a)
Summary Introduction
To determine: The graph illustrating the crossover point.
Introduction:
Crossover point:
The crossover or the indifference point is the point at which the
b)
Summary Introduction
To determine: The number of units at which the choices have the same cost.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Merrimac Manufacturing Company has always purchased acertain component part from a supplier on the East Coast for$50 per part. The supplier is reliable and has maintained thesame price structure for years. Recently, improvements in operations and reduced product demand have cleared up somecapacity in Merrimac’s own plant for producing componentparts. The particular part in question could be produced at$40 per part, with an annual fixed investment of $25,000.Currently, Merrimac needs 300 of these parts per year.a. Should Merrimac make or buy the component part?b. As another alternative, a new supplier located nearby isoffering volume discounts for new customers of $50per part for the first 100 parts ordered and $45 per partfor each additional unit ordered. Should Merrimacmake the component in-house, buy it from the newsupplier, or stick with the old supplier?c. Would your decision change if Merrimac’s annual demand increased to 2000 parts? increased to 5000 parts?d. Develop a set of…
#4- The mean number of air conditioning units assembled per month by Freeze, Inc. is 750 and the standard deviation is 100 units.
a. If the number of air conditioning units assembled per month follows a normal distribution, calculate the probability of Freeze, Inc
to assemble a quantity of air conditioning units greater than the monthly break-even point calculated in problem 3-a.
b. An improved assembling process is proposed to Freeze, Inc. to reduce the variable cost from $500 per unit to $400 per unit.,
increase the mean number of air conditioning units assembled per month from 750 to 850 and reduce the standard deviation to 90
units. As a result of the improvements, monthly fixed costs would go up from $250,000 to $300,000. Once these improvements are
implemented, calculate the new number of air conditioning units that Freeze Inc. must sell every month to break-even, discuss and
justify if you would recommend the process improvement initiative.
c. If the number of air conditioning…
i need the solution for this question using excel solver ( simplex method ) send me a screenshot of the solution in excel
Chapter 7 Solutions
Operations Management
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - How is actual, or expected, output computed?Ch. 7.S - Explain why doubling the capacity of a bottleneck...Ch. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Explain how net present value is an appropriate...Ch. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the past month, the plant in Problem S7.1,...Ch. 7.S - If a plant has an effective capacity of 6,500 and...Ch. 7.S - Prob. 4PCh. 7.S - Material delays have routinely limited production...Ch. 7.S - Prob. 6PCh. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Under ideal conditions, a service bay at a Fast...Ch. 7.S - A production line at V. J. Sugumarans machine shop...Ch. 7.S - A work cell at Chris Ellis Commercial Laundry has...Ch. 7.S - The three-station work cell Illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Klassen Toy Company, Inc., assembles two parts...Ch. 7.S - Prob. 15PCh. 7.S - Prob. 16PCh. 7.S - Markland Manufacturing intends to increase...Ch. 7.S - Using the data in Problem S7.17. a. What is the...Ch. 7.S - Given the data in Problem S7.17, at what volume...Ch. 7.S - Janelle Heinke, the owner of HaPeppas!, is...Ch. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - As a prospective owner of a club known as the Red...Ch. 7.S - Prob. 27PCh. 7.S - James Lawsons Bed and Breakfast, in a small...Ch. 7.S - Prob. 29PCh. 7.S - Prob. 30PCh. 7.S - Prob. 31PCh. 7.S - What is the present value of 5,600 when the...Ch. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Bolds Gym, a health club chain, is considering...Ch. 7.S - Prob. 1VCCh. 7.S - Prob. 2VCCh. 7.S - Prob. 3VCCh. 7 - What is process strategy?Ch. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - What is process redesign?Ch. 7 - Prob. 5DQCh. 7 - Name the tour quadrants of the service process...Ch. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Identify manufacturing firms that compete on each...Ch. 7 - Identify the competitive advantage of each of the...Ch. 7 - Prob. 11DQCh. 7 - Identify the competitive advantage of each of the...Ch. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Explain what a flexible manufacturing system (FMS)...Ch. 7 - Prob. 17DQCh. 7 - Prepare a flowchart tor one of the following: a....Ch. 7 - Prob. 2PCh. 7 - Prepare a time-function map for one of the...Ch. 7 - Prepare a service blueprint for one of the...Ch. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Ski Boards, Inc., wants to enter the market...Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Using Figure 7.6 in the discussion of value-stream...Ch. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Rochester Manufacturings Process Decision...Ch. 7 - Prob. 2CSCh. 7 - Prepare the case for an optimistic sales manager...Ch. 7 - Prob. 1.1VCCh. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Prob. 2.1VCCh. 7 - Prob. 2.2VCCh. 7 - Process Strategy at Wheeled Coach Video Case Video...Ch. 7 - Prob. 2.4VC
Knowledge Booster
Similar questions
- Theories and concepts: Cause of the difficulties In this section, I will explain the causes of the difficulties which I have explained above. The reason for the missing cages uses to be that the cage is still being picked or not and if the picker is still using the cage to pick the items then request the picker to drop the cage off to the packing department so that the items can be packed and sent out the shipping department for the delivery. Also, if the cage is not in the picking department buffer or pack buffer and is not being picked then as a process guide it was my duty to search for the cage at the packing stations first, and if not found then to escalate to the management so that relevant department can be contacted for the action. During the critical pool time, there were a few shipments IDs use to get sent down from the picking department which they couldn’t send into the picker’s scanners as either the batch assigned for the item by the stowing department would be wrong or…arrow_forwardReducing In-Process Inventory a. To provide a basis of comparison, begin by evaluating the status quo. Determine the expected amount of in-process inventory at the presses and at the inspection station. Then calculate the expected total cost per hour of the in-process inventory, the presses, and the inspector. b. What would be the effect of proposal 1? Why? Make specific comparisons to the results from part a. Explain this outcome to Jerry Carstairs. d. Make your recommendations for reducing the average level of in-process inventory at the inspection station and at the group of machines. Be specific in your recommendations, and support them with quantitative analysis like that done in part a. Make specific comparisons to the results from part a, and cite the improvements that your recommendations would yield. Pls include step by step solution using MS Excelarrow_forwardHotel ComplaintsA luxury hotel has been receiving a lot of complaints from guests recently. The manager worries that if these complaints continue, the hotel will start to lose clients. Therefore, you have been hired as a consultant to correct the problem(s). A list of the major complaints by week for the last month is as follows: Complaint Number of Occurrences Week 1Error on bill 10Room not ready at check-in 8Room service delivery late 3Longline at check-out 10 Week 2Error on bill 12Noise in hallway 2Longline at check-out…arrow_forward
- Q5) Manufacturing overhead costs are easy to trace and can be ignored while calculating total costs. Select one: True Falsearrow_forwardMerrimac Manufacturing Company has always purchased acertain component part from a supplier on the East Coast for$50 per part. The supplier is reliable and has maintained the same price structure for years. Recently, improvements in op-erations and reduced product demand have cleared up some capacity in Merrimac’s own plant for producing componentparts. The particular part in question could be produced at$40 per part, with an annual fixed investment of $25,000.Currently, Merrimac needs 300 of these parts per year.a. Should Merrimac make or buy the component part?b. As another alternative, a new supplier located nearby isoffering volume discounts for new customers of $50per part for the first 100 parts ordered and $45 per partfor each additional unit ordered. Should Merrimacmake the component in-house, buy it from the newsupplier, or stick with the old supplier? c. Would your decision change if Merrimac’s annual de-mand increased to 2000 parts? increased to 5000 parts? d. Develop a set…arrow_forwardsecond image is the choices for the blanksarrow_forward
- To design the processes for manufacturing a product, operation managers need to understand the relationship between product variety and product volume. Supply chain theoreticians' businesses have been able to classify product-processes by the level of product variation and volume and through this have been able to define how many different product-processes? Multiple Choice 7. ( Prev 19 of 30 Next > 262 tv MAR 3.arrow_forward2arrow_forwardRefer to Problem 7.1. If a contract for the secondand third years is pending, what a re the implications fo r processselection?arrow_forward
- Refer to the figure below relating to a commercial printer (customer) and the company that supplies the paper. Technical requirements Importance to customer Customer requirements Paper will not tear 3 A Consistent finish No ink bleed Prints cleanly 1 2 3 7 Paper width 7 Paper thickness ? Roll roundness thickness Paper width Paper Roll roundness Coating thickness Tensile strength Paper color ? Coating thickness ? Tensile strength 7 Paper color O Customer Requirements Paper doesn't wrinkle Prints clearly Easy to use a. What technical requirements have the highest impact on the customer requirement that the paper not tear? (You may select more than one answer. Click the box with a check mark for the correct answer and click to empty the box for the wrong answer.) J O Type of Paper b. The following table presents technical requirements and customer requirements for the output of a laser printer. Determine which single technical requirement likely has the greatest Impact on each individual…arrow_forwardHii solve only final answers fast no need long explanationarrow_forwardThe Chineke Group of Company manufactures two products, namely product B and product P, and provides you with the following information: Prod. B Prod. P Selling price per unit 80.00 50.00 Less cost of sales: Direct material A @ R5.00 per kg 15.00 10.00 Direct material B @ R4.00 per kg 8.00 12.00 Direct labour @ R6.00 per hour 12.00 6.00 Variable manufacturing overhead @ R5.00 per labour hour 10.00 5.00 Fixed manufacturing overhead per unit 5.00 5.00 Gross profit 30.00 12.00 Less sales & administrative costs: Variable 6.00 4.00 Fixed 10.00 5.00 Net profit per unit 14.00 3.00 Take note of the following constraints: Material A available 360 kg Material B available 360 kg Labour hours available…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios