Interpretation: The information required to decide whether the management needs to rent a warehouse is to be determined. Also, the ways in which the linear programming model can be helpful is to be determined.
Concept Introduction:When there are more than two variables (behaving linearly) in a problem in which an objective function is to be optimized, the problem can be solved through linear programming. The solution will also indicate the critical and non-critical variables (called constraints). Thus the impact of any variation of the critical constraints can also be assessed.
Answer to Problem 1DQ
The inferenceof not taking another warehouse on rent (at whatever rate) can be derived from this model.
Explanation of Solution
Given information:
- Three equal to or less than constraints.
- The two critical constraints of raw material and labour costs.
- Availability of a warehouse at cheap rates.
- The management needs to know whether storage space is a binding constraint. It is not, because the intersection of labour hours and raw materials is the optimal solution.
Want to see more full solutions like this?
Chapter D Solutions
Operations Management: Processes And Supply Chains (12th Edition) (what's New In Operations Management)
- Suppose the following costs for a 10-hour round-trip flight apply to the time frame and expenses of an unscheduled 5-hour charter flight from Baltimore to Las Vegas (and return the next day) on a seven-year-old Boeing 737–800 with 120 occupied seats. Some costs listed in the table have been aggregated up to the flight level from a seat-level decision where they are incurred. Others have been allocated down to the flight level from an entry/exit or maintain-ownership company-level decision. Still other costs vary with the go/no go flight-level decision itself. Your job is to analyze each cost item and figure out the “behavior of cost”—that is, with which decision each cost varies. Fuel and landing fees =$5,200 Quarterly airframe maintenance re: FAA certificate = $1,000 Unscheduled engine maintenance per 10 flight hours =$1,200 Pro rata time depreciation for seventh year of airframe = $7,200 Flight pay for pilots per round-trip flight = $4,200 Long-term hangar facility lease = $6,600…arrow_forwardGeorgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 47 40 27 Hours required to complete all the cherry cabinets 64 51 36 Hours available 40 30 35 Cost per hour $34 $41 $52 For example, Cabinetmaker 1 estimates it will take 47 hours to complete all the oak cabinets and 64 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 40 hours available for the final…arrow_forwardc. If Cabinetmaker 1 has additional hours available, would the optimal solution change? If required, round your answers to three decimal places. If your answer is zero, enter "0". Explain. ✓ because Cabinetmaker 1 has dual value Yes ✓ of No -1.84 ✔ ✓ of Therefore, each additional hour of time for cabinetmaker 1 will reduce total cost by $ d. If Cabinetmaker 2 has additional hours available, would the optimal solution change? If required, round your answers to three decimal places. If your answer is zero, enter "0". Use a minus sign to indicate the negative figure. Explain. ✔ because Cabinetmaker 2 has a slack 1.84 ✔ per hour, up to a maximum of 30 X hours. Alternatively, the dual value is 50 ✓ hours. 0.00 ✓ which means that adding one hour to this constraint will decrease total cost by $ 0.00 ✓.arrow_forward
- Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 50 44 32 Hours required to complete all the cherry cabinets 61 46 34 Hours available 35 25 30 Cost per hour $36 $43 $56 For example, Cabinetmaker 1 estimates that it will take 50 hours to complete all the oak cabinets and 61 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 35 hours available for the final…arrow_forwardGeorgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 50 44 32 Hours required to complete all the cherry cabinets 61 46 34 Hours available 35 25 30 Cost per hour $36 $43 $56 For example, Cabinetmaker 1 estimates that it will take 50 hours to complete all the oak cabinets and 61 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 35 hours available for the final…arrow_forwardAlice, Wonder, and Land are freshmen under the marketing management program. Every month, they purchase a piece of Panda ballpen. The price of the ball pen is Php9.50.According to a recent survey, 45% of the marketing freshmen have the samepurchasing behavior as Alice, Wonder, and Land. Another 30% also purchase Panda ballpens regularly at the same price; however, they purchase once every 2 weeks. There are approximately 280 freshmen under the marketing management program. Assuming that the behavior is consistent throughout their 4-year stay in the program, what is the approximate projected revenue that can be generated from the marketing freshmen for the entire duration of their stay in the program?arrow_forward
- Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Hours required to complete all the oak cabinets Hours required to complete. all the cherry cabinets Hours available Cost per hour Min s.t. 01 Let O₁ O₂ 01 01 For example, Cabinetmaker 1 estimates it will take 50 hours to complete all the oak cabinets and 60 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 40 hours available for the final finishing operation. Thus, Cabinetmaker 1 can only complete 40/50 = 0.8, or 80%,…arrow_forwardA manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 How many supply nodes are present in this problem? Multiple Choice: 4 3 1 8 16arrow_forwardA manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 How many arcs will the network have?arrow_forward
- The Canadian government has built a large grain-shipping port at Churchill, Manitoba, on the Hudson Bay. Grain grown in southern Manitoba is carried by rail to Churchill during the open-water shipping season. Unfortunately the port is open only 50 days per year during July and August. This leads to some critical crew staffing decisions by management. The port has the capacity to load up to 7 ships simultaneously, provided that each loading bay has an assigned crew. The remote location and short shipping season results in a very high labor cost for each crew assigned, and management would like to minimize the number of crews. Ships arrive in a random pattern that can be modeled using the Poisson probability model. If a ship arrives and all available loading bays are filled, the ship will be delayed, resulting in a large cost that must be paid to the owner of the ship. This penalty was negotiated to encourage ship owners to send their ships to Churchill.Results of an initial analysis…arrow_forwardFormulate but do not solve the problem.The management of Hartman Rent-A-Car has allocated $2.25 million to buy a fleet of new automobiles consisting of compact, intermediate-size, and full-size cars. Compacts cost $18,000 each, intermediate-size cars cost $27,000 each, and full-size cars cost $36,000 each. If Hartman purchases twice as many compacts as intermediate-size cars and the total number of cars to be purchased is 100, determine how many cars of each type will be purchased. (Assume that the entire budget will be used. Let x, y, and z denote the number of compact, intermediate-sized, and full-size cars purchased, respectively.) = 2,250,000 = x = 100arrow_forwardA manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 Note: This question requires Solver.Formulate the problem in Solver and find the optimal solution. What is the optimal quantity to ship from Factory B to Customer 3? Multiple Choice 25 units 50 units 75 units 100 units 125 unitsarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,