Question
An equal tangent vertical curve is intended to connect grades of 3.5% and -2.9%. If this curve is to be a part of a highway designed with a PSD of 500ft, determine the minimum length (ft) of the vertical curve. Use exact solution (do not use the table).
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by stepSolved in 2 steps
Follow-up Questions
Read through expert solutions to related follow-up questions below.
Follow-up Question
I don't understand, can you provide more detailed steps, thank you
Solution
by Bartleby Expert
Follow-up Questions
Read through expert solutions to related follow-up questions below.
Follow-up Question
I don't understand, can you provide more detailed steps, thank you
Solution
by Bartleby Expert
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Two sections of a highway are separated by 800m. The initial grade is +3.0% and the final grade is -1.0% and the elevation is 12m. Determine the curve lengths required for a 120km/hr vertical alignment to connect two highway segments, keeping the connecting grade as small as possible.arrow_forwardplease be sure answer is correct.arrow_forwardConsider the same vertical curve from Problem 1 that has a +3.2% initial grade and -1.1% final grade. The point of vertical intersection is at station 98+20. The highest point of the curve is at station 100+79.35 to meet drainage design. What is the station of the point of vertical curvature (Also known as beginning of vertical curve). 92+88.95 92+90.81 92+88.05 (INCORRECT) 92+91.23 This is Question 1: Consider a vertical curve with a +3/2% initial grade and -1.1% final grade. The point of vertical intersection is at station 98+20. The highest point of the curve is at station 100+79.35 to meet drainage design. What is the design speed, in mph? Correct answer here is 70 MPHarrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning