A 100 HP. 400 V. 3-PHASE, 0.8 P.F. LAGGING LOAD CENTRE IS TO BE CONNECTED TO A 125 KVA. II KV/400 VOLT POLE MOUNTED SUB-STATION SITUATED 100 METER APART BY U/C 3(1/2) CORE II KV GRADE CABLE. FIND (1) DRAW LAYOUT OF U/G DISTRIBUTION LINE. (2) LINE CURRENT (3) LENGTH OF CABLE.

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter4: Transmission Line Parameters
Section: Chapter Questions
Problem 4.3MCQ: Alumoweld is an aluminum-clad steel conductor. True False
icon
Related questions
icon
Concept explainers
Question
A 100 HP. 400 V. 3-PHASE, 0.8 P.F.
LAGGING LOAD CENTRE IS TO BE
CONNECTED TO A
125 KVA. II KV/400 VOLT POLE
MOUNTED SUB-STATION SITUATED
100 METER APART BY
U/C 3(1/2) CORE II KV GRADE CABLE.
FIND (1) DRAW LAYOUT OF U/G
DISTRIBUTION LINE.
(2) LINE CURRENT
(3) LENGTH OF CABLE.
Transcribed Image Text:A 100 HP. 400 V. 3-PHASE, 0.8 P.F. LAGGING LOAD CENTRE IS TO BE CONNECTED TO A 125 KVA. II KV/400 VOLT POLE MOUNTED SUB-STATION SITUATED 100 METER APART BY U/C 3(1/2) CORE II KV GRADE CABLE. FIND (1) DRAW LAYOUT OF U/G DISTRIBUTION LINE. (2) LINE CURRENT (3) LENGTH OF CABLE.
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Transmission line parameter
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning