Production scheduling At one of its factories, a manufacturer of college logo sweatshirts makes two styles: crewneck pullover and hooded. Each pullover sweatshirt takes 5 minutes to cut out and 20 minutes to assemble and finish. Each hooded sweatshirt takes 5 minutes to cut out and 30 minutes to assemble and finish. The plant has enough workers to provide at most 3750 minutes per day for cutting and at most 19,500 minutes per day for assembly and finishing. The profit on each pullover sweatshirt is $8 and on each hooded sweatshirt is $10. How many of each sweatshirt type should be produced each day to obtain maximum profit? Find the maximum daily profit.
Trending nowThis is a popular solution!
Chapter 4 Solutions
Mathematical Applications for the Management, Life, and Social Sciences
Additional Math Textbook Solutions
Mathematics with Applications In the Management, Natural, and Social Sciences (12th Edition)
The Heart of Mathematics: An Invitation to Effective Thinking
Using & Understanding Mathematics: A Quantitative Reasoning Approach (7th Edition)
A Survey of Mathematics with Applications (10th Edition) - Standalone book
Calculus for Business, Economics, Life Sciences, and Social Sciences (13th Edition)
Probability and Statistics for Engineers and Scientists
- At the Pizza Dude restaurant, a 12-in. pizza costs 5.40 to make, and the manager wants to make at least 4.80 from the sale of each pizza. If the pizza will be sold by the slice and each pizza is cut into 6 pieces, what is the minimum charge per slice?arrow_forwardIf during the following year it is predicted that each comedy skit will generate 30 thousand and each musical number 20 thousand, find the maximum income for the year. A television program director must schedule comedy skits and musical numbers for prime-time variety shows. Each comedy skit requires 2 hours of rehearsal time, costs 3000, and brings in 20,000 from the shows sponsors. Each musical number requires 1 hour of rehearsal time, costs 6000, and generates 12,000. If 250 hours are available for rehearsal and 600,000 is budgeted for comedy and music, how many segments of each type should be produced to maximize income? Find the maximum income.arrow_forwardFlint lab produces 4 high tech product types. Each of the products must be wired, drilled, assembled and checked for quality standard before being delivered to consumers. The time requirement and profit for each product are as follows. Product A: 0.5 hr for wiring, 3 hrs for drilling, 1 hr for assembling, and 0.5 hr for inspection. One product A can be sold for $10 per unit. Product B: 1.5 hr for wiring, 1 hrs for drilling, 3 hrs for assembling, and 1 hr for inspection. One product B can be sold for $13 per unit. Product C: 1.5 hr for wiring, 2 hrs for drilling, 3 hrs for assembling, and 0.5 hr for inspection. One product C can be sold for $16 per unit. Product D: 1 hr for wiring, 3 hrs for drilling, 2 hrs for assembling, and 0.5 hr for inspection. One product D can be sold for $12 per unit. The maximum capacity for wiring, drilling, assembly, and inspection are 1500 hrs; 2350 hrs; 2600 hrs; and 1200 hrs respectively. Flint lab requires that there will be at least 150 units of A, 100…arrow_forward
- A company produces two types of tables, Round and Square. It takes 2 hours to produce the parts of one unit of Round, 1 hour to assemble and 2 hours to polish. It takes 4 hours to produce the parts of one unit of Square, 2.5 hour to assemble and 1.5 hours to polish. Per month, 7000 hours are available for producing the parts, 4000 hours for assembling the parts and 5500 hours for polishing the tables. The profit per unit of Round is $90 and per unit of Square is $110. Due to an old contract with a supplier, the number of Round tables must be less than 40% the number of Square tables. How many of each type of tables should be produced in order to maximize the total monthly profit? Solve using MS Excel Solver, and round you answer to the nearest whole number.arrow_forwardA small publishing company is releasing a new book. The production costs will include a one-time fixed cost for editing and an additional cost for each book printed.arrow_forwardSweet-Fit jeans has a factory that makes two styles of jeans; Super-Fit and Super-Hug. Each pair of Super- Fit takes 12 minutes to cut and 30 minutes to sew and finish. Each pair of Super-Hug takes 12 minutes to cut and 40 minutes to sew and finish. The plant has enough workers to provide at most 12,599 minutes per day for cutting and at most 37,999 minutes per day for sewing and finishing. The profit on each pair of Super-Fit is $6.00 and the profit on each pair of Super-Hug is $7.00. How many pairs of each style should be produced per day to obtain maximum profit? Find the maximum daily profit. (Use x for Super-Fit and y for Super-Hug.) Maximize P = < 12,599 ≤37,999 Maximum profit is $ subject to Enter the solution to the simplex matrix below. If there is no solution enter 'DNE' in the boxes below. If more than one solution exists, enter only one of the multiple solutions below. If needed round jeans to 1 decimal place and profit to 2 decimal places. Number of Super-Fit jeans to…arrow_forward
- Because of new federal regulations on pollution, a chemical plant introduced a new, more expensive process to supplement or replace an older process used in the production of a particular chemical. The older process emitted 40 grams of sulfur dioxide and 120 grams of particulate matter into the atmosphere for each gallon of chemical produced. The new process emits 5 grams of sulfur dioxide and 40 grams of particulate matter for each gallon produced. The company makes a profit of 80¢ per gallon and 20¢ per gallon on the old and new processes, respectively. Answer parts (A) through (C) below. (A) If the government allows the plant to emit no more than 36,000 grams of sulfur dioxide and 90,000 grams of particulate matter daily, how many gallons of the chemical should be produced by each process to maximize daily profit? Wha is the maximum daily profit? Summarize the model, Maximize Objective function subject to V 36,000 Sulfur dioxide constraint V 90,000 Particulate constraint х, у 2…arrow_forwardA Toot can be made in 30 minutes and has a feather attached to it. A Wheet requires 15 minutes, has two feathers, and is sprinkled with 0.5 oz of sequin powder. A Honk requires 30 minutes, has three feathers, and one oz. of sequin powder. The net profit is $0.40 per Toot, $0.50 per Wheet, and $0.80 per Honk. The following resources are available: 4800 minutes of labor, 360 feathers, and 90 oz. of sequin powder. Determine the quantity of each type of noisemaker that maximizes profit.arrow_forwardTh have $150,000 available to purchase additional equipment and 250 square feet of floor space to install the new equipment. They can purchase a lathe, a press, a grinder, a metal bender, a shearing table, or some combination of the above. The company can only purchase one of each item, but they Manufacturing Company is looking to expand their production capabilities. They may purchase as many of items as they can afford. The cost and square footage for each machine is detailed in the table below. Name Cost Square Footage Lathe (x1) $45,000 50 sq ft Press (x2) $65,000 80 sq ft Grinder (x3) $30,000 120 sq ft Metal Bender (x4) $75,000 70 sq ft Shearing Table (x5) $15,000 80 sq ft The company estimates they can generate a profit each day from each piece of equipment of $800 from the lathe, $600 from the press, $1,400 from the grinder, $1.200 from the metal bender, and $400 from the shearing table. Unfortunately, the manufacturing company only has the safety permit to install the lathe or…arrow_forward
- A tool company has a uniform annual demand for 9,000 premium chainsaws. It costs $5 to store a chainsaw for a year and $2,500 to set up the plant for manufacture of the premium model. How many chainsaws should be manufactured in each production run in order to minimize the total storage and setup costsarrow_forwardCharot Polar Products makes downhill and crosscountry skis. A pair of downhill skis requires 2 man-hours for cutting, 1 man-hour for shaping and 3 man-hours for finishing while a pair of crosscountry skis requires 2 man-hours for cutting, 2 man-hours for shaping and 1 man-hour for finishing. Each day the company has available 140 man-hours for cutting, 120 man-hours for shaping and 150 man-hours for finishing. How many pairs of each type of ski should the company manufacture each day in order to maximize profit if a pair of downhill skis yields a profit of Php 10 and a pair of cross-country skis yields a profit of Php 8?arrow_forward
- Algebra for College StudentsAlgebraISBN:9781285195780Author:Jerome E. Kaufmann, Karen L. SchwittersPublisher:Cengage LearningCalculus For The Life SciencesCalculusISBN:9780321964038Author:GREENWELL, Raymond N., RITCHEY, Nathan P., Lial, Margaret L.Publisher:Pearson Addison Wesley,Algebra & Trigonometry with Analytic GeometryAlgebraISBN:9781133382119Author:SwokowskiPublisher:Cengage
- College Algebra (MindTap Course List)AlgebraISBN:9781305652231Author:R. David Gustafson, Jeff HughesPublisher:Cengage LearningElementary Geometry For College Students, 7eGeometryISBN:9781337614085Author:Alexander, Daniel C.; Koeberlein, Geralyn M.Publisher:Cengage,