The cost of grading and spreading gravel on a curvy rural road is expected to be
$300,000. The road will have to be maintained at a cost of $25,000 per year. Even though
the new road is not very smooth, it allows access to an area that previously could only be
reached with off-road vehicles. The improved accessibility has led to a 150% increase in
the property values along the road. If the previous market value of the property was
$900,000, calculate the conventional B/C ratio using an interest
rate of 6% per year and a 20-year study period.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution
Trending nowThis is a popular solution!
Step by stepSolved in 2 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- site is planned to have a cinema that can accommodate 1000 persons, a medical clinic with 550 m2 of gross floor area, a bowling alley with 21 lanes and a retail store with 3,225 m2 of gross floor area. The total minimum parking space requirements as per the City of Hamilton's by-laws are ?arrow_forwardA 40km gravel surfaced road on a reasonably good alignment, is now carrying an annual average daily traffic of 100 vehicles (10% trucks). The traffic is expected to grow at an annual rate of 5% compounded (for each road type and all vehicles). The minimum attractive rate of return is 10% per annum. It is proposed to pave the road with minor reconstruction and the rest of the project details are shown in Table 1 below. Determine the benefits and costs after the year of pavingarrow_forwardLion heen construcied belweh the mainland and an island The total cost areluding tolls) to travel across the bridge is expressed as C- 50+0.5V, where Visthe ber o veh/h and C'is thc cost/veh in cents. The demand for travel across the bridue is V 2500-10C O Determine the volume of traffle across the bridge. a toll of 25 cents is added, what s the volume across the bridge? What volume Would be expected with a 50 cent increase Aelbooth is to be added, thus reducing the travel time to cross the bridge. The new nction is C- 50 + 0.2V. Determine the volume of traffic that would cross the bridge. d Determine the toll to yicld the highest revenue for demand and supply function in part (a), and the associated demand and revenue.arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning