Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 5, Problem 66P
a)
Summary Introduction
To determine: The way to minimize the cost associated with assigning the fire engines.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be unfeasible solution.
b)
Summary Introduction
To determine: Whether the formulation in part a is still if the fire 1’s cost is 4t11+6t12.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints then it is said to be unfeasible solution.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A call center employs 1,425 agents. Every month 57 employees leave the company and 57 new employees are hired.
a. How long on average does an agent work for this call center (in months)
Suppose the cost of hiring and training a new agent is $1,140. The manager of this call center believes that increasing agents’ salaries would keep them working longer at the company. The manager wants to increase the average time that an agent works for the call center to 36 months, or three years.
b-1. Given the current average working time for agents at this call center, determine the current annual cost for hiring and training.
b-2. Assuming the average time that an agent works for the call center is increased to 36 months, determine the new annual cost for hiring and training.
b-3. If the time an agent works for the call center is increased to 36 months on average, how much could the company save on hiring and training costs over a year?
Consider the interval of random numbers presented below. The following random numbers have been generated: 99, 98, 26, 09, 49, 52, 33, 89, 21, 37. Simulate 10 hours of arrivals at this gas station. What is the average number of arrivals during this period?
A large building may require an automated alarm system which monitors and controls all fire and security alarms in the building. Normally, the building is divided into zones and a number of alarms are associated with each zone. Alarms alert a central manned control area who may pass these on to the emergency services or may respond personally.Factors which have to be taken into account in building such a system are:Ø If the control area is unmanned and an alarm is activated this alarm should not be ignored if it is potentially serious. Emergency services should be automatically called.Ø Some but not all parts of the building may be equipped with sprinkler systems or systems to shut down electrical equipment. These should be activated if a fire alarm is confirmed. They should not be activated if there are people in the same room.Ø The building may be equipped with direction indicators which illuminate the route to the nearest exit. These should be activated when a fire alarm is…
Chapter 5 Solutions
Practical Management Science
Ch. 5.2 - Prob. 1PCh. 5.2 - Prob. 2PCh. 5.2 - Prob. 3PCh. 5.2 - Prob. 4PCh. 5.2 - Prob. 5PCh. 5.2 - Prob. 6PCh. 5.2 - Prob. 7PCh. 5.2 - Prob. 8PCh. 5.2 - Prob. 9PCh. 5.3 - Prob. 10P
Ch. 5.3 - Prob. 11PCh. 5.3 - Prob. 12PCh. 5.3 - Prob. 13PCh. 5.3 - Prob. 14PCh. 5.3 - Prob. 15PCh. 5.3 - Prob. 16PCh. 5.3 - Prob. 17PCh. 5.3 - Prob. 18PCh. 5.4 - Prob. 19PCh. 5.4 - Prob. 20PCh. 5.4 - Prob. 21PCh. 5.4 - Prob. 22PCh. 5.4 - Prob. 23PCh. 5.4 - Prob. 24PCh. 5.4 - Prob. 25PCh. 5.4 - Prob. 26PCh. 5.4 - Prob. 27PCh. 5.4 - Prob. 28PCh. 5.4 - Prob. 29PCh. 5.5 - Prob. 30PCh. 5.5 - Prob. 31PCh. 5.5 - Prob. 32PCh. 5.5 - Prob. 33PCh. 5.5 - Prob. 34PCh. 5.5 - Prob. 35PCh. 5.5 - Prob. 36PCh. 5.5 - Prob. 37PCh. 5.5 - Prob. 38PCh. 5 - Prob. 42PCh. 5 - Prob. 43PCh. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - Prob. 53PCh. 5 - Prob. 54PCh. 5 - Prob. 55PCh. 5 - Prob. 56PCh. 5 - Prob. 57PCh. 5 - Prob. 58PCh. 5 - Prob. 59PCh. 5 - Prob. 60PCh. 5 - Prob. 61PCh. 5 - Prob. 62PCh. 5 - Prob. 63PCh. 5 - Prob. 64PCh. 5 - Prob. 65PCh. 5 - Prob. 66PCh. 5 - Prob. 67PCh. 5 - Prob. 68PCh. 5 - Prob. 69PCh. 5 - Prob. 70PCh. 5 - Prob. 71PCh. 5 - Prob. 72PCh. 5 - Prob. 73PCh. 5 - Prob. 74PCh. 5 - Prob. 75PCh. 5 - Prob. 76PCh. 5 - Prob. 77PCh. 5 - Prob. 80PCh. 5 - Prob. 81PCh. 5 - Prob. 82PCh. 5 - Prob. 83PCh. 5 - Prob. 85PCh. 5 - Prob. 86PCh. 5 - Prob. 87PCh. 5 - Prob. 1C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The Decision Sciences Department is tyring to determine whether to rent a slow or fast copier. The department believes that an employee's time is worth $15/hour. The slow copier rents for $4/hr, and it takes an employee an average of 10 minutes to complete copying. The fast copier rents for $15/hr, and it takes an employee an average of 6 minutes to complete copying. On average, four employees per hour need to use the copying machine. (Assume the copying times and interarrival times to the copying machine are exponentially distributed.) Which machine should the department rent to minimize expected total cost per hour? Please note this class revolves around Microsoft Excel so the answer I need needs to show the formulas in Excel, along with any corresponding graphs, etc. Thank you in advance!arrow_forwardDuring an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.arrow_forwardConsider a bank with two tellers. Service times by each teller are exponentially distributed withmean of 1 hour per customer. Customers also arrive with an exponential interarrival times withmean of 1 hour. Suppose a customer has just arrived at 2pm:a. What is the probability that the next customer will arrive between 3:00 pm and 4:00 pm?b. If no customer arrives before 4:00 pm, what is the probability that the next customer willarrive between 4:00 pm and 5:00 pm?c. What is the probability that the number of arrivals between 2:00 pm and 4:00 pm will be morethan one?arrow_forward
- A supermarket has just added a new cash register to reduce the waiting times of the customers during weekends. Since a new cash register is added, the customers expect that their waiting time will be less than the waiting time before the cash register was added. Suppose the sample variance of the waiting times for 25 customers before adding the new cash register is sĩ = 4.8 minutes, while the sample variance of the waiting times for 25 customers after adding the cash register is sź = 2.2 minutes. The manager of the supermarket believes that the waiting times are normally distributed and that the two samples are drawn independently. What is the conclusion? Given that all other criteria are satisfied, should the supermarket continue with the new cash register?arrow_forwardA telephone-order sales company must determine how many telephone operators are needed to staff the phones during the 9-to-5 shift. It is estimated that an average of 480 calls are received during this time period and that the average call lasts for six minutes. There is no queueing. If a customer calls and all operators are busy, this customer receives a busy signal and must hang up. If the company wants to have at most one chance in 100 of a caller receiving a busy signal, how many operators should be hired for the 9-to-5 shift? Base your answer on an appropriate simulation. Does it matter whether the service times are exponentially distributed or gamma distributed? Experiment to find out.arrow_forwardA group of students organizes a bake sale in which they sell hundreds of cookies at$1 per piece. They set up a table on campus and wait for students to come and purchasetheir cookies. Consider the following variables in this bake sale operation:1. Size of the cookies2. Weather conditions on campus3. Organization of the table4. Number of cookies sold5. Competition from other fund-raisers coinciding on campus6. Amount of advertising and shouting of the students at the bake sale table7. Number of students on campus that dayWhich of these variables are input variables?a. 1 and 2b. 1 and 3c. 1, 3, and 5d. 1, 3, and 6arrow_forward
- Car arrivals at a gas station follow a Poisson distribution with a mean of λ=6 and the length of service is exponential with a mean of 1/3. How many gasoline pumps must be placed so that the probability that the number of customers at the station equals or exceeds the number of pumps is at most 0.2?arrow_forwardA college student works in both the school cafeteria and library. She works no more than 12 hours per week at the cafeteria, and no more than 16 hours per week at the library. She must work at least 20 hours each week. Write a system of inequalities that describes all the given conditions. Write a system of inequalities letting x= number of hours worked at the cafeteria per week and y = number of hours worked at the library per week. x+yz x≤ ysarrow_forwardThe time between arrivals of buses follows anexponential distribution, with a mean of 60 minutes.a What is the probability that exactly four buses willarrive during the next 2 hours?b That at least two buses will arrive during the next 2hours?c That no buses will arrive during the next 2 hours? d A bus has just arrived. What is the probability thatit will be between 30 and 90 minutes before the next busarrives?arrow_forward
- Mark Sumansky owns and manages the Grass, Unlimited, Lawn-care service in Middleton. His customers include individual homeowners and businesses that subscribe to his service for lawn care beginning in the spring and ending in the fall with leaf raking and disposal. Thus, when he begins his service in April he generally has a full list of customers and does not take on additional customers any time after the first of June, it is difficult to find new customers, since most people make lawn service arrangements forth the entire summer. Mark employs five crews, with three to five workers each, to cut grass during the spring and summer months. A crew normally works 10-hour days and can average cutting about 25 normal-size lawns of less than a half-acre each day. A crew will normally have one heavy-duty, wide-cut riding mower, a regular power mower, and trimming equipment. When a crew descends on a lawn, the normal procedure is for one person to mow the main part of the lawn with the riding…arrow_forwardBased on Kolesar et al. (1974), Metropolis PD Precinct 88 must determine the minimum number of police cars required to meet its needs for the next 24 hours. An average call for service requires 30minutes. The number of calls the police department expects to receive during each hour is shown in the file P12_61.xlsx. The Metropolis PD standard of service is that there should be a 90% chance that a car is avail-able to respond to a call. For each of the following,discuss how you might find a solution.a. Suppose that patrol officer teams assigned to a car work an 8-hour shift beginning at 12 a.m., 8 a.m., or 4 p.m. Officers get an hour off for a meal. This hour can be anytime between the second and fifthhour of their shift. The precinct wants to know how many teams are needed to meet daily demand.b. Suppose that patrol officer teams assigned to a car begin their 8-hour shifts at 12 a.m., 8 a.m., 12 p.m., 4 p.m., and 8 p.m. An hour off for meals may be taken anytime during a shift. The…arrow_forwardSuppose on a road trip to Texas you observe that three out of every four trucks on the road are followed by a car, while only one out of every five cars is followed by a truck. What fraction of vehicles on the road are trucks?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,