Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 6, Problem 43P
Summary Introduction
To frame: The players line-up using the given restrictions.
Introduction: The variation between the present value of the
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A political party is planning a ninety-minute television show. The show will have at least 9 minutes of direct requests for money from viewers. Three of the party's politicians will be on the
show- a senator, a congresswoman, and a governor. The senator, a party "elder statesman," demands that he be on screen for at least twice as long as the governor. The total time taken by the
senator and the governor must be at least twice the time taken by the congresswoman. Based on a pre-show survey, it is believed that 37, 41, and 45 (in thousands) viewers will watch the
program for each minute the senator, congresswoman, and governor, respectively, are on the air. Find the time that should be allotted to each politician in order to get the maximum number of
viewers. Find the maximum number of viewers.
The quantity to be maximized, z, is the number of viewers in thousands. Let x, be the total number of minutes allotted to the senator, × be the total number of minutes allotted to the…
Creative Robotics (CR) manufactures two lightweight robots designed for easier house-cleaning. The Alpha-ONE model is older, heavier, and is designed for carpet cleaning. The Alpha-TWO model is newer, lighter, and is designed primarily for wooden floor cleaning. The management team is trying to identify how to minimize the total costs of producing these two models. Their full-time workers consist of primarily manufacturing experts and about 3 people are required to commit themselves to manufacture the Alpha-ONE model and 4 for the Alpha-TWO model, per day. They have a total pool of 100 full-time workers now but are willing to hire more manufacturers if required. Similarly, the Alpha-TWO model is more complex and management has a pool of 20 part-time technical workers to help with the complexity, every day. Again, they are willing to hire more part-time workers if required to assist with the Alpha-TWO model. As far as staff allocations for additional assistance in manufacturing…
Ariel holds a $10,000 portfolio that consists of four stocks. Her investment in each stock, as well as each stock’s beta, is listed in the following table:
Stock
Investment
Beta
Standard Deviation
Andalusian Limited (AL)
$3,500
0.80
15.00%
Kulatsu Motors Co. (KMC)
$2,000
1.50
12.00%
Western Gas & Electric Co. (WGC)
$1,500
1.20
16.00%
Makissi Corp. (MC)
$3,000
0.50
22.50%
Suppose all stocks in Ariel’s portfolio were equally weighted. Which of these stocks would contribute the least market risk to the portfolio?
Makissi Corp.
Andalusian Limited
Western Gas & Electric Co.
Kulatsu Motors Co.
Suppose all stocks in the portfolio were equally weighted. Which of these stocks would have the least amount of standalone risk?
Western Gas & Electric Co.
Makissi Corp.
Andalusian Limited
Kulatsu Motors Co.
If the risk-free rate is 4% and the market risk premium is 6%, what is Ariel’s…
Chapter 6 Solutions
Practical Management Science
Ch. 6.3 - Prob. 1PCh. 6.3 - Prob. 2PCh. 6.3 - Solve Problem 1 with the extra assumption that the...Ch. 6.3 - Prob. 4PCh. 6.3 - Prob. 5PCh. 6.3 - Prob. 6PCh. 6.3 - Prob. 7PCh. 6.3 - Prob. 8PCh. 6.3 - Prob. 9PCh. 6.3 - Prob. 10P
Ch. 6.4 - Prob. 11PCh. 6.4 - Prob. 12PCh. 6.4 - Prob. 13PCh. 6.4 - Prob. 14PCh. 6.4 - Prob. 15PCh. 6.4 - Prob. 16PCh. 6.4 - Prob. 17PCh. 6.4 - Prob. 18PCh. 6.4 - Prob. 19PCh. 6.4 - Prob. 20PCh. 6.4 - Prob. 21PCh. 6.4 - Prob. 22PCh. 6.4 - Prob. 23PCh. 6.5 - Prob. 24PCh. 6.5 - Prob. 25PCh. 6.5 - Prob. 26PCh. 6.5 - Prob. 28PCh. 6.5 - Prob. 29PCh. 6.5 - Prob. 30PCh. 6.5 - In the optimal solution to the Green Grass...Ch. 6.5 - Prob. 32PCh. 6.5 - Prob. 33PCh. 6.5 - Prob. 34PCh. 6.5 - Prob. 35PCh. 6.6 - Prob. 36PCh. 6.6 - Prob. 37PCh. 6.6 - Prob. 38PCh. 6 - Prob. 39PCh. 6 - Prob. 40PCh. 6 - Prob. 41PCh. 6 - Prob. 42PCh. 6 - Prob. 43PCh. 6 - Prob. 44PCh. 6 - Prob. 45PCh. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Prob. 54PCh. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Prob. 67PCh. 6 - Prob. 68PCh. 6 - Prob. 69PCh. 6 - Prob. 70PCh. 6 - Prob. 71PCh. 6 - Prob. 72PCh. 6 - Prob. 73PCh. 6 - Prob. 74PCh. 6 - Prob. 75PCh. 6 - Prob. 76PCh. 6 - Prob. 77PCh. 6 - Prob. 78PCh. 6 - Prob. 79PCh. 6 - Prob. 80PCh. 6 - Prob. 81PCh. 6 - Prob. 82PCh. 6 - Prob. 83PCh. 6 - Prob. 84PCh. 6 - Prob. 85PCh. 6 - Prob. 86PCh. 6 - Prob. 87PCh. 6 - Prob. 88PCh. 6 - Prob. 89PCh. 6 - Prob. 90PCh. 6 - Prob. 91PCh. 6 - Prob. 92PCh. 6 - This problem is based on Motorolas online method...Ch. 6 - Prob. 94PCh. 6 - Prob. 95PCh. 6 - Prob. 96PCh. 6 - Prob. 97PCh. 6 - Prob. 98PCh. 6 - Prob. 99PCh. 6 - Prob. 100PCh. 6 - Prob. 1CCh. 6 - Prob. 2CCh. 6 - Prob. 3.1CCh. 6 - Prob. 3.2CCh. 6 - Prob. 3.3CCh. 6 - Prob. 3.4CCh. 6 - Prob. 3.5CCh. 6 - Prob. 3.6C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A state civil service hires a wide variety of employees, ranging in pay and educational levels from janitors and truck drivers to clerical staff at various levels and professionals in a wide variety of fields (such as engineering, law enforcement, and social work). These entry-level people report to supervisors, who report to program managers, who report to division directors, who report to department directors, who report to the governor. The department directors serve at the pleasure of the governor and are charged by the governor with strategically directing their departments to fulfill various campaign promises. The other employees take standardized tests and are hired and promoted on a civil service, merit-based plan. During their first year in their positions, these employees are employed on a probationary basis, with evaluations every 90 days. After the first year, supervisors evaluate employee performance once a year. The appraisal process is standardized, with the supervisor…arrow_forwardWrite down linear programming for this assignment problem consistent with the objective of Fix- it Shoparrow_forwardYou are the project manager for a construction project (maybe capstone design) and you must schedule the various jobs which must be completed before the project is finished. Some of the jobs can begin immediately but other jobs can only begin after others are completed. For example, grading can begin immediately but laying a foundation must be delayed until the grading is completed. The data below are for a project which includes ten jobs; the time it takes to complete each job is known and the set of jobs which must be completed before each job can begin is known. Your objective is to find a schedule (i.e. beginning times and ending times) for all of the jobs such that no jobs begins before any of its predecessors are completed and the time when all jobs are finished is minimized. Formulate a linear programming model to solve the problem. For the following problem, formulate the Linear program or LP as follows: 1) Define the decision variables and briefly explain the significance of…arrow_forward
- A company makes four products that have the following characteristics: Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 of materials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for $135 but needs $105 of materials to produce. The processing requirements for each product on each of the four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardless of how much the worker is used. Answer the following…arrow_forwardCarpetPlus sells and installs floor covering for commercial buildings. Brad Sweeney, CarpetPlus account executive, was just awarded the contract for five jobs. Brad must now assign a CarpetPlus installation crew to each of the five jobs. Because the commission Brad will earn depends on the profit CarpetPlus makes, Brad would like to determine an assignment that will minimize total installation costs. Currently, five installation crews are available for assignment. Each crew is identified by a color code, which aids in tracking of job progress on a large white board. Use the Hungarian method to solve the problem. The following table shows the costs (in hundreds of dollars) for each crew to complete each of the five jobs: JOB 1 2 3 4 CREW RED 30 44 38 47 31 WHITE 25 32 45 44 25 BLUE 23 37 29 29 00 GREEN 26 38 40 28 BROWN 30 34 44 43 28arrow_forwardDeluxe River Cruises operates a fleet of river vessels. The fleet has two types of vessels: a type A, x, vessel has 60 deluxe cabins and 160 standard cabins, whereas a type B vessel, y, has 80 deluxe cabins and 120 standard cabins. Under a charter agreement with the Odyssey Travel Agency, Deluxe River Cruises is to provide Odyssey with a minimum of 360 deluxe and 680 standard cabins for their 15-day cruise in May. It costs $44,000 to operate a type A vessel and $54,000 to operate a type B vessel for that period. (a) How many of each type of vessel should be used to keep the operating costs C to a minimum? The minimum is C = ______at (x, y) =(_____). (b) Suppose C = cx + 54,000y. Find the range of values that the cost of operating a type A vessel, the coefficient c of x, can assume without changing the optimal solution. _____≤ c ≤_____ (c) Find the range of values that Requirement 1 for deluxe cabins can assume. (Requirement 1 pertains to the deluxe cabin requirement.)_____ ≤…arrow_forward
- money borrowed for personal reasons; to be repaid within a specific time frame and with added interest money borrowed for the purchase of real estate; to be repaid within a specific time frame and with added interest money borrowed for business reasons; to be repaid within a specific time frame and with added interest money borrowed for the purchase of a vehicle; to be repaid within a specific time frame and with added interest : Business Loan :: Auto Loan :: Mortgage Loan :: Personal Loan 1 4 6. 8. 9. Finish Siarrow_forwardPlease answer question completely and explain your answerarrow_forwardAt a manufacturing assembly line, 30 jobs arrive perhour. Each job must pass through two production stages:stage 1 and stage 2. Stage 1 takes an average of 1 minute tocomplete, and 1 worker is available to perform stage 1.After completing stage 1, the job immediately passes tostage 2. Stage 2 takes an average of 2 minutes to complete,and 2 workers are available to work on stage 2. Aftercompleting stage 2, each job is inspected. Inspection takesan average of 3 minutes, and 3 workers are available toperform inspection. After inspection, 10% of the jobs mustbe returned to stage 1, and they then repeat both stages 1and 2. After inspection, 20% of all jobs return to stage 2 andrepeat stage 2. Assume that interarrival times and servicetimes are exponential.a What is the average time a job spends in the systemfrom arrival to completion?b What percentage of the time is each worker busy?arrow_forward
- A company makes four products that have the following characteristics:Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 ofmaterials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for$135 but needs $105 of materials to produce. The processing requirements for each product on each ofthe four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setuptime when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In thequestions that follow, the traditional method refers to maximizing the contribution margin per unit foreach product, and the bottleneck method refers to maximizing the contribution margin per minute at thebottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardlessof how much the worker is used. Using the bottleneck method,…arrow_forwardA company makes four products that have the following characteristics:Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 ofmaterials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for$135 but needs $105 of materials to produce. The processing requirements for each product on each ofthe four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setuptime when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In thequestions that follow, the traditional method refers to maximizing the contribution margin per unit foreach product, and the bottleneck method refers to maximizing the contribution margin per minute at thebottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardlessof how much the worker is used. Question: 1. Which Process…arrow_forwardA company makes four products that have the following characteristics:Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 ofmaterials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for$135 but needs $105 of materials to produce. The processing requirements for each product on each ofthe four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setuptime when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In thequestions that follow, the traditional method refers to maximizing the contribution margin per unit foreach product, and the bottleneck method refers to maximizing the contribution margin per minute at thebottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardlessof how much the worker is used. Using the traditional…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,