Solid Waste Engineering
3rd Edition
ISBN: 9781305635203
Author: Worrell, William A.
Publisher: Cengage Learning,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 8, Problem 8.9P
To determine
The spacing between pipes.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Question 4Determine the required spacing between pipes in a leachate-collection system using a geonet and the following properties. Assume the most conservative design and that all stormwater from a 25-yr, 24-hr storm enters the leachate-collection system.Geonet transmissivity, ?= 10 ??2???⁄.Design storm (25-year, 24-hour) = 8.2 ??.Drainage slope = 2%Maximum design head on liner = 6 ??.
Determine the required spacing between pipes in a leachate-collection system using a geonet and the following properties. Assume the most conservative design and that all stormwater from a 25-yr, 24-hr storm enters the leachate-collection system. Geonet transmissivity, ? = 10 ?? 2 ? ?? ⁄ . Design storm (25-year, 24-hour) = 8.2 ?? . Drainage slope = 2% Maximum design head on liner = 6 ?? .
A municipal wastewater treatment plant employs three circular primary clarifiers arranged in parallel, following the bar screen and grit removal chamber. The plant receives 12 MGD. Each clarifier is center-fed (water enters at the center and exists at the perimeter).The clarifier radius is 56 ft and depth is 10 ft.What is the hydraulic loading rate (critical velocity) in each clarifier in units of ft3.ft-2.hr-1 ?
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Quick solution plz.. within 5 min.arrow_forward8. Determine the total volume of an aerated grit chamber for a wastewater treatment plant with an average flow of 62,000 m³/day and peak to average flow ratio of 2.2. The detention time at peak flow is 3 minutes. Calculate dimensions if the depth is 3.6 meters and L/W is 2.5.arrow_forwardDetermine the total volume of an aerated grit chamber for a wastewater treatment plant with an average flow of 62,000 m/day and peak to average flow ratio of 2.2. The detention time at peak flow is 3 minutes. Calculate dimensions if the depth is 3.6 meters and L/W is 2.5.arrow_forward
- Wastewater pipe with 70 m length, 4% slope, n= 0.014, d/D is 0.65 and 10" diameter, estimate the followings Vp/VfD Qp/Qf= m/sec Vfull= m/sec Qfull= Liter/sec V%3D m/sec Qp= Liter/secarrow_forwardex Design an aerated grit chamber for treating municipal waste water with average flow rate of 0.5 m3/s (43.2 MLD). Assume the peak flow rate to be 3 times the average.arrow_forwardDesign leach single pit for a pour-flush latrine for the data given below: Family members = 7 persons The design life of pit = 2.5 years The cross-section of the pit = rectangular Average wastewater flow rate = 12 lcd The soil is porous silty loam in the long term infiltrationarrow_forward
- (b) Relate how the momentum equations may be derived using fluid parameters.arrow_forwardH.W: Design a sedimentation tank to be treat 0.10 m³/secarrow_forwardDetermine the required spacing between pipes in a leachate-collection system using a geonetand the following properties. Assume the most conservative design and that all stormwaterfrom a 25-yr, 24-hr storm enters the leachate-collection system.Geonet transmissivity,arrow_forward
- a. Design a rectangular sedimentation tank to treat 2.4 million litres of raw water per day. Thedetention period may be assumed to be 3 hours. [5]b. Discuss any three types of particle settling in the sedimentation tank. [6]c. Discuss one mechanism of controlling particulate matter. [3]d. Discuss three reasons what determine the location of manholes.arrow_forward7.70 If the pipe shown has constant diameter, is this type of HGL possible? If so, under what additional conditions? If not, why not? HGL р Y Z Datum PROBLEM 7.70arrow_forwardNaOCI pumping rate, Qss = () L/s? (*No unit) Qin = 8000 GPM Cin = 0.0 mg/L Slip Stream Qss = ? L/s Css = 200 mg/L Main service line Qout = 8000 GPM Cout = 4.0 mg/L %3Darrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,