level of activity. Further suppose that production for the next year is expected to increase by an additional 400 units. How much will the cost of direct labor increase (and how will this increase be realized)? Cost of supervision?arrow_forwardLauder Company manufactures and distributes various fixtures used primarily in new building construction. At the company's Bayside plant, Lauder produces two models of one widely used fixture designated by model names LC-20 and LC-50. Currently, the Bayside plant uses direct labor-hours to allocate manufacturing overhead costs to products. The vice president-manufacturing (VP-M) at Lauder has recently been considering updates to the company's costing systems as a way to ensure that managers had the best information available for decision making. However, rather than update throughout the entire firm, the VP-M and CFO agreed to test an ABC system. Because of its size and focus, the Bayside plant was selected for the experiment. An ABC study team, consisting of both plant and corporate employees was formed to propose an ABC system and compare the product costs with those reported by the current system. Based on the experiment, the executives at Lauder will decide whether to roll out the…arrow_forward
- Lauder Company manufactures and distributes various fixtures used primarily in new building construction. At the company's Bayside plant, Lauder produces two models of one widely used fixture designated by model names LC-20 and LC-50. Currently, the Bayside plant uses direct labor-hours to allocate manufacturing overhead costs to products. The vice president—manufacturing (VP-M) at Lauder has recently been considering updates to the company's costing systems as a way to ensure that managers had the best information available for decision making. However, rather than update throughout the entire firm, the VP—M and CFO agreed to test an ABC system. Because of its size and focus, the Bayside plant was selected for the experiment. An ABC study team, consisting of both plant and corporate employees was formed to propose an ABC system and compare the product costs with those reported by the current system. Based on the experiment, the executives at Lauder will decide whether to roll out the…arrow_forwardBonita, Inc. produces two types of gas grills: a family model and a deluxe model. Bonita's controller has decided to use a plantwide overhead rate based on direct labor costs. The president of the company recently heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining and machine setup. Presented below is information related to the company's operations: Direct labor costs Machine hours Setup hours (a) Family Model $76,800 2,000 200 Total estimated overhead costs are $460,800. Overhead cost allocated to the machining activity cost pool is $276,480 and $184,320 is allocated to the machine setup activity cost pool. Overhead rate Deluxe Model $153,600 2,000 800 Compute the overhead rate using the traditional (plantwide) approach. (Round answer to 2 decimal places, e.g. 15.25.) $arrow_forwardCrane Inc. makes two types of handbags: standard and custom. The controller has decided to use a plant-wide overhead rate based on direct labour costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining (machine hours) and machine set-up (number of set-ups). The total estimated machine hours is 1,500, and the total estimated number of setups is 500. Presented below is information related to the company's operations. Direct labour costs Machine hours Set-up hours Standard (a) $50,000 500 100 Custom $100,000 Predetermined overhead rate 1,000 Total estimated overhead costs are $187,500. The overhead cost allocated to the machining activity cost pool is $151,500, and $36,000 is allocated to the machine set-up activity cost pool. 400 Calculate the overhead rate using the traditional (plant-wide) approach. % of direct labour costarrow_forward
- Cullumber Inc. makes two types of handbags: standard and custom. The controller has decided to use a plant-wide overhead rate based on direct labour costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining (machine hours) and machine set-up (number of set-ups). The total estimated machine hours is 1,500, and the total estimated number of setups is 500. Presented below is information related to the company's operations. Direct labour costs Machine hours Set-up hours Standard (a) $50,000 500 100 Custom $100,000 Predetermined overhead rate 1,000 Total estimated overhead costs are $360,000. The overhead cost allocated to the machining activity cost pool is $187,500, and $172,500 is allocated to the machine set-up activity cost pool. 400 Calculate the overhead rate using the traditional (plant-wide) approach. % of direct labour cost 41 SUFarrow_forwardOgwood Company’s Johnstown Division is a small manufacturer of wooden household items. Al Rivkin, division controller, plans to implement a standard-costing system. Rivkin has collected informa-tion from several co-workers that will assist him in developing standards. One of the Johnstown Divi-sion’s products is a wooden cutting board. Each cutting board requires 1.25 board feet of lumber and 12 minutes of direct-labor time to prepare and cut the lumber. The cutting boards are inspected after they are cut. Because the cutting boards are made of a natural material that has imperfections, one board is normally rejected for each five that are accepted. Four rubber foot pads are attached to each good cutting board. A total of 15 minutes of direct-labor time is required to attach all four foot pads and finish each cutting board. The lumber for the cutting boards cost $3.00 per board foot, and each foot pad costs $.05. Direct labor is paid at the rate of $8.00 per hour.Required: 1. Develop…arrow_forwardVishnuarrow_forward
- Goulburn, Incorporated produces parts for heavy equipment used in mining and construction. The plant that produces one part common to many vehicles is highly automated, so all labor is considered part of factory overhead. The plant manager, who has just been promoted, would like to understand how overhead costs fluctuate in order to improve planning and budgets. After discussions with both financial and operations members of the plant staff, there is general agreement that the best cost driver for overhead is machine-hours. Monthly data were collected from the most recent two years on machine-hours and overhead. More months of data were available, but a process change had taken place about 30 months earlier, so the staff believed any data from before that time would be misleading. The data are shown in the following table: Month 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Machine-Hours 40,300 38,300 31,100 43,400 51,600 46,500 43,400 63,100 37,300 54,700 53,700 37,300 60,900 59,900…arrow_forwardGoulburn, Incorporated produces parts for heavy equipment used in mining and construction. The plant that produces one part common to many vehicles is highly automated, so all labor is considered part of factory overhead. The plant manager, who has just been promoted, would like to understand how overhead costs fluctuate in order to improve planning and budgets. After discussions with both financial and operations members of the plant staff, there is general agreement that the best cost driver for overhead is machine-hours. Monthly data were collected from the most recent two years on machine-hours and overhead. More months of data were available, but a process change had taken place about 30 months earlier, so the staff believed any data from before that time would be misleading. The data are shown in the following table: Month Machine-Hours Factory Overhead 1 39,300 $ 527,100 2 37,300 416,500 3 30,100 365,800 4 42,400 498,200 5 50,600 590,700 6 45,500 503,400 7…arrow_forwardWarren Furniture produces three models of desk chairs: Basic, Ergo, and Exec. The cost system at the Warren production facility allocates overhead cost on the basis of direct labor hours. The company is considering updating its cost system to an activity-based costing system and is interested in understanding the effects. A study team composed of the production facility's finance and operations groups has identified three overhead cost pools along with appropriate cost drivers for each pool. Cost Pools Assembly Setup Quality assurance Costs $ 2,925,000 1,023,000 642,000 Activity Drivers Direct labor-hours Number of setups Number of tests The plans for production for the next year and the budgeted direct costs and activity by product line are as follows: Direct costs (material and labor) Basic $ 1,006,800 Direct labor-hours 25,200 Products Ergo $ 1,143,000 12,000 Exec $ 868,800 Machine-hours 29,200 17,200 Number of setups Number of tests Number of units produced 48 140 7,200 72 100…arrow_forward
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning