Principles of Foundation Engineering
Principles of Foundation Engineering
9th Edition
ISBN: 9780357684832
Author: Das
Publisher: Cengage Learning US
bartleby

Concept explainers

Question
Book Icon
Chapter 2, Problem 2.4P
To determine

Find the volume of soil removed and amount of water added to the soil from the borrow pit.

Blurred answer
Students have asked these similar questions
The soil at a borrow area is at moisture content of 8.5%and unit weight of 17.5 kN/m3. This soil is used in the construction of a compacted road base where the dry unitweight is 19.5 kN/m3 and the moisture content is 14.0%. Ifthe finished volume of the road base is 120,000 m3, whatwould be the volume of the soil removed from the borrowpit? How much water would be added to the soil from theborrow pit?
a) What are the typical permeability values for clay and sand, respectively? Discuss how the pore pressure in these soils would respond to loading, make use of schematic drawings when needed. b) A sample of silty clay is compacted into a mould 150 mm in diameter and 120 mm high. The mass of soil is 3.527 kg which reduces to 2.594 kg after drying in an oven. Calculate the bulk unit weight of the soil sample. Assuming the specific gravity of the soil grains, Gs = 2.72, calculate the degree of saturation and voids ratio of the soll. c) A site investigation is carried out in Northampton Square for a proposed five storey building. The ground is found to comprise 2 m of coarse gravel overlying London Clay. The gravel has a Gs = 2.65 and a specific volume of 1.573. The clay has a bulk unit weight = 17.9 kN/m³ and a coefficient of earth pressure, Ko= 1.1. The water table is at a depth of 2 m below the ground surface (i.e. level with the top of the London Clay strata). Calculate the vertical…
The in situ moisture content of a soil is 18% and the moist unit weight is 16.5 kN/m3.The specific gravity of soil solids is 2.75. This soil is to be excavated and transported toa construction site for use in a compacted fill. If the specifications call for the soil tobe compacted to a minimum dry unit weight of 16.27 kN/m3 at the same moisturecontent of 18%, how many cubic meters of soil from the excavation site are needed toproduce 7651 m3 of compacted fill? How many 178 kN truckloads are needed totransport the excavated soil
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning