Concept explainers
The names of the largest contractors along with their rankings reported by ENR in the categories of Heavy and highway, non-residential building, and multiunit housing. Find whether these contractors are the largest in the previous year.
Explanation of Solution
Refer to the Engineering News Record 2019.
Show the names of the largest contractors along with their rankings reported by ENR as shown in Table 1.
Contractors Name
| Rank as per ENR 2019 | Rank as per ENR 2018 |
Bechtel, Reston, Va. | 1 | 1 |
Fluor Corp., Irving, Texas | 2 | 2 |
Turner Corp., New York, N.Y. | 3 | 3 |
AECOM, Los Angeles, Calif. | 4 | 4 |
The Whiting-Turner Contracting Co., Baltimore, Md. | 5 | 8 |
Refer Table 1.
The table shows the list of the largest contractors as per Engineering News Record 2019.
Compare the rank of these contractors in the year 2019 and 2018.
The top 4 contractors maintained their position in both 2018 and 2019, whereas the contactor The Whiting-Turner Contracting Co, has shown significant growth and attained 5th rank in 2019 when compared to 8th rank in 2018.
Want to see more full solutions like this?
Chapter 1 Solutions
Construction Management, 5th Edition
- Which category of construction would typically be contracted out as design/build? a. Residential b. Building construction c. Industrial d. Heavy construction Please explain your answer Please give me right answer and give correct explanation... Thank youarrow_forwardClassify the under listed instances into the appropriate types of contracts. a. A standard form of construction contract issued by the International Federation of Consulting Engineer (FIDIC). b. A verbal promise to buy a 25-year son a car. c. A written promise to buy a 30-year-old daughter a house. The promise has been written and signed and sealed and delivered to the daughter. d. The supply by a wholesaler of 10,000 bricks to site following a telephone request from the site agent.arrow_forwardCIPR vs HIPR You are required to prepare a document discussing on the topic above. Your discussion shall include method, machinery used, cost, picture and any other relevant comparison.arrow_forward
- Pls Answer briefly. Thank you If you are the designer, how are you going to resolve disputes that may arise between the owner and the contractor.arrow_forwardWhat are the type of risks in construction industry? describe eacharrow_forwardMake a sketch of the flow chart depicting the steps in, and the cyclic nature of, a contractor’s cost accounting, cost reporting, and cost control systemarrow_forward
- Question 8 What is the contract delivery method called where the prime consultant is responsible to the contractor? E Public-private partnership E Integrated project delivery Design-build I Construction management for services Question 9 What document is requested by the owner to ensure the contractor enters into a contract? Agreement to bond Performance bond Bid bond I Certification of insurancearrow_forwardDiscuss the prequalification of Prospective Contractors.arrow_forwardIn what way a contractor will be able to benefit from a particular type of equipment he will purchase even if that type is less desirable than the proposed one and list down the importance of conducting preventive maintenance of construction equipments.arrow_forward
- A construction company has submitted bids on two separate government contracts, A and B. The company feels that it has a 60% chance of winning contract A and 30% chance of winning contract B. Given that it wins contract B, the company believes that is has 80% chance of winning В. contract A. a) What is the probability that the company will win both contracts? b) What is the probability that the company will win at least one of the two contracts? c) If the company wins contract B, what is the probability that it will NOT win contract A?arrow_forwardwhen doing a Bill of Quantity (BQ) for a tendering should all the cost of the items be included in the BQ. (I want to understand how the bill of quantity works in the tendering/ bidding process, and how it should look.arrow_forwardA client plans to construct a manufacturing plant that involves multiple engineering disciplines. Calculate the total engineering fees including taxes based on the following: Mechanical Works, $1,540,000 Electrical Works, $1,780,000 Earth Works, $950,000 Civil Works, $2,125,100 Environmental Works, $1,325,000 Basis B fees = 9% There are no office fees Taxes = 13%arrow_forward
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,