Calculate the corrected volumes of cut and fill using the following cross section
notes, with the road bed being 6 meter wide in cut and 4.8 meter in fill. Both cut
and fill have a 1:1 side slope.
Sta 3 +000
5.04
0.6
+0.39
5.46
+2.46
-2.64
0
Sta 2 +980
5.82
1.02
+0.60
4.80
-3.42
0
+1.80
QUESTION 1
In a certain portion of road to be constructed, the following data were taken.
Station 1+020
8m
8.5m
-1.555
?
1.25
m²
m²
m³
-1.21
Station 1+090
0
+2.55
Base width for cut
Base width for fill
1.25:1 Side slope for cut
1:1
Side slope for fill
____?__
-0.9
0.95
a) Compute area of first station
b) Compute area of second station
c) Determine difference in volume of cut and fill using End Area Method
The following is a set of notes of an earthworks of a road construction which is undertaken by the DPWH. The base of the roadway is 9m which conforms with the DPWH standards. Side slope is 1.5:1.a. Compute the cross sectional area at station 1+020.b. Compute the cross sectional area at station 1+040.c. Compute the volume between the two stations using end areamethod.
*Please refer from the figure attached*
Pls answer in COMPLETE SOLUTION
3 DECIMAL PLACES ALL FINAL ANSWERS
Show an illustration
Thank you!
Chapter 8 Solutions
Construction Management
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- For the given road cross section notes, the width of the road is 11.00 meters with SSof 1:1. Find the earthwork volume using the following methods: • Average End Area• Prismoidal Formula• Prismoidal Correction• Road Sections STA 10 + 000 3.00 1.50 1.00 -8.50 0.00 6.50 STA 10 + 020 2.20 1.20 2.60 -7.70 0.00 8.1arrow_forwardThe figure below shows the vertical offset from the proposed finished road level to the Natural Grade Line. Determine the a) area of cut and b) area of fill. 1.00M+1.00M+1.50M- 1.50M 1.50M1.00M+1.56M1.00M+1.00M+1.0OM+1.00M+1.00M NGL 3.19M 2 96M 2.75M 242M CUT 2 40M 2 00M 1.3BM 0.86M ROAD LEVEL 053M 0.77M FILL 1.14M 141M 1.5OM NGLarrow_forwardThe following are section notes of a five-level section Station 1+ 125 ? 12.0 10.0 -5.3,- - 4.0'-8.80 -6.20’ – 6.0 Station 1 + 175 22 13 9 20 +5.2 +7 +4.2 +4.3 +3.1 • Assume the following: Base of roadway: 20 m - Sideslopes: 1.5:1 Required: - Determine the area of the cross-section - The volume of excavation and fill using end-area methodarrow_forward
- QUESTION 1 The cross section at station 2+60 has a cut area of 9 ft2 and a fill area of 4 ft² and the cross section at station 3+00 has a cut area of 7 ft² and a fill area of 8 ft2. What is the volume (yd³) of cut between these stations? Round to the nearest hundredths.arrow_forwardA series levelling had been down along the centre line of the proposed road the distance between each two points (100m). If the elevation of the points A, E and H after completing the project should be 31m, 30m, and 31.5m respectively and these three points connected with straight lines having uniform gradient. Calculate the depth of cut and fill for the points C and G. St. No. BS IS FS Remark A 1.25 2.18 1.78 1.93 D 1.91 1.27 E 1.86 В.М-30.09 F 1.61 G 1.43 H 2.7arrow_forwardIn a proposed highway undergoing road earthworks, the given roadway cross-section notes are as follows: STA 20 + 100 2.30 -6.45 1.50 0.00 1.00 4.50 2.00 -6.00 2.60 6.90 STA 20+ 300 1.20 0.00 Width of the roadway is to be determined using side slope of xH:1V where x is the unknown horizontal side of the slope. Show and draw plotted points of the cross-section of roadway each station. Calculate the following: 1. Total number of man-days to finish the earthwork job 2. Total cost of machine rentals to finish the earthwork job. In the inventory of available heavy equipment on site are two (2) hydraulic excavators with bucket payload capacity each of 0.76m³ and one (2) hydraulic excavator with bucket payload capacity of 1.15m³. The hourly production of each excavator with 100% efficiency are 149m³ and 196m³ respectively. Daily machine rental fees for smaller capacity is 1,200 pesos while bigger capacity costs 2,200 pesos. Daily machine operation is limited to 8 hours.arrow_forward
- Calculate the quantity of earth work for the road with the following: stations 0 Depth of cut (m) 1 Height of filling(m) 100 200 300 400 3 0.5 The width of road-10 m, side slope 1:1 to cut and fill. 1 2arrow_forwardA series levelling had been down along the centre line of the proposed road the distance between each two points (100m). If the elevation of the points A, E and H after completing the project should be 31m, 30m, and 31.5m respectively and these three points connected with straight lines having uniform gradient. Calculate the depth of cut and fill for the points C and G.arrow_forward4. How is slipout repair paid for? 5. A roadway segment has the following characteristics: From Station 50+20 to Sta. 51+50 needs cut (excavation), and the cross-sectional areas are 150 sf and 220 sf. a. b. From Sta 51+50 to Sta 52+00 need fill, and the cross-sectional areas are 220 sf and 250 sf. From Sta 52+00 to 52+80 need cut, and the cross-sectional areas are 250 sf and 65 sf. C. If the Contractor's bid for roadway excavation is $140 per cubic yard, how much will the payment be for this section of roadway.arrow_forward
- St. No. A B al C D E F G H A series levelling had been down along the centre line of the proposed road the distance between each two points (100m). If the elevation of the points A, E and H after completing the project should be 31m, 30m, and 31.5m respectively and these three points connected with straight lines having uniform gradient. Calculate the depth of .cut and fill for the points C and G BS 1.25 1.78 1.91 IS 2.18 1.86 1.61 1.43 FS 1.93 1.27 2.7 Remark B.M-30.09 -0.57m, 0.48m -1.63m, -1.45m 0.54m, -1.37m -1.96m, -0.88m -1.73m, -1.92m -0.97m, -0.48marrow_forwardQ5. As a civil engineer, you have been assign to prepare earthwork cost estimation for a proposed road alignment projects between Pekan Nenas and Pontian Kecil. Table Q5 shows the list of volume cut and fill for each cross-section between CH 4000m to CH 5700m at 50 m intervals. Table Q5 Chainage (m) Volume Cut (m³) Volume Fill (m³) 4000 6000 2000 4050 2800 2103 4100 2999 2010 4150 2846 2105 4200 2501 2090 4250 2090 2149 4300 2000 2515 4350 2000 2905 4400 2000 3110 4450 2000 2989 4500 2000 2650 4550 2000 2199 4600 2309 2199 4650 2650 2000 4700 3300 2000 The following information are required in preparing earthwork cost estimation progress claim to the client as soon as possible: (a) Plot a mass-haul diagram between the chainage 4000m to 4700m using the volumes obtained in Table Q5. Use a scale of 1cm = 50 m for the x-axis and 2 cm = 500 m3 for the y-axis. (b) Estimate the haulage costs between the chainage 4000m to 4450m. Proposed balancing line and free haul distance are at +4000m3 and…arrow_forwardCalculate the total earth work volume for the following roadway in cubic yards: 1) Using Average-End-Area Method; 2) Using the Prismoidal Formula Method Area Method. Sta End Area 32+00 199.8 ft2 32+50 208.3 ft2 33+00 192.1 ft2arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning