(d) Design an underground rectangular tunnel drift, in a massive granitic rock with a UCS over 100 MPa, of width: 3.1 m, height: 4.1 m, and length 10 m, using an initial Burn-Cut method to create an extra surface for the next underground Bench-Blasting operation, where the idea is roughly illustrated in Figure A3-Q2. : VIII VII VIII VIII IV . IV VII IV IV Development leading Salad care andy VII Brech Blast hader 2 VII . VIII VII VII VII VIII Firing sequence for tunnel numerical order 1 Dorsegment healing Seldcre body Burn cut (after ICI) Arabic numerals: short delay periods Roasan nunerals: half-second periods xy-section view Derech Eros Batt holes Bench blasting methods (yz section view) Figure A3-Q2. Idea of new free surface creation in underground drifts and tunnels

Principles of Heat Transfer (Activate Learning with these NEW titles from Engineering!)
8th Edition
ISBN:9781305387102
Author:Kreith, Frank; Manglik, Raj M.
Publisher:Kreith, Frank; Manglik, Raj M.
Chapter6: Forced Convection Over Exterior Surfaces
Section: Chapter Questions
Problem 6.12P
icon
Related questions
Question
(d-i) Sketch/draw, with correct scales, your tunnel excavation problem showing all the xy, yz and xz section views together with your staged drilled blast holes. (d-ii) Design your burn-cut and show your design schematically with all the firing charge and detonation time delay details.
(d) Design an underground rectangular tunnel drift, in a massive granitic rock with a UCS
over 100 MPa, of width: 3.1 m, height: 4.1 m, and length 10 m, using an initial Burn-Cut
method to create an extra surface for the next underground Bench-Blasting operation,
where the idea is roughly illustrated in Figure A3-Q2.
:
VIII
VII
VIII
VIII
IV
.
IV
VII
IV
IV
Development leading
Salad care andy
VII
Brech
Blast hader
2
VII
.
VIII
VII
VII
VII
VIII
Firing sequence for tunnel numerical order
1
Dorsegment healing
Seldcre body
Burn cut (after ICI)
Arabic numerals: short delay periods
Roasan nunerals: half-second periods
xy-section view
Derech
Eros
Batt holes
Bench blasting methods (yz section view)
Figure A3-Q2. Idea of new free surface creation in underground drifts and tunnels
Transcribed Image Text:(d) Design an underground rectangular tunnel drift, in a massive granitic rock with a UCS over 100 MPa, of width: 3.1 m, height: 4.1 m, and length 10 m, using an initial Burn-Cut method to create an extra surface for the next underground Bench-Blasting operation, where the idea is roughly illustrated in Figure A3-Q2. : VIII VII VIII VIII IV . IV VII IV IV Development leading Salad care andy VII Brech Blast hader 2 VII . VIII VII VII VII VIII Firing sequence for tunnel numerical order 1 Dorsegment healing Seldcre body Burn cut (after ICI) Arabic numerals: short delay periods Roasan nunerals: half-second periods xy-section view Derech Eros Batt holes Bench blasting methods (yz section view) Figure A3-Q2. Idea of new free surface creation in underground drifts and tunnels
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Heat Transfer (Activate Learning wi…
Principles of Heat Transfer (Activate Learning wi…
Mechanical Engineering
ISBN:
9781305387102
Author:
Kreith, Frank; Manglik, Raj M.
Publisher:
Cengage Learning