1.

To determine

In the step-down method of cost allocation, the service department costs are to be allocated in a particular sequence wherein those costs incurred in the service department, which is first in the sequence, will be allocated among those service departments that used the services of that service department. Similarly, the service departments which are next in the sequence are treated the same way and thus, the allocation among the departments is performed in this manner under the step-down method.

Total costs after allocation by using the step-down method, and predetermined overhead rates in machining and assembly.

2.

To determine

The direct method of allocating cost is the method of allocating the service department costs to the departments’ parts of the business. In the direct method of cost allocation, the costs of the service department are allocated to the production department but these costs are not allocated to the rest of the service departments.

Total costs after allocation by using the direct method, and predetermined overhead rates in machining and assembly.

3.

To determine

Cost allocation is a process of assigning or allocating indirect cost to each and every unit using a predetermined overhead rate. The predetermined overhead rate is determined by dividing the estimated total cost by the estimated activity base.

Plantwide overhead rate

4.

To determine

Cost allocation is a process of assigning or allocating indirect costs to each and every unit using a predetermined overhead rate. The predetermined overhead rate is determined by dividing the estimated total cost by the estimated activity base.

  • The total overhead allocated by using the step-down method,
  • The total overhead allocated by using the direct method,
  • The total overhead allocated by using the plantwide rate.

Blurred answer
Students have asked these similar questions
Activity-Based Department Rate Product Costing and Product Cost Distortions Big Sound Inc. manufactures two products: receivers and loudspeakers. The factory overhead incurred is as follows: Indirect labor $400,400 Subassembly Department 198,800 Final Assembly Department 114,800     Total $714,000   The activity base associated with the two production departments is direct labor hours. The indirect labor can be assigned to two different activities as follows: Activity   Budgeted Activity Cost   Activity Base Setup     $138,600     Number of setups                               Quality control     261,800     Number of inspections                        Total     $400,400         The activity-base usage quantities and units produced for the two products follow:     Number of Setups   Number of Inspections   Direct Labor Hours—Subassembly   Direct Labor Hours—Final Assembly   Units Produced Receivers     80       450       875       525       7,000…
EXERCISE 9. Duweynie Pottery, Inc., is divided into two operating divisions: Pottery and Retail. The company allocates Power and General Factory department costs to each operating division. Power costs are allocated on the basis of the number of machine hours and general factory costs on the basis of square footage. No effort is made to separate fixed and variable costs; however, only budgeted costs are allocated. Allocations for the coming year are based on the following data: Support Departments Рower P150,000 2,000 2,000 General Factory P160,000 1,000 1,700 Operating Divisions Pottery P98,000 6,900 4,000 Retail P56,000 3,100 6,000 Overhead costs Machine hours Square footage Round all allocation ratios to four significant digits and all allocated amounts to nearest peso. 1. Allocate the support service costs using the direct method. 2. Allocate the support service costs using the sequential method. The support departments are ranked in order of highest cost to lowest cost. 3.…
Activity-Based Department Rate Product Costing and Product Cost Distortions Big Sound Inc. manufactures two products: receivers and loudspeakers. The factory overhead incurred is as follows: Indirect labor $400,400 Subassembly Department 198,800 Final Assembly Department 114,800     Total $714,000   The activity base associated with the two production departments is direct labor hours. The indirect labor can be assigned to two different activities as follows: Activity   Budgeted Activity Cost   Activity Base Setup     $138,600     Number of setups                               Quality control     261,800     Number of inspections                        Total     $400,400         The activity-base usage quantities and units produced for the two products follow:     Number of Setups   Number of Inspections   Direct Labor Hours—Subassembly   Direct Labor Hours—Final Assembly   Units Produced Receivers     80       450       875       525       7,000…
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Managerial Accounting
Accounting
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:South-Western College Pub
Text book image
Managerial Accounting: The Cornerstone of Busines...
Accounting
ISBN:9781337115773
Author:Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger
Publisher:Cengage Learning
Text book image
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning