A 3 meter thick fill was placed over a 9 meter thick compressible clay. Underlying the clay layer is a very hard impermeable clay. The groundwater table is located on top of the compressible clay. A circular tank 9 meters in diameter transfers a surface contact stress of 45 kPa.  Assume for this problem that the settlement of the fill and the very hard clay is small compared to the settlement of the compressible clay.  a) Calculate the initial void ratio and saturated density of the compressible clay. b) Divide the compressible layer into two sublayers of equal thickness.  The preconsolidation pressure is 100 kPa for the upper sublayer and 160 kPa for the lower sublayer.  Calculate the following at the center of each sublayer: the increase in vertical stress caused by the tank underneath its center, and the consolidation setttlement due to the combined effect of the tank and weight of fill. c) How long will it take for 0.18 meters of settlement to occur? d) After 3.6 years, what percent consolidation has occurred at the middle of the compressible clay?

Principles of Geotechnical Engineering (MindTap Course List)
9th Edition
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Braja M. Das, Khaled Sobhan
Chapter6: Soil Compaction
Section: Chapter Questions
Problem 6.15P
icon
Related questions
icon
Concept explainers
Question

A 3 meter thick fill was placed over a 9 meter thick compressible clay. Underlying the clay layer is a very hard impermeable clay. The groundwater table is located on top of the compressible clay. A circular tank 9 meters in diameter transfers a surface contact stress of 45 kPa.  Assume for this problem that the settlement of the fill and the very hard clay is small compared to the settlement of the compressible clay. 

a) Calculate the initial void ratio and saturated density of the compressible clay.

b) Divide the compressible layer into two sublayers of equal thickness.  The preconsolidation pressure is 100 kPa for the upper sublayer and 160 kPa for the lower sublayer.  Calculate the following at the center of each sublayer: the increase in vertical stress caused by the tank underneath its center, and the consolidation setttlement due to the combined effect of the tank and weight of fill.

c) How long will it take for 0.18 meters of settlement to occur?

d) After 3.6 years, what percent consolidation has occurred at the middle of the compressible clay?

Fill
Compressible clay
Tank
p= 2.20 Mg/m³
Pa = 1.60 Mg/m³
Pd
Ps= 2.65 Mg/m³
Ce = 0.8
Cr= 0.04
cv = 4.5 m² /yr
Very hard clay
Groundwater
table
Transcribed Image Text:Fill Compressible clay Tank p= 2.20 Mg/m³ Pa = 1.60 Mg/m³ Pd Ps= 2.65 Mg/m³ Ce = 0.8 Cr= 0.04 cv = 4.5 m² /yr Very hard clay Groundwater table
Expert Solution
steps

Step by step

Solved in 6 steps with 7 images

Blurred answer
Knowledge Booster
Pressure and stress
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781305081550
Author:
Braja M. Das
Publisher:
Cengage Learning