Toolings. (Dies, punches ,etc. for multi station) in Solid Works & AutoCAD ➢ Prepare PPAP Document- PFC, PFMEA, CP & Checking Aids as per customer requirements. ➢ Interaction with Customers (MSIL, HMSI, TVS & VW) for feedback of NPD. ➢ Technical support to marketing and operations. ➢ Creation of Master Data in SAP for Design & Development. ➢ Preparation & Updating of APQP, PPAP Documents as per AS9100 & TS16949 Standards. ➢ To Attend Customer Complaints & Trial of
starting with a group drawing, front, back and side drawings and Photoshop final images. Once I had a clear image of my characters I then started to experiment within my model box for inspiration. Once I had a few ideas I then produced some rough sketches, resulting in a final drawing. I then produced my set on auto cad so I had a good idea of scale and measurements resulting in a final orthographic, side elevation and cutting list. After I had my measurements and rough drawings I then drew out the
followed by extrude to get the solid. Using the same methods, I created the track for the seats. With that, I helped the designer with the “tool” to check the seat model. Work Experience 4 Lastly, I was involved with drafting and editing of engineering drawings. This is needed and essential in almost all engineering sector to communicates ideas and all needed information from the engineer to the manufacturer. Another important item would be the Engineering orders (EO), which are used for changes in components
One only produces a plan drawing when one has resolved the elevations and layouts. A plan really needs to grow out of the functional and aesthetic requirements of a project. Yet ArchiCAD constrains one to work in plan from the start; from this the other views are created. This
We understand that this project requires a unique and innovative approach to Public Education and Outreach, not a “one size fits all” approach with cookie cutter and/or outdated techniques. The best management practices that we will provide in the Summary Document will not only focus on how to best meet the objectives and present the deliverables for this Task, but also outline how to keep the information fresh and relevant so that stakeholders and other interested parties will be engaged throughout
Case Study Capita Placement 2014/2015 Marc Garside M3K203084 Marc Garside 25 Thornhill Gardens Mearnskirk Glasgow G77 5FU Mr Gordon Henderson Glasgow Caledonian University Cowcaddens Road Glasgow G4 OBE Dear Gordon, Please find enclosed my case study for work placement between August 2014 and January 2015 at Capita. Thank you. Yours Faithfully, Marc Garside. Contents • Introduction • 1.0 Standard Buildings 82 Gordon Street/ 94 Hope Street
design brief for the timber tray is to design and manufacture a rectangular timber tray where it is used to carry plates and cutlery for example morning breakfast in bed or maybe to carry drinks or tea to a table. 2. Drawings: This may include freehand sketches and orthographic drawings. 3. Material List: This is an outline of the materials you used to manufacture your project. To able to complete the project of the timber tray materials were used to manufacture a perfect rectangular
S Compact-ability Compact-ability is the density of propositions given in a designated area. The density and proximity of people, activities, and built environments have always been defining characteristics of a city. Compact-ability is the culmination of the 4 previous idea. Take a fountain in a public square for instance (definability). A fountain will be an excellent resting place for people. Add extra benches and shelters around the fountain to accommodate even more people (comfortability)
includes site conditions, material used, interfaces with pre-existing structure/infrastructure. Basically, by using various of site or the whole building drawings, some significant building components can be recognized. These building components will be discussed and analyzed specifically, which include their particular location in the drawing and how they function in the building structure. Introduction of this building The building is located in Brisbane QLD; the area is about 18000.0 m2. The
Additionally, as an Engineering student who must be capable of drawing I was afraid of not being able to draw structures, either by hand or by using the AutoCAD program. However, I’m now confident in my drawing skills due to this class. In fact, I’m not only glad that I can perform drawings now, but also I’m enjoying the time I spend in doing these drawings. Engineering drawings have also taught me how to imagine the structure of any object I see. Furthermore, I find the