Question
Book Icon
Chapter 7, Problem 29P
To determine

The approach’s total delay for the cycle.

Blurred answer
Students have asked these similar questions
A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/In for all phases). The lost time is known to be 4 seconds for each phase. Assuming X₁ = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth phase? 6.93 sec O 21.89 sec Ⓒ 7.78 sec Q 7.41 sec
A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all phases). The lost time is known to be 4 seconds for each phase. Assuming Xi = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth phase?
The saturation flow for an intersection approach is 3600 veh/h. At the beginning of cycle no vehicles are queued. The signal is timed so that what the queue is 13 vehicles the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds. What is the arrival rate assuming D/D/1 queuing?
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning