Rosenberg's goal is to produce 170 PDAs per hour. a) The cycle time for the production of a PDA = seconds (round your response to two decimal places).
Q: Given the following data, according to MAD/MAE which is the most accurate forecasting…
A: MAD (Mean Absolute deviation) / MAE indicates the average of absolute error value. The calculation…
Q: Given 5000 minutes of resources at each Workcenter, how many units of A could be produced assuming…
A: A requires 3 units of B and 2 units of C. Where 1 unit of C requires 2 units of B.For Part A:Lot…
Q: a) The throughput time of the new work cell is 26 minutes (enter your response as a whole number).…
A: Here, we have three workstations. At the work station 3, I have added a parallel workstation, Then,…
Q: The following table represents the cost to ship from Distribution Center A, B, or C to Customer 1,…
A: The transportation problem is a mathematical optimization problem that deals with the efficient…
Q: The constraint for cold storage location B should be:
A: The transshipment problem is a pivotal concept within the realm of transportation and logistics. It…
Q: According to Herzberg, hygiene factors are: O morale factors O potential job dissatisfiers…
A: The idea of hygiene elements is crucial to comprehending job pleasure in Herzberg's well-known…
Q: A network of railway lines connects the main lines entering and leaving a city. Speed limits, track…
A: Find the Given details below: Given…
Q: Founded in 1859 in Liverpool as a sugar refiner, today Tate & Lyle is a global provider of specialty…
A: Documenting all business rules for the Account Reconciliation and Task Management system is…
Q: Which of the following most directly expresses the motivation behind the expression "Do not block…
A: If the bottleneck is prevented from working (e.g., it has nowhere to put its output), the overall…
Q: manager of Roth Corporation, wants to determine whether or not the type of work schedule for her…
A: Work Schedule (Treatments)Schedule 1 Schedule 2Schedule 3506075606575706555405840455755
Q: Here are four options, just write down the number of the Process Flow that best represents the…
A: Here, I would explain the process flow that would represent the home production of chocolate ice…
Q: Time to Manufacture % of monitors sold per total products Cost per monitor a b U d e A company…
A: Total time available for production=7 days a week* 9hrs pe dya* 60 minutes per hr=3780 minutes…
Q: With the start of school approaching, a store is planning on having a sale on school materials. They…
A: ItemPackage APackage BNotebook23Folder11Pens21Price$6.50$7.00
Q: The manager of the Petroco Service Station wants to forecast the demand gasoline next month so that…
A: Forecasts serve as benchmarks against which actual outcomes can be measured by a company. Comparing…
Q: a retail store wants to optimize its inventory management. they have data on sales, inventory levels…
A: Proper inventory management in today's cutthroat retail environment can dramatically impact a…
Q: Topic: Threats and controls of the disbursement cycle Lourdes works at the manufacturing company…
A: The disbursement cycle, which includes everything from buying raw materials to paying suppliers, is…
Q: An advantage of using a straight salary plan to compensate sales employees is that employees can be…
A: Wages are not given to workers just because they work and spend time. Wages are given according to…
Q: A network of railway lines connects the main lines entering and leaving a city. Speed limits, track…
A: Find the Given details below: Given…
Q: Using the following PERT diagram, calculate the slack on activity L. Ø 10 START ART 6-6-6-6 a 2 b. 0…
A: PERT refers to Program Evaluation & Review Technique which is used in the planning and…
Q: What are the potential benefits of conducting risk analysis on a project before its implementation?
A: Project management involves the planning, organizing, directing, controlling activities to achieve…
Q: As operations manager of Holz Furniture, you must make a decision about adding a line of rustic…
A: Large Process line :High Demand profit =$600000Low Demand profit=350000Probability of high demand…
Q: The monthly sales for Telco Batteries, Inc. are as follows (see image): Plot the monthly sales data…
A: MonthSales…
Q: Audio Products, Inc. produces two AM/FM/CD players for cars. The radio/CD units are identical, but…
A: Find the given details below: ModelWeek12345678Standard Model250375Sports Model190110
Q: The following is a graph of a linear programming problem. The area of feasible product combinations…
A: The problem belongs to concept of Maximization or Minimization using graph.Maximization Problem: A…
Q: Airline Scheduling. Alpha Airline wishes to schedule no more than one flight out of a given airport…
A: Find the given details below: Given details:Time slot81012C1066D9109L141110N181510
Q: . Develop the MPS record for the hand drills. (Enter your responses as integers. A response of "0"…
A: MPS FINAL MPS shows the number of end items to be produced in each period, within a specified…
Q: Zimmerman’s Bank is the only bank in the small town of St. Thomas. On a typical Friday, an average…
A: Arrival Rate = Service Rate =
Q: The Big Black Bird Company (BBBC) has a large order for special plastic-lined military uniforms to…
A: Productivity is measure of output produced per single unit of input (resource) consumed. More the…
Q: Complete the master production schedule (enter your responses as whole numbers). On-hand inventory…
A:
Q: In this section you must introduce your reader to Coca Cola for auditing, highlighting some of…
A: In the realm of business, a significant element influences how individuals collaborate – known as…
Q: The SOAR system from Pillsbury is tailored to
A: The SOAR (State, Operator, And Result) system developed by Allen Newell and Herbert A. Simon,…
Q: Use the Naive method to make a forecast for month 3, and then use that information to make a…
A: Forecasting helps in knowing about future events by making estimates mainly based on historical…
Q: Ram Roy's firm has developed the following supply, demand, cost, and inventory data. Supply…
A:
Q: What is the importance of stress and aggression management
A: Organizations consist of several employees who work together for the fulfillment of the…
Q: Safety is a very important matter in store management. All materials must be stored so as tominimize…
A: Warehouses play an important role in storing the materials in a proper manner. A warehouse or store…
Q: The equality lines for the following minimization linear programming problem are shown in the graph…
A: 1) 15x + 9y >= 45 15x + 9y = 45 Put x = 0 15*0+9y = 45 9y = 45 y = 45/9 y = 5 Put y = 015x+9*0=…
Q: Please do not give solution in image format thanku Canine Gourmet Super Breath dog treats are sold…
A: Specification limits = 261±15 Upper Specification limit (USL) = 261+15 = 276Lower Specification…
Q: Jobs A, B, C, and D are in queue at work center 10 before being completed on work center 20. The…
A:
Q: Jeremy Manufacturing Company produces connecting rods for 4- and 6-cylinder automobile engines using…
A: Find the given details below: Given details:Setup costManufacturing costProduction…
Q: Use the following scenario and data for all questions The following is the Bill of Material (BOM) of…
A: Find the given details below: Itemon-handLead timeSchedule ReceiptsInventory(weeks)A02-B03100 in…
Q: Mark Gershon, owner of a musical instrument distributorship, thinks that demand for guitars may be…
A: Here, I have been given two variable columns,
Q: In a MRP problem, A is a MPS item. Every A requires 2 B’s and 3 C’s. Every B requires 5 C’s. All…
A: Material requirements planning (MRP) is the system used to avoid missing parts. It establishes a…
Q: Everyone has conflict at some point at work. Have you ever had a time when you had significant…
A: When I had a contention with one of my coworkers on the grounds that we both doled out an…
Q: In an M/M/1 queueing system, the arrival rate is 5 customers per hour and the service rate is 7…
A: Arrival rate of calls λ=5 customers per hourService rate μ=7 customers per hour
Q: For the following highway network system, determine the maximal flow i vehicles per hour: Maximal…
A: Putting the above values in the table as shown below:
Q: Using the fixed-order-quantity model, which of the following is the total ordering cost of inventory…
A: Annual Demand (D)= 25,000 unitsCost per Order (O) = $80Holding cost per unit per year (H) = $16
Q: If a firm has an expected demand of 50 for its product but demand increases to 55 units 10% of the…
A: The cost of stock outs considers the costs sustained by a corporation when its inventory or stock of…
Q: What is the value of R? O 12 20 12,000 O 144,000
A:
Q: Please do not give solution in image formate thank
A: The respective corner points are shown in the graph.The lines are EGB, FGD and FHC.The feasible…
Q: Store A uses the rewhendor modet to manage ft impotary. Demand for its product is nocmaily…
A: Here, the store is using the news vendor model,Now, I will determine the optimal order quantity,
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 5 images
- An assembly line is to be designed to operate 13 hours per day and supply a steady demand of 325 units per day. Here are the tasks and their performance times: TASK PRECEDINGTASKS PERFORMANCE TIME (SECONDS) TASK PRECEDINGTASKS PERFORMANCETIME (SECONDS) a — 48 g d 43 b — 58 h e 38 c — 73 i f 23 d a 63 j g 33 e b 88 k h, i 53 f c 23 l j, k 67 A) What is the efficiency of your line balance? B) Suppose demand increases by 10 percent. How would you react to this? Assume that you can operate only 13 hours per day in regular time. (Round your answers to the nearest whole number.)Sue Helms Appliances wants to establish an assem-bly line to manufacture its new product, the Micro Popcorn Popper. The goal is to produce five poppers per hour. The tasks,task times, and immediate predecessors for producing one MicroPopcorn Popper are as follows:TASK TIME (min) IMMEDIATEPREDECESSORSA 10 —B 12 AC 8 A, BD 6 B, CE 6 CF 6 D, Ea) What is the theoretical minimum for the smallest number ofworkstations that Helms can achieve in this assembly line?b) Graph the assembly line, and assign workers to workstations.Can you assign them with the theoretical minimum?c) What is the efficiency of your assignment?DEFINE CONWIP (CONstant Work-In-Process)
- An assembly line is to be designed to operate 7.5 hours per day and supply a steady demand of 300 units per day. a)assign tasks to workstations using the longest operating time b)suppose demand increase by 10%.how would you react to this?assume you can operatee only 7.5 hours per day TASK PRECEDING TASKS PERFORMANCE TIME(seconds) a - 70 b - 40 c - 45 d a 10 e b 30 f c 20 g d 60 h e 50 i f 15 j g 25 k h,i 20 l j,k 25Canine Kernels Company (CKC) manufactures two differenttypes of dog chew toys (A and B, sold in 1,000-count boxes)that are manufactured and assembled on three differentworkstations (W, X, and Y) using a small-batch process (seeFigure 5.12). Batch setup times are negligible. The flowchartdenotes the path each product follows through the manu-facturing process, and each product’s price, demand perweek, and processing times per unit are indicated as well.Purchased parts and raw materials consumed during pro-duction are represented by inverted triangles. CKC can makeand sell up to the limit of its demand per week; no penaltiesare incurred for not being able to meet all the demand. Eachworkstation is staffed by a worker who is dedicated to workon that workstation alone, and is paid $6 per hour. Totallabor costs per week are fixed. Variable overhead costs are$3,500/week. The plant operates one 8-hour shift per day, or40 hours/week. Which of the three workstations, W, X, or Y,has the highest…Kiko Teddy Bear is a manufacturer of stuffed teddy bears. Kiko would like to be able to produce 40teddy bears per hour on its assembly line. The following information will assist in answering thequestions that follow: Task Information for Kiko Teddy Bear Work Element Task Description ImmediatePredecessor Task Time (inseconds)A Cut teddy bear pattern None 90B Sew teddy bear cloth A 75C Stuff teddy bear B 50D Glue on eyes C 20E Glue on nose C…
- Dave Grubbs of Grubbs Auto Body has five cars waiting for Economy Detailing. An Economy Detailing consists of a wash and then a hand wax. Cars cannot be waxed until they are washed. ROUND UP (39/5) & (39/10). Wash (hours) Wax (hours) (J)aguar 39/5 5 (C)adillac 5 3 (F)ord 1 39/10 (H)onda 2 1 (L)exus 4 4 What schedule produces the shortest time span in which these orders can be completed? Sequence: ____ , _____ , _____ , ______ , ______ Create a Gantt chart for the optimal sequence (shortest time span). How many hours does it take to complete the five orders? For the schedule in question “a”, how many hours is the waxing task idle? When will Dave finish the Cadillac? What is the average order completion time?3 = noito This work cell will produce 617 units per day (8h x 60 m x 60 se) / 46.67 = 617 Takt time = 140/3 = 46.67 Copyright © 2017 Pearson Education, Ltd. Takt time design Creating plate printing cutting packaging Example: 100 Al-Nojoom Company for advertising has identified the following operations as necessary for the work cell for producing color posters. The customer expects delivery 1000 poster per day, and the work day 10 hours. 1. What is the takt time? Copyright © 2017 Pearson Education, Ltd. 2. How many employees are required? 3. If the number of employees assumed to be 9 employees. Find the quantity of products they able to produce. 4. If the work cell has 4 employees find the Total work time by hours needed to produce 600 units with the same operational time. operation Standard time 21.01 unitnos (min) 1.1 0.9 .75 1.25 1 9-33 sill nG a super 9-34Kiko Teddy Bear is a manufacturer of stuffed teddy bears. Kiko would like to be able to produce 40teddy bears per hour on its assembly line. The following information will assist in answering thequestions that follow: Task Information for Kiko Teddy Bear Work Element Task Description ImmediatePredecessor Task Time (inseconds)A Cut teddy bear pattern None 90B Sew teddy bear cloth A 75C Stuff teddy bear B 50D Glue on eyes C 20E Glue on nose C…
- Th3 task is pr0vided in th3 pictur3. (creat3 a DATA FLOW DIAGRAM for the Creat3 a DATA FLOW DIAGRAM for the CASH RECEIPTS SYSTEM that is pr0vided in the pictur3 I WILL RAT3 TH3 TUT0R H3LPFUL IF ANSW3RED ASAPKiko Teddy Bear is a manufacturer of stuffed teddy bears. Kiko would like to be able to produce 40 teddy bears per hour on its assembly line. The following information will assist in answering the questions that follow: Task Information for Kiko Teddy Bear Work Element Task Description Immediate Predecessor Task time (in seconds) A Cut teddy bear pattern None 90 B Sew teddy bear cloth a 75 C stuff teddy bear b 50 D glue on eyes c 20 E glue on nose c 15 F sew on mouth c 35 G attach manufacturer's label b 15 H Inspect and pack teddy bear d,e,f,g 40 a. Draw a precedence diagram. b. What cycle time would provide the desired output? c. What is the maximum possible output of the line? d. What is the theoretical minimum number of workstations using the cycle time computed in” b “ above? e. Assign tasks to workstations using the cycle time in “b” above. f. Calculate the efficiency and idle time percentage of the line.7-383 A plant manager needs a design for an assembly line to assembly a new product that is being introduced. The time requirements and immediate predecessors for the work elements are as follows: Work Element Time (sec) Immediate Predecessor A 12 – B 60 A C 36 – D 24 – E 38 C, D F 72 B, E G 14 – H 72 – I 35 G, H J 60 I K 12 F, J Total = 435 1.If the desired output rate is 30 units per hour, what are the cycle time and theoretical minimum? 2.Suppose that we are fortunate enough to find a solution with just four stations. What is the idle time per unit, efficiency, and the balance delay for this solution?