The Total Manufacturing costs incurred for the month was $620,525. Beginning work in process was $152,000. There were $260,000 of partially finished goods remaining in work in process inventory at the end of the month. What was the cost of goods manufactured during the month?
Q: Operations Management 15.Organizational structure contributes to explaining and predicting…
A: A organisational structure refers to a structure which is created either due to fulfillment of the…
Q: In the case of a contract for sale by sample there is an implied condition of all the following…
A: Let us go option by option. A : That the goods will be free from any defect, rendering them…
Q: A project has the following activities, with specified precedents and expected durations (in hours).…
A: A network diagram is a diagram that shows the visual form of the project activities and their…
Q: Sunseel Industries produces two types of raw materials, A and B, with a production cost of $4 and $8…
A:
Q: demonstrate the benefit of using the Work Breakdown Structure (WBS) concept?
A: A graphical, hierarchical, and deliverable representation of the breakdown of a project is called a…
Q: a. Which location, A or B, should be chosen on the basis of the total weighted score? b. If the…
A: NOTE: We are allowed to do one question only at a time. Please post the rest of the questions again…
Q: The effective management of time is crucial for students success. What is the importance of…
A: Time plays a key role in the students' lives. In the context of the study and class performance,…
Q: The host of a dinner party purchases wine based on the weighted average of clarity (10%), bouquet…
A: In Weighted Average each number in the data set is multiplied by a predetermined weight arrive at…
Q: 360- degree feedback is effective way of appraising the performance of employees provided it is…
A: 360 Degree Employees receive private, anonymous feedback from their coworkers through a system or…
Q: Which of the following statements is true regarding the sensitivity analysis approach to investment…
A: Sensitivity analysis is a risk assessment techniques of capital budgeting. Sensitivity analysis is…
Q: olving quality-related problems in the organisation is as much about applying the tools and…
A: Organizational problem solving is about more than just applying the right tools and techniques. It's…
Q: (e) With a 10-minute cycle time and six workstations, what is the efficiency? () What is the total…
A: A project schedule network diagram shows the sequence of the task that are performed to complete a…
Q: QI: For the project listed below, find the following items: 1- Total project finishing time. 2-…
A: As per our guidelines, we are supposed to answer only three sub-parts if multiples sub-parts are…
Q: b) Operations Management (OM) strategy changes according to the product stage in the Product Life…
A: Product Life Cycle is the duration from introducing a product to the market till it disappears from…
Q: • Q2:Find out the completion time and the critical activities for the following project: D 20 E H 11…
A: The project network diagram is the diagram which shows the project activities and their duration to…
Q: Why is it that the Quality, Delivery, and Price expectations of the customers should be considered…
A: The clients are the end-users of your product or service, therefore it’s only right that they get to…
Q: + holding cost only) of Wheel, Tire, and Spokes based on the projected order released and inventory…
A: Given holding cost(H)=$2unit/week Setup cost(S)=$400 Total time period =8weeks Annual quantity…
Q: Explain TWO (2) example of poor material management and solution to solve of the problem.
A: Materials management is a basic element of supply chain management that involves the design and…
Q: entify two (2) strategic objectives and two (2) strategic initiatives that will assist the…
A: Firstly the four perspectives of the balanced scorecard is (1) Learning and growth perspective (2)…
Q: Students arrive randomly at the counter of the CIT Library. There is only one library assistant,…
A: Given data: Average arrival rate λ= 12 students per hour Average service rate μ = 20 students per…
Q: What is the "Business Project Development Cycle" and why is it so important to business?
A: Project management is the procedure of leading the outcome of a team to accomplish all project…
Q: Ping Sotto, an Overseas Filipino Worker, is planning to return to the Philippines. As an OFW for…
A: The process of seeking out, finding, and hiring potential candidates for a specific position or…
Q: 2. Seasonality Index table Period Year Seasonality Index (SI) 2021-period 1 2021-period 2…
A: Since the first question is incomplete we have answered the second question with the available data…
Q: A fabrication cell at Spradley's Sprockets uses the pull method to supply gears to an assembly…
A: Given: Average daily demand d 624 Average waiting time per unit w 1.6 Average processing time…
Q: STEEPLE in Watermelon Oreos
A: Watermelon cookies of Company O are a perfect summertime treat! They have a crispy cookie exterior…
Q: The manufacturer of Beats headphones by Dr. Dre decides to advertise in the "lifestyles" sections of…
A: The manufacturer of Beats headphones by Dr. Dre decides to advertise in the "lifestyles" sections of…
Q: How does revenue management impact an aggregate plan?
A: The revenue management process can be broken down into two components: aggregate planning and price…
Q: What are the relevance of communication studies to technological globalization
A: The growing speed of technology dissemination throughout the global economy is known as…
Q: Q2: The activities involved in the construction of a certain project are given in the table below.…
A: A resource bar chart is a type of bar chart where the duration is taken on the horizontal axis and…
Q: Discuss how scenario plannin conditions of uncertainty and ca
A: Scenario planning is making presumptions on the thing what's in store will be and how your business…
Q: • Q1: Determine the critical path, the critical activities and the project completion time.…
A: A network diagram is a diagram that shows project activities and their duration in visual form to…
Q: [B] Solve the transportation problem (find initial basic solution with VAM and optimal solution…
A: The transportation model is used to calculate the minimum cost of the route by selecting different…
Q: Which of the following techniques is an organization development intervention that is targeted at…
A: Organisational development intervention refers to the programs developed by the organisation to…
Q: As a System Analyst and Designer, you are expected to explain to management on the altenatives that…
A: The organization can choose to develop the software in-house or purchase the software from the…
Q: Migrant agricultural laborers are especially vulnerable because they encounter hazards in their…
A: Millions of agricultural workers - waged and self-employed - while feeding the world, routinely face…
Q: Question 9 Given the below network, what is the maximum flow from node 1 to node 6? 12 20 10 18 16…
A: Maximum flow issues in optimization theory involve finding a viable flow through a flow network that…
Q: b. Use the implied value of alpha from part a to determine the required reduction in waiting time if…
A:
Q: XYZ Corporation manufactures two products, Simple and Complex. The following annual information was…
A: Given data Total annual fixed cost = P18000 Plant capacity = 12000 hours
Q: Find the x- intercept and y- intercept of each constraints and graph.
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Q2: The activities involved in the construction of a certain project are given in the table below.…
A:
Q: What is the duration of the project? Identify the critical path. How many days can ACTIVITY C be…
A: “Since you have posted a question with multiple sub-parts, we will solve first three sub-parts for…
Q: Would a data series that contains values grouped into 10 categories be better displayed as a pie…
A: A data series is a column or row which is arranged in a chart. In the chart each and every data…
Q: A queuing model which follows the M/M/1 assumptions has λ = 2 and μ = 3. The average waiting time in…
A: Given: ARRIVAL RATE 2 SERVICE RATE 3
Q: se choose the most and least effective answers Statement Most Least Give the customer an example of…
A: Selling a service to a customer is not very easy because in today's world every customer is rational…
Q: Vogel’s Approximation Method (VAM) for initial basic feasible solution Find the optimal solution…
A: The transportation model is used to calculate the minimum cost of the route by selecting different…
Q: RJ produces chocolate balls. There are five samples, and each sample contains 4 packs of chocolate…
A: X-chart is a model of control chart which helps to identify the process controllability using mean…
Q: The annual demand for a product is 34000 units. The annual carrying cost per unit of product is 12…
A: Total annual carrying costs or total holding costs is the sum of carrying the total products in…
Q: please answer both the questions. and what is the correct answer for this ?
A:
Q: Project selection involves evaluating potential projects and deciding which of these should move…
A: Project selection is a critical step in ensuring the success of an organization. The right project…
Q: Using the below project network diagram, what is the Earliest Start (ES) time of activity G? The…
A: ES or Earliest starting time indicating the minimum possible time for starting an activity. Here, we…
The Total
process was $152,000. There were $260,000 of partially finished goods remaining in
work in process inventory at the end of the month. What was the cost of goods
manufactured during the month?
Step by step
Solved in 2 steps
- The following production data were taken from the records of the finishing department for June: Inventory in process, June 1, 25% completed 260 units Transferred to finished goods during June 5,000 units Equivalent units of production during June 5,495 units Determine the number of equivalent units of production in the June 30, finishing department inventory, assuming that the first-in, first-out method is used to cost inventories. The completion percentage of 25% applies to both direct materials and conversion costs. a.448 units b.840 units c.672 units d.560 unitsBill of material (BOM) details all the sub-component, material, and parts used to make one product. There is a dinner party at your home of a few guests, and you are managing your kitchen. Develop a BOM of any main dish (main course) of your own choice in a tree format. (Hint: Select number of people that will be served with dinner and quantity of that main course to be prepared in appropriate units). Units: tea spoon, table spoon, a cup, grams etc.Dohini Manufacturing company had following 12 months of data on purchasing cost and number of purchase orders. Required: 1. Determine the high point and low point. 2. Calculate the variable rate for purchasing cost based on the number of purchase orders. (Round to nearest cent) 3. Calculate the fixed monthly cost of purchasing.(Round to nearest dollar). 4. Write the cost formula for the purchasing activity showing the fixed cost and the variable rate. 5. If Dohini manufacturing company estimates that next month will have 430 purchase orders, what is the total estimated purchasing cost for the that month?(Round to nearest dollar) 6. What if Dohini manufacturing wants to estimate purchasing cost for the coming year and expects 5340 purchase orders? What will estimated total purchasing cost be? What is the total fixed purchasing cost? Why doesn't equal the fixed cost calculated in Requirement 3?(Round to nearest dollar)
- Bill of material (BOM) details all the sub-component, material, and parts used to make one product. There is a dinner party at your home of a few guests, and you are managing your kitchen. Develop a BOM of any main dish (main course) of your own choice in a tree format. (Hint: Select number of people that will be served with dinner and quantity of that main course to be prepared in appropriate units) Let us assume that you are managing the complete food for dinner, and the food will be served at 9:00 PM sharp. You have decided to serve one main course item, as mentioned in the previous part (a), one sweet dish of your choice, and salad. Prepare a lead-time tree for your complete project and explain the total lead-time from start preparation to serving the dinner for your guests. Secondly, what is the latest time you must start preparing your dinner?Company A recently completed and sold an order of 50 units that had the following costs: Direct materials Direct labor* (1000 hours @ P8.50) |Variable overhead (1000 hours @ P4.00) Other overhead costs** Total 1500 8500 4000 1400 15400 | *Applied on the basis of direct labor hous **Applied at the rate of 10% of variable cost The company has now been requested to prepare a bid for 150 units of the same product. If an 80% incremental unit-time learning curve is applicable, Company A's total cost on this order would be estimated atBill of material (BOM) details all the sub-component, material, and parts used to make one product. There is a dinner party at your home of a few guests, and you are managing your kitchen. a) Develop a BOM of any main dish (main course) of your own choice in a tree format. (Hint: Select number of people that will be served with dinner and quantity of that main course to be prepared in appropriate units). Units: tea spoon, table spoon, a cup, grams etc. b) Let us assume that you are managing the complete food for dinner, and the food will be served at 8:00 PM sharp. You have decided to serve one main course item, as mentioned in the previous part (a), one sweet dish of your choice, and salad. Prepare a lead-time tree for your complete project and explain the total lead-time from preparing to serving (start to complete) the dinner for your guests. Secondly, what is the latest time you must start preparing your dinner?
- Bill of material (BOM) details all the sub-component, material, and parts used to make one product. There is a dinner party at your home of a few guests, and you are managing your kitchen. a) Develop a BOM of any main dish (main course) of your own choice in a tree format. (Hint: Select number of people that will be served with dinner and quantity of that main course to be prepared in appropriate units). Units: tea spoon, table spoon, a cup, grams etc. b) Let us assume that you are managing the complete food for dinner, and the food will be served at 8:00 PM sharp. You have decided to serve one main course item, as mentioned in the previous part (a), one sweet dish of your choice, and salad. Prepare a lead-time tree for your complete project and explain the total lead-time from preparing to serving (start to complete) the dinner for your guests. Secondly, what is the latest time you must start preparing your dinner? NOTE: USE MS WORD FOR MAKING TREE CHART. COPY PASTE WORK IS…Consider the following product structure (bill of material). One hundred and fifty (150) units of Product A are needed in week 10. Assuming no on-hand inventory of A exists, explode the bill of material, and use the following information to construct a net requirements plan for all the items. You must use the template provided by the instructor and provide all the information needed on the template. There are no scheduled receipts for all the items. Item On-hand Inventory Lead time (weeks) A 0 2 B 20 2 C 10 1 D 0 3 E 5 1 F 10 3 Item: LT= 1 2 3 4 5 6 7 8 9 10 11 12 Gross Requirements Scheduled Receipts Projected on Hand Net Requirements…What are the similarities between the CPFR and S&OP processes? What are the differences?
- Two months ago Harry was asked to prepare cash budget with a very short notice. He did an excellent job and handled it before the due date. However his supervisor didn’t even notice that it was a very good job, he immediately assigned another hard job. The managers had treated Sue in the same manner last year. Now Sue has been asked to prepare a feasibility report for the new production facility that the firm was thinking of building. Although it is a hard job, Sue thinks that she will be able to prepare a very good report. However she is very unwilling to prepare it and although time is limited she hasn’t even started to prepare. Sue and Harry began to discuss their supervisors. They thought that their supervisor doesn’t care about their well-being, but he is ready whenever supervision is needed. He clarifies the tasks well, and helps the employees to solve problems related to the job but otherwise, he never interferes. On the other hand, the leader doesn’t let employees try new…“How many dozen should I put in the proofer?” asked Elizabeth, the new baker at the Sands Cafeteria. Rami El‐Hussieny was the day shift operations manager, and, unfortunately, he did not know how to answer Elizabeth's question. What she wanted to know was simple enough: How many dozen rolls should be placed in the proofer in anticipation of the night's dinner business? The problem was that the frozen dinner roll dough used at the Sands Cafeteria needed to be proof for at least 2 hours prior to being baked for 15 minutes. If too many rolls were proofed, they would never be needed, but they would still have to be baked and made into bread dressing or even tossed out. If too few dozen were proofed and the night was busier than anticipated, they would run out of “Fresh Baked Rolls” (one of the restaurant's signature items), and Rami knew that the night manager would be really upset. It was a daily guess, and sometimes Rami missed the guess! He wondered if a prebaked roll with a shelf life…As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 1 housing. Each clamp has 1 handle and 2 castings. Each housing has 1 bearing and 2 shafts. There is no inventory on hand. Part 2 a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item. Number Item I Spring Subscript left parenthesis 2 right parenthesisSpring(2) II Housing Subscript left parenthesis 1 right parenthesisHousing(1) III Casting Subscript left parenthesis 2 right parenthesisCasting(2) IV Shaft Subscript left parenthesis 2 right parenthesisShaft(2) Bracket Base(1) Clamp(1) Handle(1) Clamp(4) Bearing(1) Handle(1) Casting(2) IIIIIIIV Part 3 b) Determine the…