EBK PRINCIPLES OF HIGHWAY ENGINEERING A
6th Edition
ISBN: 9781119299332
Author: WASHBURN
Publisher: JOHN WILEY+SONS,INC.-CONSIGNMENT
expand_more
expand_more
format_list_bulleted
Question
Chapter 7, Problem 29P
To determine
The approach’s total delay for the cycle.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210
veh/h (saturation flow rates are 1800 veh/h/In for all phases). The lost time is known to be 4 seconds for each
phase. Assuming X₁ = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth
phase?
6.93 sec
O 21.89 sec
Ⓒ 7.78 sec
Q 7.41 sec
A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all phases). The lost time is known to be 4 seconds for each phase. Assuming Xi = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth phase?
The saturation flow for an intersection approach is 3600 veh/h. At the beginning of cycle no vehicles are queued. The signal is timed so that what the queue is 13 vehicles the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds. What is the arrival rate assuming D/D/1 queuing?
Chapter 7 Solutions
EBK PRINCIPLES OF HIGHWAY ENGINEERING A
Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10P
Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19PCh. 7 - Prob. 20PCh. 7 - Prob. 21PCh. 7 - Prob. 22PCh. 7 - Prob. 23PCh. 7 - Prob. 24PCh. 7 - Prob. 25PCh. 7 - Prob. 26PCh. 7 - Prob. 27PCh. 7 - Prob. 28PCh. 7 - Prob. 29PCh. 7 - Prob. 30PCh. 7 - Prob. 31PCh. 7 - Prob. 32PCh. 7 - Prob. 33PCh. 7 - Prob. 34PCh. 7 - Prob. 35PCh. 7 - Prob. 36PCh. 7 - Prob. 37PCh. 7 - Prob. 38PCh. 7 - Prob. 39PCh. 7 - Prob. 40PCh. 7 - Prob. 41PCh. 7 - Prob. 42PCh. 7 - Prob. 43PCh. 7 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Prob. 47PCh. 7 - Prob. 48PCh. 7 - Prob. 49PCh. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - Prob. 57PCh. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62P
Knowledge Booster
Similar questions
- An approach to a pre-timed signal has 40 sec of effective green in a 75-second cycle.The approach volume is 700 veh/h and the saturation flow rate is 1600 veh/h.Calculate the time to queue clearance after the start of the effective green, themaximum number of vehicles in the queue, the total vehicle delay per cycle andthe average delay per vehicle assuming D/D/1 queuing.arrow_forwardA fixed time two-phase signal is to be designed for a four-legged intersection, for which the design hourly flow and saturation flow are given below: Details of flow Details hourly flow (veh/h) Saturation flow (veh/h) North South East West 570 320 550 455 1750 1500 2210 2265 Time lost per phase due to starting delays is 2 seconds. Calculate the optimum cycle time and allocate the green time for the two phases using Webster's method.arrow_forwardAn observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies)?arrow_forward
- The total cycle time of an intersection is 60 seconds, the green time for the phase is 27 seconds and the corresponding yellow time is 4 seconds. If the saturation headway is 2.4 seconds/ vehicle, the startup lost time is 2 seconds/phase and the clearance lost time is 1 second/phase then the capacity of the movement is (a) 1500 veh/hr/lane (c) 500 veh/hr/lane (b) 700 veh/hr/lane (d) 300 veh/hr/lanearrow_forwardAn intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. O 15.552 sec O 11.462 sec O 14.825 sec Phase O 16.065 sec Allowed movements Analysis flow rate Saturation flow rate Using v/c equalization ratio, calculate the effective green time for phase 3 1 NB L, SB L 330, 365 veh/h 1700, 1750 veh/h 2 NB T/R, SB T/R 1125, 1075 veh/h 3400, 3300 veh/h EB L, WB L 110, 80 veh/h 650, 600 veh/h 3 EB T/R, WB T/R 250, 285 veh/h 1750, 1800 veh/harrow_forwardAn intersection approach has a saturation flow rate of 1500 veh/h, and vehicles arrive at the approach at the rate of 800 veh/h. The approach is controlled by a pretimed signal with a cycle length of 60 seconds and D/D/1 queuing holds. Local standards dictate that signals should be set such that all approach queues dissipate 10 seconds before the end of the effective green portion of the cycle. Assuming that approach capacity exceeds arrivals, determine the maximum length of effective red that will satisfy the local standards.arrow_forward
- For a given one-lane approach of a signalized intersection, the base free flow speed is 40 mph, flow rate is 450 vphpl, saturation flow rate is 1,800 vphgpl, cycle length and red interval are 90 seconds and 30 seconds. Compute the following: The total time duration from the first vehicle in queue to the last queued vehicle being discharged per cycle The longest queue length and total number of vehicles in queue per cycle; Total vehicle-hours of delay and average delay per vehicle per cycle.arrow_forwardCompute the average approach delay per cycle, given the saturation flow rate of 2400 veh/h and is allocated 24 seconds of effective green in an 80-second signal cycle. Flow at the approach is 500 veh/h. Assume the traffic flow accounts for the peak 15-min period and that there is no initial queue at the start of the analysis period.arrow_forwardAn intersection has a three-phase signal with the movement allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired Phase 1 2 3 Allowed Movement NB L, SB L NB T/R, SB T/R EB L, WB L EB /T/R, WB T/R Analysis Flow Rate 330, 365 veh/h 1125, 1075 veh/h 110, 80 veh/h 250, 285 veh/h Saturation Flow Rate 1700, 1750 veh/h 3400, 300 veh/h 650, 600 veh/h 1750, 1800 veh/h Calculate the Following: 1.)Sum of flow ratios for critical lane groups 2.)minimum cycle length 3.)using v/c equation ratio, calculate the effective green time for phase 1 4.)using v/c equation ratio, calculate the effective green time for phase 2 5.)using v/c equation ratio, calculate the effective green time for phase 3arrow_forward
- The saturation flow rate for an intersection approach is 3600 veh/h. At the beginning of a cycle (effective red) no vehicles are queued. The signal is timed so that when the queue (from continuously arriving vehicles) is 13 vehicles long, the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds, what is the approach's arrival rate, assuming D/D/1 queueing? Draw a D/D/1 queuing diagram and label accordingly. Q1: Determine the approach arrival rate, in veh/h, round answer to nearest WHOLE number. Q2: Draw a neat and clear D/D/1 queuing diagram and label accordingly. Include with your PDF submission anfonanarrow_forwardAn intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. O 12.105 sec O 15.954 sec O 13.190 sec Phase O 14.127 sec Allowed movements Analysis flow rate Saturation flow rate 1 NB L, SB L 330, 365 veh/h 1700, 1750 veh/h Using v/c equalization ratio, calculate the effective green time for phase 1 2 NB T/R, SB T/R 1125, 1075 veh/h 3400, 3300 veh/h EBL, WBL 110, 80 veh/h 650, 600 veh/h 3 EB T/R, WB T/R 250, 285 veh/h 1750, 1800 veh/harrow_forwardAn observer notes that an approach to a pretimed signal, the time it will take the queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) is 60 s. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, what is the maximum number of vehicles in a queue in a given cycle? Round off the final answer to whole number (no units).arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning