Whether A build the maintenance facility or not.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
US Airways owns a piece of land near the Pittsburgh International Airport. The land originally cost USAirways $375,000. The airline is considering building a new training center on this land. US Airwaysdetermined that the proposal the new facility is acceptable if the original cost of the land is used in theanalysis, but the proposal does not meet the airline’s project acceptance criteria if the land cost is above$850,000. A developer recently offered US Airways $2.5 million for the land.Explain fully if US Airways should build the training facility at this location or not.
My answer is yes. Can you please suggest better ideas? Thank you!
The ARA Railroad owns a piece of land along one of its right-of-ways. The land originally cost ARA $100,000. ARA is considering building a new maintenance facility on this land. ARA determined that the proposal to build the new facility is acceptable if the original cost of the land is used in the analysis, but the proposal does not meet the railroad’s project acceptance criteria if the land cost is above $500,000. An investor has recently offered ARA $1 million for the land. Should ARA build the maintenance facility at this location? Why or why not?
The PARC Company can purchase gizmos to be used in building whatsits for $90 each. PARC can manufacture their own gizmos for $7000 per year overhead cost plus $25 direct cost for each gizmo, provided they purchase a gizmo maker for $100,000. PARC expects to use gizmos for 10 years. The gizmo maker should have a salvage value of $20,000 after 10 years. PARC uses 12% as its minimum attractive rate of return. At what annual production rate N should PARC make its own gizmos?
Chapter 8 Solutions
Managerial Economics: Applications, Strategies and Tactics (MindTap Course List)
Knowledge Booster
Similar questions
- Investors put up $520,000 to construct a building and purchase all equipment for a new restaurant. The investors expect to earn a minimum return of 10 per cent on their investment. The restaurant is open 52 weeks per year and serves 900 meals per week. The fixed costs are spread over the 52 weeks (i.e. prorated weekly). Included in the fixed costs is the 10% return to the investors and $1,000 per week in other fixed costs. Variable costs include $1,000 in weekly wages and $600 per week for materials, electricity, etc. The restaurant charges $5 on average per meal. If the restaurant were to shut down, what would losses per week?arrow_forwardIdentify the special cash flow category for each of the following. While developing a new product line, Cook Company spent $3 million two years ago to build a plant for a new product. Ultimately that project was not pursued. You are now evaluating a new project and would locate production inside of this building. What type of cash flow is the cost of the building? You hope to increase membership at your yoga studio by opening a smoothie bar inside of the yoga studio. When considering the feasibility of the smoothie bar, what type of cash flow is the increased studio membership? Suppose Walker Publishing Company is considering bringing out a new finance text whose projected revenues include some revenues that will be taken away from another of Walker's books. What type of cash flow are the lost sales on the older book? You currently operate a taco truck but are considering converting the food truck into a bubble tea truck. What type of cash flow are the profits currently earned…arrow_forwardA company is developing a new electronic product. It expects to spend $38 million on Research and Development and then another $6 million on Manufacturing Engineering. After completing all this, the company expects a cost of $15 per unit to manufacture and plans to build in a profit of $5 per unit into the price. The company needs to recover the cost of R&D plus Manufacturing Engineering over five years through sales of 4 million units over those five years. What will the company need to establish as the sales price for the unit?arrow_forward
- A company plans to design and build transport vehicles for the Army. The cost for the design is $10M. The cost for the test prototype is $2M. The cost to produce and test each production vehicle is $0.5M. What is the non-recurring cost? What is the recurring cost per vehicle? What price per vehicle must the company sell the vehicles to the government to make $50K profit per vehicle if the company sold 50 vehicles? 100 vehicles? Why does the price per vehicle go down when production goes up?arrow_forwardENGINEERING ECONOMY RATE WILL BE GIVEN. WRITE THE COMPLETE SOLUTIONS/EXPLANATION LEGIBLY OR TYPEWRITTEN. GIVE STRAIGHT TO THE POINT EXPLANATION. A company is analyzing a make-versus-purchase situation for a component used in several products, and the engineering department has developed these data: Option A: Purchase 10,000 items per year at a fixed price of $8.50 per item. The cost of placing the order is negligible according to the present cost accounting procedure. Option B: Manufacture 10,000 items per year, using available capacity in the factory. Cost estimates are direct materials = $5.00 per item and direct labor = $1.50 per item. Manufacturing overhead is allocated at 200% of direct labor (= $3.00 per item). Based on these data, should the item be purchased or manufactured?arrow_forwardConstruction on your custom home is complete and now the yard must be landscaped. The landscape contractor has estimated that 8 cubic yards of dirt and 3 cubic yards of sand will be required to level the yard and provide proper drainage. Dirt is priced at $35 per cubic yard and sand is priced at $27 per cubic yard. She has measured the yard and calculated the area needing sod to be 3600 ft2. Sod is sold in rolls that measure 90 ft? at a cost of $10 each per roll. Shrubbery installation will cost an additional $2500. Estimate the cost of the landscaping.arrow_forward
- The bookstore at Tech purchases jackets emblazoned with the school name and logo from a vendor. The vendor sells the jackets to the store for $38 apiece. The cost to the bookstore for placing an order is $120, and the annual carrying cost is 25% of the cost of a jacket. The bookstore manager estimates that 1700 jackets will be sold during the year. The vendor has offered the bookstore the following volume discount schedule: Order Size 1–299 Discount 0% 300–499 2% 500–799 4% 800+ 5%arrow_forwardA company is analyzing a make-versus-purchase situation for a component used in several products, and the engineering department has developed these data: Option A: Option B: Purchase 10,000 items per year at a fixed price of $8.88 per item. The cost of placing the order is negligible according to the present cost accounting procedure. Manufacture 10,000 items per year, using available capacity in the factory. Cost estimates are direct materials = $4.96 per item and direct labor = $1.31 per item. Manufacturing overhead is allocated at 200% of direct labor (= $2.62 per item). Based on these data, should the item be purchased or manufactured? The total cost of Option A is $ (Round to the nearest dollar.) The total cost of Option B is $ . (Round to the nearest dollar.) Should the item be purchased or manufactured? Choose the correct answer below. O The item should be manufactured. O The item should be purchased.arrow_forwardLEARNING EXERCISE 2 1. Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will serve equally well and will involve the same material and manufacturing cost except for the lathe and drill operations. Design A will require 12 hours of lathe time and 5 hours of drill time per 1,000 units. Design B will require 7 hours of lathe time and 8 hours of drill time per 1,000 units. The variable operating cost of the lathe, including labor, is $18.60 per hour. The variable operating cost of the drill, including labor, is $16.90 per hour. Finally, there is a sunk cost of $5,000 for Design A and $9,000 for Design B due to obsolete tooling. a. Which design should be adopted if 125,000 units are sold each year?2w gawen ni yilaunsm b. What is the annual saving over the other design? dipet jeen e1s enoiluloe uoy eue elsM evip elshetem pnimsel ertt of 1ele vem uoY ugjuo ioubivibni ns al airlTarrow_forward
- A company has a project for building and operating a new electricity generation station. The operation costs of generators is given by: Co = MHN3 Where M is constant, H is the operation hours, and N is the number of generators. It is known that, when the company uses 12 generators, the operation cost is found to be $ 250 per hour. Other overhead costs including electricity transformation and maintenance are estimated to be $40000 for each hour per generator. 1- What is the optimum number of generators to be used in order to 2- How to ensure your answer to part (1) is correct. imize costs?arrow_forwardA steam boiler is required as part of the design of a new plant. The types of fuel that can be used to ignite the boiler are natural gas, fuel oil, and coal. The cost of installation including all required controls is $40,000 for natural gas, $50,000 for fuel oil, and $120,000 for coal. In addition, the annual cost of fuel oil is $8,000 less than the annual cost of natural gas and $12,000 more than the annual cost of coal. The boiler is to be utilized for 20 years and interest rate is 8%. Using the most suitable approach, determine the best alternative. Is there any other consideration for the obtained result? As one way, please solve using either Cash Flow Analysis, Present Worth Analysis, or any other similar method. As a second way, use Excel software and include all required command statements require to solve it.arrow_forward1. A service station uses 2500 oil filters during the course of a year, and this usage is constant throughout the year. These oil filters are purchased from a supplier 100 miles away for $15 each, and the lead time is 2 days. The holding cost per oil filter per year is $1.50 (or 10% of the unit cost) and the ordering cost is $18.75. There are 250 working days per year. a) What is the service station's optimal order quantity and total annual cost of inventory?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: Applications, Strategies an...EconomicsISBN:9781305506381Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. HarrisPublisher:Cengage Learning
Managerial Economics: Applications, Strategies an...
Economics
ISBN:9781305506381
Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:Cengage Learning