Which of the following actions does not relate to off-loading the bottleneck?

  1. a. Reassigning activities to other, nonbottleneck resources
  2. b. Automating some of the activities at the bottleneck
  3. c. Increasing wages for production workers
  4. d. Outsourcing some of the bottleneck activities
Blurred answer
Students have asked these similar questions
O the analyst should repeat the analysis process to look for other bottlenecks. the analyst should identify bottlenecks, idle times and non value added steps O the analyst should consider making investments to improve either how the bottleneck process works or to increase its O the analyst should consider increasing the output of the bottleneck and removing any non-value adding work or inter bottleneck Question 9 Which one of the following is NOT a reason to focus on sustainability? O Investors demand it Reduce net-zero emissions by 2030 or 2050 O Gen Z demand it O Profit and productivity targets O Process control targets Question 10 Which of the following process type has the highest level of volume?
Draw a Functional Decomposition Diagram that would represent key processes of the system. Draw a Diagram 0 Data Flow Diagram of the system.
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.1 units/hr Sawing 5 units/hr Sanding Drilling 5 units/hr Welding 2.5 units/hr a) Sawing is the bottleneck. b) The bottleneck time is 28.57 minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is minutes (round your response to two decimal places). Assembly 0.8 units/hr Assembly 0.8 units/hr Assembly 0.8 units/hr

Additional Business Textbook Solutions

Find more solutions based on key concepts
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY