Gordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are: A C D 8. 8 7 8 11 D Workpieces moved per week between work areas are: A B C D А 1,000 900 400 400 200 800 D It costs Gordon $1 to move 1 work piece 1 foot. The weekly total material handling cost of the layout = S 28,600 (enter your response as a whole number). A II II ABCD
Q: why is capacity planning important ? what are the goals of facility layout?
A: Capacity planning plans the personnel & equipment your small business will need in rank to…
Q: ufacturing unit wit
A: Lines and structures, as well as other key factors like department borders, are all part of the…
Q: Management has decided to cut down 3 seconds from each operation (operation 1 - 8) to improve…
A:
Q: Trinity Valley Furniture Warehouse has purchased a retail outlet with six departments, as shown…
A: Given data is, Department size - 30ft height and length The present layout and load customer for one…
Q: Gator Offi ce Systems is comparing two layouts for thedesign of its offi ce building. It has…
A: It is given that the company is comparing two layouts for its office building. The better layout has…
Q: If you want to setup the COVID center at your state capital city which factors you will consider and…
A: The establishment of the covid-19 set is a business start-up that is in high demand at this…
Q: snip
A: A process layout depends on the nature of the process through which the product should move in the…
Q: An industrial food processor needs to design a product layout for a new line of frozen pizza. The…
A: Layout network drawn using Decision rule of LPT
Q: The yearly total material handling cost of the current layout presented in PLAN A = $ (enter your…
A: THE ANSWER IS AS BELOW:
Q: Stove 0 Figure 2. Kitchen Layout #1 Refrigerator Counter (1) (2) 4' 7 The first kitchen layout is…
A: From above given question
Q: Warehouse layout has the following objective. Balance low-cost storage with low-cost material…
A: Warehouse layout: Designing a warehouse layout is a very crucial task, as the efficiency of any…
Q: Explain the variables that can be manipulated by a manager in layout strategy
A: To be determined: the variables that can be manipulated by a manager in layout strategy
Q: Explain the importance of Process Selection in Facility Layout
A: Note: As per the Bartelby guidelines only the first question has been answered. Process selection…
Q: An average of 50 customers travel between Departments A and B each day. Unfortunately, both…
A: The answer is option (b)
Q: What is the cycle time necessary to achieve the desired rate of production? (b) Using the longest…
A: The cycle time can be determined as:- Putting the values:- Hence the cycle time is 12 minutes.
Q: From the following table calculate and identify the Total distance travelled for per month for…
A: Load distance method is a mathematical model used to evaluate the locations based on weighted…
Q: Given in the following table are the tasks necessary forfinal assembly of a hospital bed, the length…
A:
Q: Hren Electronics is in process of setting a new office building. The following tables show the…
A: THe layout which leads to travelling of less distance is selected. Way 1:
Q: Three departments-milling (M), drilling (D), and sawing (S)-are assigned to three work areas in…
A: As an operational technique, location planning strives to increase productivity and safety by…
Q: Analyse the 3 advantages and 3 disadvantages of using process layout in a manufacturing plant.
A: In a manufacturing plant when the machines and different equipment that have similar processes and…
Q: A manager wants to assign tasks to workstations as efficiently as possible, and achieve an hourly…
A: Given information The shop works for 60 minutes /hour Hourly output = 3312
Q: Given in the following table are the tasks necessary for final assembly of a hospital bed, the…
A: The critical path is shown by double arrow that is BFHUK Also the project completion time is 27 min
Q: Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the…
A: Given information Task Time Immediate Predecessors A 12 B 15 A C 8 A D 5 B, C E 20…
Q: 2. Given in the following table are the tasks necessary for final assembly of a hospital bed, the…
A: As requested giving you word written answer. Attaching it below-
Q: In manufacturing layout design, the key concern is the resulting efi ciency of the operation. In…
A: Layout design is defined as the planning of different department physically in a facility. It…
Q: Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to…
A: Material handling involves short-distance movement within the shop floor or from shop floor to the…
Q: Use the longest work element rule to balance the assembly line described in the following table and…
A: a) The cycle time can be calculated as follows: Cycle time = Production time per hourOutput per hour…
Q: Three departments-milling (M), drilling (D), and sawing (S)-are assigned to three work areas in…
A: Find the Given details below: Given details: Pieces moved per day M D S M - 22 34 D - -…
Q: An assembly line is to be designed for a product whose completion requires 21 minutes of work. T he…
A: Assembly line: Assembly line refers to a process that follows a fixed sequence of steps in order to…
Q: The maker of the world-famous Chocolate Chip Cookies needs to design a product layout for a new…
A: Total Production time per day=8 hour or 480 minutes Total demand per day=1440 cases
Q: The TLB Yogurt Company must be able to make 600 partycakes in a 40-hour week. Use the following…
A: Assembly line balancing helps in allocating a rate of production to a particular product with a…
Q: The following layout is suitable for Make-to-Order product. O a. Functional Layout O b. Cellulor…
A: The correct option is option d. Product layout.
Q: Explain the importance of layout planning for everyday life.How has poor layout planning affected…
A: The best spatial arrangement of all services that occupy space inside a facility is determined…
Q: Process Layout Determine the placement of departments for a newly designed layout facility that…
A: Placement of Department orchestrates and facilitates different projects that target forming the…
Q: Design a layout on a 2 x 3 grid that satisfies the prefer- ences listed here. Department A…
A: given,
Q: In what respects is facility layout a marketing problem in services? Give an example of a service…
A: For a service-oriented firm, the facility needs to be in proximity with the customer and also the…
Q: Gordon Miller's job shop has four work areas, A B, C, and D. Distances in foet between centors of…
A: Given data Distance between the work area is as follows. AB = 5 AC = 9 AD = 8 BC = 7 BD = 7 CD = 9
Q: Q2) (a) A Missouri job shop has four departments-machining (M), dipping in a chemical bath (D),…
A: From the given data: *0.50 to move 1 piece 100; 0f work pieces hence * 100 M D F P M - 600…
Q: Describe a flexible manufacturing system. How does itdiffer from a cellular layout?
A: A more completely automated version of cellular fabrication is a versatile production method. In…
Q: lease solve D only (a) What is the cycle time necessary to achieve the desired rate of production?…
A: Demand =30,000 units per year
Q: (D), nising () the movement of material. The number of workpieces moved yearly between work areas…
A: Total material handling cost = Sum of (Distance between work areas × No. of workpieces moved)…
Q: Compute the cost of the current layout. Assume that distance is computed from the center of each…
A: ANSWER : a) Cost to move 1 work piece for 1 metre is Saudi Riyal 1. Total distance among WC1, WC2,…
Q: Line balancing As the Operations Manager of Shane Manufacturing Ltd., you are given the task to…
A: To consider a problem of line balancing . Task Immediate predecessor Task time A - 12 B A 6…
Q: The Southeastern Sports Company produces golf clubs on an assembly line in its plant in Marietta,…
A: A network diagram helps in understanding the critical path, shortest path of activities and shows…
Q: 1. Cathy is launching a new model of their cars, It is known as the Cathy model X. Their production…
A: Facility layout is an array of distinct factors of manufacturing in an applicable manner to reach…
Q: Consider the relationship chart for the a fast-food restaurant, Assume that the areas required for…
A: Code Closeness rating A Absolutely necessary E Especially important I Important O Ordinary…
Q: Given the building layout for Store A, Store B, Store C, and Store D, what portion of the shared…
A: Apportioned cost is the method of distributing the different cost on the basis of proportion. It is…
Q: Three departments-milling (M), drilling (D), and sawing (S)-are assigned to three work areas in…
A: Given that: Distance(foot)×: M-D =22 M-S =34 D-S =18 Pieces Moved: M-D =9 M-S =6 D-S =9 Cost to move…
Q: Explain the advantages of hybrid layouts.
A: the advantages of Hybrid Layouts are :
Can you assist me with this question 12 by showing me the process step by step so, I can use this to compare with my notes. I attempted this question numerous times however, Im still having trouble understanding. Thank you.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- MGT-314 (Operation management) MCQ: 1. Mamar daan halim is one of the best halim in Bangladesh. They have a food stand in Banasree. Mama the owner makes a bowl every morning. Brings that to the spot and sells it to his customers. What kind of facility layout is this? a) Mass Processing b) Batch Processing c) Continuous processing d) Job Shop 02. Dunder Mifflin is looking to sell its products on the international market, what quality mark will help it improve its image? a) ISO 21000 b)ISO 9000 c) BSTI 1500 d)ISO 14000Gordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are: Workpieces moved per week between work areas are: A C ABCD A A It costs Gordon $1 to move 1 work piece 1 foot. The weekly total material handling cost of the layout= $ (enter your response as a whole number). B T B 900 C 8 7 C 800 400 D 6 11 D 500 400 700 DGordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are: Workpieces moved per week between work areas are: It costs Gordon $1 to move 1 work piece 1 foot. The weekly total material handling cost of the layout = $ ABCD A B C D A A (enter your response as a whole number). B 5 B 800 C 10 7 с 800 500 D 8 9 11 D 400 200 700
- Gordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are: A B CD с Workpieces moved per week between work areas are: A B C A D A |||| - It costs Gordon $2 to move 1 work piece 1 foot. The weekly total material handling cost of the layout = $ B 4 B 900 C 8 7 C 800 300 D 6 7 10 D 400 400 700 (enter your response as a whole number). ncorTrinity Valley Furniture Warehouse has purchased a retail outlet with six departments, as shown below. The anticipated number of customers that move between departments each week is given in the load summary chart. Each department is 30 ft x 30 ft. Present Layout A В C D E F Proposed Layout Distance, feet Present Layout Load Distance, feet From/To А — В А - F В -Е С - В D - C E - A Е -F F - B # Customers Load * Distance Load * Distance 70 50 100 70 80 40 30 60 F- E 100 Total a) Determine the total distance travelled by customers through the retail outlet on a weekly basis according to the present layout. b) Re-arrange the six departments such that the weekly total customer movement (distance) is minimized. c) Evaluate each of your proposed layouts. d) Even if you might be analyzing several possible layouts, choose only one of them based on their evaluations; i.e., which of them has the minimum Load * Distance. Draw a diagram of your proposed layout. Present the results of your…Gordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are: A B C D A Workpieces moved per week between work areas are: A B C D A It costs Gordon $1 to move 1 work piece 1 foot. The weekly total material handling cost of the layout = $ B 5 B 1,000 C5 II с 9 C 900 400 D 6 7 10 D 400 300 700 (enter your response as a whole number).
- please solve D only (a) What is the cycle time necessary to achieve the desired rate of production? =12min(b) Using the longest element rule, create workstations to balance the line,attempting to get as close as possible to the theoretical minimum numberof workstations.(c) What is the efficiency and idle time of the line balance? =72.22%(d) The company considers that if the lamps are successful with the publicit may need to increase production to 30,000 units. The company thinksthe simplest solution is to obtain two more production lines, thus havingtriple capacity. Another option is to re-balance the line. Considering thata single worker is assigned to a work station, determine which option(more production lines or re-balancing) yields the smallest labour size.Manufacturing Company uses FIFO method of accumulating costs in a two-department process. Materials are introduced at the inception of the process except for a special material which is added in department 2 at 60% completion as to overhead. Inspection is done at the end of the process in both departments. Production data for Department 2 are given below: In process, beginning, (80% labor, 70% overhead)2,000 Transferred in 14,900 In process, ending (40% labor, 20% overhead) 3,000 Normal spoilage 200 Abnormal spoilage (found at 30% completion as to laborand 15% as to overhead due to internal failure) 400 Cost data for the month:In process beginning:Transferred in 15,020 Special materials 1,900 Direct labor 4,388 Overhead 11,044 Current costs:Transferred in 137,080 Special materials 14,030 Direct labor 46,000 Overhead 113,564 The cost of units transferred to finished goods is?The cost of spoilage charged to revenue is?Given in the following table are the tasks necessary for final assembly of a hospital bed, the length of time needed to perform each task, and the operations that must be completed prior to subsequent operations. Construct a precedence diagram and balance the assembly line for a desired cycle time of 14 minutes. Draw a schematic diagram of the balanced line. How many beds can actually be assembled in an eight-hour period? Element Precedence Time (min) A None 4 B None 5 C None 8 D A 4 E A, B 3 F B 3 G D, E 5 H F 7 I G, H 1 J I 7 K C, J 4
- The three-station work cell at Puman Mng. Inc s ustrated in the figure below Rhas ho machines at staton 1in paralel the product needs to go through only one of the two machines before proceeding to station 2) 30 minunit Stadon 1 Machine A Staton 2 Staton 3 Staton Machine e 10 mnunit 3 minunt 30 munt The throughout tine isminutes enter your respone asahoie umber D The botteneck ime of this work cel is minutes per unt enter your response asnole umber) is the bottieneck station d) f the firm operates 11 hours per day 6 days per week the weey capacity of this work cel is unts (enter your maponse asa whole numbedA DIY product manufacturing company wishes to create a ‘product’ focused layout for the manufacture of their new cordless drill. There order book requires them to produce 480 drills per eight hour day. The assembly operations for the drill and the associated information are given in the table below. Therefore the key tasks are to: Management has decided to cut down 3 seconds from each operation (operation 1 - 8) to improve overall effectiveness. (a) calculate the maximum cycle time (b) calculate the minimum number of work stations (c) produce the precedence diagram (d) produce the line design which achieves the required cycle time (e) calculate balancing lossThe Pullman Mfg., Inc., three-station work cell illus-trated in Figure S7.8 has two machines at station 1 in parallel. (The product needs to go through only one of the two machinesbefore proceeding to station 2.) The manager, Ms. Hartley, hasasked you to evaluate the system if she adds a parallel machine atstation 2.a) What is the throughput time of the new work cell?b) What is the bottleneck time of the new work cell?c) If the firm operates 8 hours per day, 6 days per week, what isthe weekly capacity of this work cell?d) How did the addition of the second machine at workstation 2affect the performance of the work cell