Question
Chapter 9, Problem 9.12P
To determine
The revenue stream to finance the project.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Assume it costs 30 cents per ton per mile to operate a garbage truck and 10 cents per ton per mile to operate a transfer truck. A transfer station also has fixed cost of $20 per ton. If it is 40 miles to the landfill. What would be your least expensive transportation alternative?
A new chemical remediation tank is needed. Current technology tanks, which cost $150,000, must be drained and treated every 2 years at a cost of $30,000; the tanks will last 10 years, and each will have a salvage value of 5% of first cost. A tank with new technology has just come on the market. There are no periodic maintenance costs, and a tank will last 20 years. If the new tanks cost $325,000, what minimum salvage value, as a percentage of first cost, would be required for this technology to be a better option? Use a 12% interest rate. (a) 10% (b) 36% (c) 57% (d) 72%?
5) Assume each household produces 60 lb of refuse per week. How many customers can a
20-yd³ truck that compacts the refuse to 550 lb/yd³ collect before it has to make a trip to
the landfill?
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- 5.26 An industrial engineer is considering two robots for purchase by a fiber-optic manufacturing com- pany. Robot X will have a first cost of $80,000, an annual maintenance and operation (M&O) cost of S30,000, and a $40,000 salvage value. Robot Y will have a first cost of $97,000, an annual M&O cost of $27,000, and a $50,000 salvage value. Which should be selected on the basis of a future worth comparison at an interest rate of 15% per year? Use a 3-year study period.arrow_forwardCan I get a thorough step by step for the following question? A sanitary landfill has available space 25 ha at an average depth 12 m. Nine hundred sixty-five (965) cubic meters of solid waste are dumped at the site each day for 5 days per week. This waste is compacted to twice its delivered density. Draw a mass-balance diagram and estimate the expected life of the landfill in years.arrow_forward(b) Annual cash fl (c) Rate of return analysis -66 Two hazardous environment facilities are being evaluated, with the projected life of each facility being 10 years. The company uses a MARR of 15%. Using rate of return analysis, which alternative should be selected? Alt. A Alt. B $615,000 $300,000 10,000 158,000 First cost O&M cost 25,000 92,000 Annual benefits Salvage value 65,000 -5,000arrow_forward
- A landfill project requires 5000 m3 of compacted soil. The void index specified for the compacted landfill is 0.7. Three borrowing areas are available as indicated in Table 1, which relates the respective soil void rates and the cost per cubic meter of soil transport for the proposed construction site. Carry out the necessary calculations to select the borrowing area from which soil should be brought in to minimize costs. Assume Gs of 2.6 for all areas loan. Table 1 presents the data.arrow_forwardA truck unloads 20m³ of gravel at a landfill. You, who own the truck, plan to purchase an uncovered box in which to transport the gravel on multiple trips. Your cost is the cost of the box plus $2.00 per trip. The box must be half a meter high, but you can choose the length and width. The cost of the box will be $20.00 per square meter for the front and back; and $10.00 per square meter for the bottom and sides. What should be the dimensions of the box you should purchase to minimize your total costs?arrow_forwardA company plans to construct a wastewater treatment plant to treat and dispose of its wastewater. Construction of a wastewater treatment plant is expected to cost $2 million and an operating cost of $300,000/yr. Determine the NPV of the total cost (including the capital investment and total operating expenses) over the period of 30 years at an interest rate of 6.5% for treating the wastewaterarrow_forward
- A cooling-water pumping station at the LCRA plant costs $600,000 to construct, and it is projected to have a 25-year life with an estimated salvage value of 15% of the construction cost. However, the station will be book-depreciated to zero over a recovery period of 30 years. Calculate the annual depreciation charge for years 4, 10, and 25, using (a) straight line depreciation and (b) DDB depreciation. (c) What is the implied salvage value for DDB?arrow_forwardMethods for burying and covering solid waste in sanitary (solid waste) landfill. Explain with the help of diagram?arrow_forwardA currently owned shredder for use in a refuse-powered electrical generating plant has a present net realizable value of $210,000 and isexpected to have a market value of $10,000 after 4 years. Operating andmaintenance disbursements are $100,000 per year. An equivalent shredder can be leased for $200 per day plus $80 per hour of actual use as determined by an hour meter, with both components assumed to be paid at the end of the year. Actual use is expected to be 1,500 hours and 250 days per year. Using a 4-year planning horizon and a MARR of 15%, determine the preferred alternative using the annual cost criterion. Solve, a. Consider only the above information and use the cash flow approach (insider’s viewpoint approach). b. Consider the additional information that the annual cost of operating without a shredder is $190,000 and use the cash flow approach (insider’s viewpoint approach).arrow_forward
- > A coal-fired power plant has upgraded an emission control valve. The modification costs only $8000 and is expected to last 6 years with a $200 salvage value. The maintenance cost is expected to be high at $1700 the first year, increasing by 11% per year thereafter. Determine the equivalent present worth of the modification and maintenance cost by hand and by spreadsheet at 8% per year. Mark the correct answer within the multiple-choice alternatives below. a. -17,999 b. -14,862 c. +12,584 d. +18,193arrow_forwardDetermine: Use 3 Decimals a) Overhaul volume b) Volume of Borrow c) Volume of wastearrow_forwardYou are the lead consultant of team A consult, leading the charge for the siting of a landfill for the metropolitan area. Explain the likely factors you would consider for the land siting of the facilityarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,