Two cylinders act right after one another. Each cylinder is metered, and some actions are slow, and there is a dwell between some actions. What is the minimum flow rate required (CFM) to operate this cylinders? (enter answer with 2 decimal places) Sequence of operations: Cyl. A extends with metering (takes 1.5 second) Dwell time for 2 seconds for part machining Cyl. B extend and retracts without metering (2 second) Dwell time for 10 seconds while an electric mixer is operated Cyl. A retracts quicky with no metering (0.5 seconds) Dwell time for 5 seconds while a part is placed before next cycle Assuming the displacements of the cylinders are: Cyl. A DE = 65 in³ Cyl. A DR = 62 in³ Cyl. B DE = 44 in³ Cyl. B DR = 41 in³ Add your answer Integer, decimal, or E notation allowed

Precision Machining Technology (MindTap Course List)
2nd Edition
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Chapter8: Computer Numerical Control
Section8.6: Cnc Milling: Programming
Problem 8RQ: Briefly describe the use of I and J for the arc center method of circular interpolation.
icon
Related questions
Question

Two cylinders act right after one another. Each cylinder is metered, and some actions are slow, and there is a dwell between some actions. What is the minimum flow rate required (CFM) to operate this cylinders? (enter answer with 2 decimal places)

Sequence of operations:

Cyl. A extends with metering (takes 1.5 second)

Dwell time for 2 seconds for part machining

Cyl. B extend and retracts without metering (2 second)

Dwell time for 10 seconds while an electric mixer is operated

Cyl. A retracts quicky with no metering (0.5 seconds)

Dwell time for 5 seconds while a part is placed before next cycle

 

Assuming the displacements of the cylinders are:

Cyl. A DE = 65 in3

Cyl. A DR = 62 in3

Cyl. B DE = 44 in3

Cyl. B DR = 41 in3

Two cylinders act right after one another. Each cylinder is metered, and some actions are slow, and
there is a dwell between some actions. What is the minimum flow rate required (CFM) to operate this
cylinders? (enter answer with 2 decimal places)
Sequence of operations:
Cyl. A extends with metering (takes 1.5 second)
Dwell time for 2 seconds for part machining
Cyl. B extend and retracts without metering (2 second)
Dwell time for 10 seconds while an electric mixer is operated
Cyl. A retracts quicky with no metering (0.5 seconds)
Dwell time for 5 seconds while a part is placed before next cycle
Assuming the displacements of the cylinders are:
Cyl. A DE = 65 in³
Cyl. A DR = 62 in³
Cyl. B DE = 44 in³
Cyl. B DR = 41 in³
Add your answer
Integer, decimal, or E notation allowed
Transcribed Image Text:Two cylinders act right after one another. Each cylinder is metered, and some actions are slow, and there is a dwell between some actions. What is the minimum flow rate required (CFM) to operate this cylinders? (enter answer with 2 decimal places) Sequence of operations: Cyl. A extends with metering (takes 1.5 second) Dwell time for 2 seconds for part machining Cyl. B extend and retracts without metering (2 second) Dwell time for 10 seconds while an electric mixer is operated Cyl. A retracts quicky with no metering (0.5 seconds) Dwell time for 5 seconds while a part is placed before next cycle Assuming the displacements of the cylinders are: Cyl. A DE = 65 in³ Cyl. A DR = 62 in³ Cyl. B DE = 44 in³ Cyl. B DR = 41 in³ Add your answer Integer, decimal, or E notation allowed
Expert Solution
steps

Step by step

Solved in 1 steps with 1 images

Blurred answer