Chapter 7, Problem 7.15P
To determine
The estimated cost of the given slab.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Hi! can you please help me with this? I'm stuck because we need to provide explanation and I don't know how to explain. Thank you in advance!
Q: How much concrete do you need to fill 1800 sq. ft. of space?
Concrete estimate
If it takes 5 days to complete 2,000 S.F. of 8" x8" *16" concrete
masonry units (CMUS) at a total labor cost of $8,220, how long does it
take to install 2,400 S.F.?
O 5 days
O 6 days
O 4 days
O 3 days
Chapter 7 Solutions
Architectural Drafting and Design (MindTap Course List)
Ch. 7 - Prob. 7.1QCh. 7 - Prob. 7.2QCh. 7 - Prob. 7.3QCh. 7 - Prob. 7.4QCh. 7 - Prob. 7.5QCh. 7 - Prob. 7.6QCh. 7 - Prob. 7.7QCh. 7 - Prob. 7.8QCh. 7 - Prob. 7.9QCh. 7 - Prob. 7.10Q
Ch. 7 - Prob. 7.11QCh. 7 - Prob. 7.12QCh. 7 - Prob. 7.13QCh. 7 - Prob. 7.14QCh. 7 - Prob. 7.15QCh. 7 - Prob. 7.16QCh. 7 - Prob. 7.17QCh. 7 - Prob. 7.18QCh. 7 - Prob. 7.19QCh. 7 - Prob. 7.20QCh. 7 - Prob. 7.5PCh. 7 - Prob. 7.6PCh. 7 - Prob. 7.7PCh. 7 - Prob. 7.8PCh. 7 - Prob. 7.9PCh. 7 - Prob. 7.10PCh. 7 - Prob. 7.11PCh. 7 - Prob. 7.12PCh. 7 - Prob. 7.13PCh. 7 - Prob. 7.14PCh. 7 - Prob. 7.15P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Determine the number of modular bricks necessary for the front wall if the house shown in the figure. Add 4% for waste. Determine the cost to lay the brick. It takes a mason 6 labor hours and a laborer 8.5 labor hours to construct 100 square feet of brick. The average hourly wage for a mason ·30⁰ $42.33 and for a laborer is $21.03. -61-8⁰ ||3¹ Elevation ·16' 24' +4'.arrow_forwardMy database for Formworks and Falseworks Unit cost is Php 1, 040 per sq. m. If I am to Construct 4 columns with height of 2.5 meters per column and Cross section of 0.3m x 0.4m, How much should my budget be for my formworks and falsework- based on the Unit cost?arrow_forwardA simple platform having a stair will be constructed, as an estimator, your boss gave you an assignment to estimate the concrete works needed for the stairs only. The width of the stair is exactly 1 meter. Approximately, what is the volume of the structure?arrow_forward
- Determine the minimum area of shrinkage bars (mm2) for a slab having thickness of 150 mm. Round of your answer to a whole number, no need to write down the unit.arrow_forwardA simple platform having a stair will be constructed, as an estimator, your boss gave you an assignment to estimate the concrete works needed for the stairs only. The width of the stair is exactly 1 meter. Approximately, what is the volume of the structure? 1.95 cu.m. 1.75 cu.m. 1.65 cu.m. 2.15 cu.m.arrow_forwardYou are the Field Engineer and Cost Engineer for a residential project that you are managing. In three (3) days, your endeavor will begin Masonry Works. In accordance with this, you must calculate (ahead of time) the total number of CHB sections required for the road-facing exterior walls. To ensure you have sufficient materials, you added an allowance for eight percent (8%) breakage. Determine the quantity of CHB to be ordered. Round your answer to the nearest integer.Student Number is the Total Contract Price (TCP) of the Undertaking. If the project's operating expenses are 35% of the total budget, how much will be left if the price of CHB is 13 pesos and 16 pesos, respectively? use 123456 as the TCP. Below are specifics: NEED ASAP 30 MINSarrow_forward
- Calculate total cost per cubic yard of concrete, given the following: Concrete materials and batching costs = $70/cy Trucking = $6.00/cy Paving equipment = $340.00/hr - Paving labor = $500.00/hr Paver production = 120 cy/hr Incidentals $4.00/cy Overhead and profit = 20% of direct costs 1.87.0 = O2.106.8 O 3.104.4 4.99.6arrow_forwardWith a total cost of P1,305.00, what is the required area if %" x 4" x 8' Marine plywood @ P435.00/BF is to be used?arrow_forwardCalculate the cost per cubic yard to place concrete using each of the alternatives described. The work in both cases consists of placing 140 cubic yards of concrete in footings. a. Using a crane and bucket at a price of $225 per hour, including an operator, with a crew consisting of 6 laborers, a cement finisher, and a foreman. The concrete will be placed in 7 hours using this setup, and transportation of the crane costs $390. b. Using a concrete pump at a price of $295 per hour, including an operator and a crew consisting of 5 laborers, a cement finisher, and a foreman. With this setup, concrete is placed in 6 hours and transportation of the pump costs $290.arrow_forward
- List five job factors that are specific to concrete work and should be considered whenever this type of work is priced.arrow_forward°Please answer in complete solution & draw a fbd if needed. Thank youarrow_forwardHow many cubic yards of concrete are required to construct 31 each 18-inch-diameter, 8-foot-high concrete columns? Include 5% waste. Concrete must be ordered in 1/4 cubic-yard increments.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Pricing Concrete Jobs - 24' X 24' Concrete Floor (Prep, Pour, Finish); Author: Mike Day Concrete;https://www.youtube.com/watch?v=V-fgI1Hiu9w;License: Standard Youtube License