Before installing a gauge on the high-pressure side of a system, you should do which of the following?
A. Turn on the system.
B. Turn off the system.
C. Adjust the system to a neutral position.
D. Have a cylinder approved by the DOT nearby.
The work should be done before installing a gauge on the high-pressure side of a system.
Answer to Problem 1RQ
The work should be done before installing a gauge on the high-pressure side of a system is turn off the system.
Explanation of Solution
The pressure gauge is an instrument used to measure the gauge pressure of the flow of fluid. It displays high and low pressure side of the system when it is put in operation. This used to convert the pressure of the system different refrigerant requirements.
The technician should be skilled to attach the manifold gauge. Attaching the gauge to the manifold should be done very carefully. Wearing goggles and gloves are necessary while attaching the gauge otherwise the high-pressurised refrigerant can injure to eyes and skin of technician.
This type of dangerous condition can be prevented by letting the pressure of high-pressure side refrigerant down to lower pressure. To reduce the pressure to lower pressure, the system should be turned off.
Conclusion:
Hence, the work should be done before installing a gauge on the high-pressure side of a system is turn off the system.
Want to see more full solutions like this?
Chapter 41 Solutions
Refrigeration and Air Conditioning Technology (MindTap Course List)
- When servicing an oil burner, a service technician must have a ______gauge and a _____ gauge.arrow_forwardChoose True or Falsearrow_forward1-While refilling an 8-quart (7.57 L) system with coolant: Technician A initially puts in 4 quarts (3.78 L) of straight coolant and tops it off with water. Technician B fills the system with the correct mixture, tightens the radiator cap, and then checks for leaks. Who is correct? 2-While checking for conditions that might cause coolant electrolysis: Technician A places the positive lead of a voltmeter into the coolant and connects the negative lead to a ground. Technician B checks for the presence of voltage in the coolant with the ignition off. Who is correct? 3-Technician A says that if the PCV valve or connecting hoses become clogged, excessive pressure will develop in the crankcase and can cause oil leaks. Technician B says that if the PCV valve or connecting hoses become clogged, oil may be pushed into the air cleaner or cause it to be drawn into the intake manifold. Who is correct? 4-While bleeding air from a cooling system: Technician A loosens a heater hose at its highest…arrow_forward
- Give an example of Reducing the Air Pressure Setting.arrow_forwardFor a hydraulic power unit, this part indicates the amount of oil in the reservoir. Usually, it also indicates the temperature. a. liquid level gauge b. filler/breather c. pressure gauge d. suction strainerarrow_forwardWhy does the high-pressure gauge on a regulator not always indicate the amount of gas in the cylinder?arrow_forward
- 2. How does fluid flow to the reservoir when the directional control valve is in the center position? dings between Gauge 2 and Gauge 3arrow_forwardQ#5: Distinguish between gauge pressure and vacuum pressure.arrow_forwardWhich of the following is called vaccum pressure? a. Pressure below the absolute pressure b. Pressure equal to atmospheric pressure c. Pressure above the atmospheric pressure d. Pressure below the gauge pressurearrow_forward
- Refrigeration and Air Conditioning Technology (Mi...Mechanical EngineeringISBN:9781305578296Author:John Tomczyk, Eugene Silberstein, Bill Whitman, Bill JohnsonPublisher:Cengage LearningAutomotive Technology: A Systems Approach (MindTa...Mechanical EngineeringISBN:9781133612315Author:Jack Erjavec, Rob ThompsonPublisher:Cengage LearningWelding: Principles and Applications (MindTap Cou...Mechanical EngineeringISBN:9781305494695Author:Larry JeffusPublisher:Cengage Learning