a)
To determine: The cost of direct labor for the bicycle.
a)
Explanation of Solution
Given information:
Identification of bottleneck:
Worker 1 performs Step 1 and Step 2 with a total time of 50 seconds.
Worker 2 performs Step 3 and Step 4 with a total time of 60 seconds.
Worker 3 performs Step 5 with a time of 50 seconds.
Worker 4 performs Step 6 with a time of 45 seconds.
Worker 5 performs Step 7 with a time of 40 seconds.
Therefore, the bottleneck is Worker 2 with 60 seconds.
Calculation of cost of direct labor for the bicycle:
The cost of direct labor per bicycle is $1.25.
b)
To determine: The profit per hour of the company.
b)
Explanation of Solution
Given information:
Calculation of profit per hour:
The bottleneck time is 60 seconds. Therefore, 60 units are produced every hour. Therefore, the flow rate is 60 units per hour.
The profit per hour is $25.
c)
To determine: The profit per hour of the company if the sourcing cost is 10% cheaper.
c)
Explanation of Solution
Given information:
Calculation of profit per hour:
The bottleneck time is 60 seconds. Therefore, 60 units are produced every hour. Therefore, the flow rate is 60 units per hour.
The profit per hour is $31.
d)
To determine: The profit per hour of the company if the fixed cost is 10% less.
d)
Explanation of Solution
Given information:
Calculation of profit per hour:
The bottleneck time is 60 seconds. Therefore, 60 units are produced every hour. Therefore, the flow rate is 60 units per hour.
The profit per hour is $45.
e)
To determine: The profit per hour of the company if the bottleneck time is reduced by 5 seconds per unit.
e)
Explanation of Solution
Given information:
Calculation of profit per hour:
The bottleneck time is 55 seconds. Therefore, the flow rate is:
The profit per hour is $52.25.
Want to see more full solutions like this?
Chapter 4 Solutions
OPERATION MANAGEMENT
- Rocky’s Pre-Cast Shop is considering two different processes for completing Pre-Cast jobs. Process A uses one person to setup the job and do the pre-casting. If this approach is used, an experienced person can complete an average of 20 jobs per day. Process B uses two people. One person does the setup and the second person does the actual pre-casting. Setup on one job can be done while pre-casting is being completed on another but pre-casting must be completed on a job before the pre-cast machine can start processing the next. After some practice, this second process can be completed with a standard time of 10 minutes for setup and 15 minutes for actual pre-casting. In either case, assume an 8-hour day, 5 days per week, 250 days per year. 3. Assuming ideal conditions, what is the maximum capacity of process B? 4. How long would it take to process 200 jobs using process A (assume only one worker and one machine)? 5. If Rocky’s is primarily…arrow_forwardThe first day of basic training at the Air Force Academy is quite a sight, with 1500 cadets being processed in. This involves getting haircuts, uniforms, room assignments, and a mountain of paperwork. At the Uniform Fitting station, the worker takes the measurements on the cadet (which takes about 2 minutes), then retrieves shirts, pants and hats in his/her size (which takes about 2 minutes), waits for the cadet to try on the pants (which takes about 1 minute) and then marks the pants for hemming (which takes about 1 minute). The in-processing takes place from 8 AM to 5 PM with an hour off for lunch (8 hours). __________2a. How many cadets can a single worker fit for uniforms on that hectic day? __________2b. How many workers would be needed to fit 1601 cadets in one day, if everyone works at full capacity?arrow_forwardConsider a four-step serial process with processing times given in the list below. There is one machine at each step of the process, and this is a machine-paced process. Step 1: 15 minutes per unit Step 2: 23 minutes per unit Step 3: 23 minutes per unit Step 4: 27 minutes per unit Assuming that the process starts out empty, how long will it take (in hours) to complete a batch of 123 units? (Do not round intermediate calculations. Round your answer to nearest hour) hoursarrow_forward
- Atlas Inc. is a toy bicycle manufacturing company producing a five-inch small versionof the bike that Lance Armstrong rode to win his first Tour de France. The assemblyline at Atlas Inc. consists of seven work stations, each performing a single step. Stationsand processing times are summarized here:• Step 1 (30 sec.): The plastic tube for the frame is cut to size.• Step 2 (20 sec.): The tube is put together.• Step 3 (35 sec.): The frame is glued together.• Step 4 (25 sec.): The frame is cleaned.• Step 5 (30 sec.): Paint is sprayed onto the frame.• Step 6 (45 sec.): Wheels are assembled.• Step 7 (40 sec.): All other parts are assembled to the frame.Under the current process layout, workers are allocated to the stations as shown here:• Worker 1: Steps 1 and 2• Worker 2: Steps 3 and 4• Worker 3: Step 5• Worker 4: Step 6• Worker 5: Step 7Assume the workers are paid $15 per hour. Each bicycle is sold for $6 and includesparts that are sourced for $1. The company has fixed costs of $200 per…arrow_forward4. Citizens of a country send documents to renew their passport. The average time in the mail is about 2 days. It takes 4 days before a clerk process them for 10 minutes and pass it to the next clerk. Second clerk spends 10 minutes and transit the document for final process which takes around 4 days on average. The document is printed which takes 2 minutes. What is the value-added time in this flow? A) 0.0015 B). 0.10 C). 015 D) 0.009arrow_forwardSmartphones are made on a 40-step assembly process. All 40 steps are connectedthrough a conveyor belt and all of the 40 steps must work at the same rate even if someof them have more capacity than others. Is this process a machine-paced process or aworker-paced process?a. Machine-pacedb. Worker-pacedarrow_forward
- Consider a four-step serial process with processing times given in the following list. There is one machine at each step of the process, and this is a machine-paced process. Step 1: 16 minutes per unit Step 2: 15 minutes per unit Step 3: 22 minutes per unit Step 4: 12 minutes per unit Assuming that the process starts out empty, how long will it take (in hours) to complete a batch of 98 units?arrow_forwardA Jack-in-the-box toy includes two components, the jester (part A) and the box (part B). The following flowchart demonstrates its manufacturing process. Production of Part A A.1 A.2 C.1 C.2 B.1 B.2 В.3 Production of Part B Final assembly It takes two steps, A.1 and A.2, to make part A, performed by two dedicated workstations, respectively: A.1 has a process time of 3 minutes; A.2 has a process time of 8 minutes. It takes three steps, B.1, B.2, and B.3, to make part B, performed by three dedicated operators, respectively: B.1 has a process time of 5 minutes; R2 hac a nrocece timo of 8 minutoearrow_forwardThe process of making a batch of paint in a paint factory consists of the following steps: First, the correct amount of raw materials must be mixed in the proper sequence. The operator must follow specified safety instructions. After mixing, a sample is drawn and taken to a laboratory, where it is tested to ensure conformance to customer requirements a and specifications. Next, the mixing tank is taken to a filling station and verified to be the correct one prior to filling individual cans of paint. The filled cans go to the packing department where labels are printed and applied to the cans. They are inspected to ensure that the labels are correct and the proper quantity was produced for the customers’ order. The cans are packed in boxes and moved to shipping. a. Develop a flowchart that maps out this process. b. Enrich the flowchart by adding detailed steps which may not have been described in detail. c. Determine if any opportunities exist for improving this process using…arrow_forward
- Heizer and Render advises that when analyzing and designing processes to transform resources into goods, the followingquestions should be asked:- Is the process designed to achieve competitive advantage in terms of differentiation, response or low cost?- Does the process eliminate steps that do not add value?- Does the process maximize customer value as perceived by the customer?- Will the process win orders?A Time-Function Map is similar to a flow process chart, but with time added to the horizontal axis. With time-function mapping,notes indicate the activities and arrows indicate the flow direction, with time on the horizontal axis.arrow_forward(a) T. Smunt Manufacturing Corp. has the process displayed below. The drilling operation occurs separately from and simultaneously with the sawing and sanding operations. The product only needs to go through one of the three assembly operations (the assembly operations are "parallel"). ASSEMBLY SAWING SANDING 78 min/unit 15 min/unit 15 min/unit WELDING ASSEMBLY DRILLING 25 min/unit 78 min/unit 27 min/unit ASSEMBLY 78 min/unit 1. Which operation is the bottleneck? 2. What is the throughput time for the overall system? 3. If the firm operates 8 hours per day, 22 days per month, what is the monthly capacity of the manufacturing process? 4. Suppose that a second drilling machine is added, and it takes the same time as the original frilling machine. What is the new bottleneck time of the system? 5. Suppose that a second drilling machine is added, and it takes the same time as the original drilling machine. What is the new throughput time?arrow_forwardA process of making chair is described as follows: Stage 1 Seat and back attached Stage 2 Legs attached The production speeds are 15 chairs per hour for Stage 1 and 30 chairs per hour for stage 2. The cycle time of the process is ______minutes. The flow time of the process is ______ minutes.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.