Question

Kindly give me all three right answers.. 

Please help me with all answers otherwise leave it question. 

Thank you 

What equipment would be suitable for cut and fill works that require the soil to be moved 15km off the site?
Ripper
Dozer
Compactor
O Scraper
Loader
Excavator
O Grader
Trucks
Transcribed Image Text:What equipment would be suitable for cut and fill works that require the soil to be moved 15km off the site? Ripper Dozer Compactor O Scraper Loader Excavator O Grader Trucks
Subgrade preparation include the following activities:
O In-situ subgrade compaction.
O Grading to appropriate reduced levels.
O Earthwork cut and fl.
O Placing select filling materials above in-situ subgrade.
What are the issues associated with drainage construction?
O Aculvert without headwall, wing wall or apron will have the water flowing through the embankment outside the pipe, causing erosion channels.
O Earth drain inverts will experience higher degree of erosion.
On flat section of the roads, a 0% drainage gradient is acceptable.
O Fast water flow through a culvert will cause erosion on the downstream.
Transcribed Image Text:Subgrade preparation include the following activities: O In-situ subgrade compaction. O Grading to appropriate reduced levels. O Earthwork cut and fl. O Placing select filling materials above in-situ subgrade. What are the issues associated with drainage construction? O Aculvert without headwall, wing wall or apron will have the water flowing through the embankment outside the pipe, causing erosion channels. O Earth drain inverts will experience higher degree of erosion. On flat section of the roads, a 0% drainage gradient is acceptable. O Fast water flow through a culvert will cause erosion on the downstream.
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Steel
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning