Randy, James, Michael, Sophie, and Emily are employees of an organization. Their boss has requested them to gift-wrap toys for some children in their local community. Calculate Emily's efficiency, if an average employee takes an average of 10 minutes to complete a gift-wrap. The average production by each employee in an 8-hour workday is as follows Randy- 66 packages James- 48 packages Michael- 59 packages Sophie- 52 packages Emily- 48 packages A. 0.90 (90%). B. 1.50 (150%). C. 9.0 packages per hour. D. 1.50 packages per hour. E. 9.0 minutes per package. F. 1.00 (100%)
Q: What is the total vehicle life cycle cost of this hybrid car given the information provided in the…
A: Given data; Vehicle purchase cost 19500 $ Vehicle operating cost/mile 0.12 $ Useful life…
Q: The total subcontracting cost = sO (Entor your response as a whole number) The total inventory…
A: Given: Subcontracted cost per unit = 75 Inventory holding cost per unit = 20
Q: Do you believe that breaking down projects into tiny, achievable tasks is an essential aspect of…
A: Project management refers to proper planning and controlling the project activities in an standard…
Q: Construct a Network Diagram showing the various logical activity relationships from this…
A: A project schedule network diagram shows the sequence of the task that is performed to complete a…
Q: What is benchmarking, and how does it vary from quality improvement?
A: Benchmarking is a process in which the firm tries to copies the strategies ,policies or best…
Q: Meena Distributors has an annual demand for an airport metal detector of 1,420 units. The cost of a…
A:
Q: Toyota’s history goes back to 1897 when Sakichi Toyoda (Sakichi) diversified into the handloom…
A: As per the given case, the company is facing the problem of the mass departure of young male…
Q: 1. A leader who provides maximum supportive behaviour and a great deal of explicit instructions for…
A: A leader is a person who makes an employee efficient by instructing,guiding and providing training…
Q: A manual assembly line produces a small appliance whose work content time = 25.9 min. Desired…
A: ANSWER : Tc = E/R p= 60(0.95)/50 = 1.14 min. Ts= Tc- Tr = 1.14 - 0.1 = 1.04 min. w = Min Int…
Q: Wingman Distributing Company is expanding its supply chain to include a new distribution hub in…
A: Given data: Variable Cost 0.9 Fixed cost 800 Rental cost 1.4
Q: Quick Oil provides a single-channel automobile oil change and lubrication service. Customers provide…
A: Given data is Arrival rate = 4 cars per hour Service rate = 5 cars per hour
Q: What is the information processing in the MRP system in detail?
A: A production planning method to make appropriate decisions to make an order by comparing the current…
Q: Optimistic Most Likely Pessimistic Activity Predecessor 4. 6. 14 A 4. 14 B. 6. 13 14 A,B 4. 8. 12 10…
A: Here, to find the answers to parts d(, f) and g), we will first find the expected mean duration and…
Q: It is important to understand the differences between project management and software project…
A: Project management and software project management are both essential skills for any software…
Q: The farm has pre-contracted a total of 1,000 man-days of hired labor and has in its inventory a…
A: Let wheat = X1 Corn = X2 Max 15000 X1 + 20000X2 subject to 60 X1 + 30 X2 <= 1000 X1 +…
Q: approach, organizational performance is conceptualized based on which of the following? a.…
A: A resource based approach is an approach in which the firm focuses upon increasing the best use of…
Q: The City Commission of Nashville has decided to build a botanical garden and picnic area in the…
A: Gantt chart is a visual representation of a network diagram which helps to identify the starting and…
Q: What are the cost and benefits associated with Employee orientation/socialization programs?
A: Employee orientation program can be defined as the process of introducing newer employees to their…
Q: You are the production manager for Annie's Tricky Emporium, in charge of making exploding cigars.…
A: Find the Given details below: Day 1 2 3 4 Total Demand (Unit) 220 150 100 70 540
Q: completion time is 31 weeks. What is the be nuch will it cost? Show your work. Activity Expected…
A: Given: Each company takes 1 week to complete the project. Cost per activity to crash is $200…
Q: Describe a number of project assessment criteria in detail.
A: Project management is the management in which different types of skills, processes, and techniques…
Q: Silky Industries is looking for a location for its second telephone remanufacturing facility. Two…
A: Let A = factor weight given to location factor A and B = Factor weight given to location factor…
Q: 6) When United States residents acquire assets abroad, they are in essence A) borrowing money, and…
A: Foreign trade refers to a trade which is a country either imports or exports and there is a use of…
Q: Social Security payments are a form of _ and available to - Automatic stabilizers; current retirees…
A: Social security payments refers to the contributions made by the individual in order to get secured…
Q: Determine if project management software can assist you in better controlling the expenditures of…
A: Project management is the management in which different types of skills and knowledge are required…
Q: Explain the process of balanced scorecard framew
A: Balanced scorecard : The balanced scorecard is a strategic planning and performance management…
Q: A firm finds that it sold 150 units in January, 160 in February, and 170 in March. What is the…
A: Forecasting is the process of estimating future demand based on previous or historic data.
Q: Aggregate demand for a product family is given in the table below for the 4 quarters of 2021.…
A: Aggregate plan helps the company to procure in an optimal way while saving as much money as…
Q: The catering manager of LaVista Hotel, Lisa Ferguson, is disturbed by the amount of silverware she…
A:
Q: Given the following linear program: Max 3x1 + 4x2 s.t. 2x1 + 3x2 0 Identify the feasible…
A: given Max 3x1 + 4x2 s.t. 2x1 + 3x2 < 24 3x1 + x2 < 21 x1, x2 > 0
Q: Develop a solution for the following line balancing problem, allowing a cycle time of 5 minutes.…
A: As mentioned in the question, we have calculated the theoretical minimum number of workstations…
Q: Q4: M/S XYZ Company Manufactures Sports bikes and supplies them to the local market. A local…
A:
Q: A production line with four automatic workstations (the other stations are manual) produces a…
A: a)Tc= E / Rp = 60(0.89)/45 = 1.1867 min
Q: Define sustainability and social responsibility.
A: Sustainability is using resources in a very efficient manner while social responsibility means…
Q: fertilizer manufacturer has to fulfill supply contracts to its two main customers (650 tons to…
A: As per the instructions, VA1 will be units shipped from customer A to warehouse 1, and VA2 will be…
Q: For the finite state automaton given by the transition diagram above, (a) Find the language…
A: given,
Q: How do businesses utilise benchmarking?
A: Benchmarking is a process in which a firm copies all the strategies or implement changes in its…
Q: how many patents did tesla have?
A: Patents protects a firms innovative technology and strategy from being copied by others since Tesla…
Q: How did you find all the points
A: To find the points, remove inequality with equality for constraints. Constraint 1 will become…
Q: 2. The manager of a crew that installs carpeting has tracked the crew's output over the past several…
A: Productivity is the relationship between the output and the input of the production process in an…
Q: is goal is to produce 1,000 bicycles per standard 40-hour workweek, Time Task Precedence Tasks (sec)…
A: Given: His goal is to produce 1000bicycles in 40hours workweek First we have to calculate the cycle…
Q: Ivell Packaging Company produces paper and plastic packaging products. All of the following may be…
A: Corporate social responsibility often called CSR can be stated as the type of business…
Q: What does this mean? "the natural rate of unemployment"?
A: As there are multiple questions I have answered the first one. ans 1=It is usually said that ‘full…
Q: Discuss how Total Quality Management can be applied in Ghanaian companies using just one comapny as…
A: Total quality management (TQM) in business oversees all activities and tasks which are required to…
Q: IntelliTek is an information technology (IT) consulting company that provides IT solutions for…
A: Outsourcing is a practice in which a business hire an outside party to perform some of its tasks…
Q: Among the purposes of institutionalizing ethics and social responsibility in company is located:…
A: Corporate social responsibility refers to the social and environmental responsibilities that a…
Q: Q2,A project network diagram with activities and their durations (days) is given below. A H 2 10…
A: A project network is a network that visually represents the project activities and their durations…
Q: Very Favorable Market Unfavorable Average Market $180,000 Alternatives Market $250,000 Build new…
A: Maximax criteria are the criteria in which the best payoff of each decision alternative is…
Q: Relate THREE (3) ways in which equipment can contribute to the success or failure of catering…
A: Equipment are the several items which are used during cooking food, making food preparation and…
Q: Summarise and discuss the concepts and applications of Sustainable Design and Sustainable…
A: Sustainable design and manufacturing help to create products and production processes that are…
Randy, James, Michael, Sophie, and Emily are employees of an organization. Their boss has requested them to gift-wrap toys for some children in their local community. Calculate Emily's efficiency, if an average employee takes an average of 10 minutes to complete a gift-wrap. The average production by each employee in an 8-hour workday is as follows
Randy- 66 packages
James- 48 packages
Michael- 59 packages
Sophie- 52 packages
Emily- 48 packages
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- A bicycle component manufacturer produces hubs for bike wheels. Two processes are possible for manufacturing, and the parameters of each process are as follows: Process 1 Process 2 35 parts/ hour 4 hours/ day 15 parts/hour 7 hours/day 20% 9% Production rate Daily production time Percent of parts rejeted based on visual inspection Assume that the daily demand for hubs allows all defect-free hubs to be sold. Additionally, tested or rejected hubs cannot be sold. Find the process that maximizes profit per day if each part is made from Php 200 worth of material and can be sold for Php 1,500. Both processes are fully automated, and variable overhead cost is charged at the rate of Php 2,000 per hour.A staff assistant at NUBD Corporation recently determined that the first four units completed in a new manufacturing process took 1,000 hours to complete, or an average of 250 hours per unit. The assistant also found that when the cumulative output produced doubles, the average labor time declines by 25%. On the basis of this information, how many total hours would NUBD use if it produces 16 units?Sticky Manufacturing produces a variety of adhesive products. On one production line,the company fills one-quart containers with its Skin-Free™ adhesive, a glue that bonds woodand other substances together but does not adhere to human skin in any way.The process yield on the Skin-Free™ line is 92%. One-half pound of Chemical SKF is addedat the beginning of the process for every quart of Skin-Free™ started. The standard price forChemical SKF is $15.00 per pound.Calculate the standard quantity of Chemical SKF consumed for every good unit of output ofSkin-Free™. Then, calculate the standard cost of Chemical SKF in one good quart of Skin-Free™.
- A recurring maintenance job in a factory is being done by a three-man crew. Due to the nature of the job and space limitations, it was observed that two of the men were idle 37% of the time; one of the men was also idle an additional of the time, and at any given time only one man was required. The men were each paid P24.00 per hour. Each time the job was performed a set of tools and equipment with a value equivalent to P36.00 per hour was used. If the three-men crew could complete the work in 5 hours, which crew size would be the most economicalHeizer and Render advises that when analyzing and designing processes to transform resources into goods, the followingquestions should be asked:- Is the process designed to achieve competitive advantage in terms of differentiation, response or low cost?- Does the process eliminate steps that do not add value?- Does the process maximize customer value as perceived by the customer?- Will the process win orders?A Time-Function Map is similar to a flow process chart, but with time added to the horizontal axis. With time-function mapping,notes indicate the activities and arrows indicate the flow direction, with time on the horizontal axis.Heizer and Render advises that when analyzing and designing processes to transform resources into goods, the followingquestions should be asked:- Is the process designed to achieve competitive advantage in terms of differentiation, response or low cost?- Does the process eliminate steps that do not add value?- Does the process maximize customer value as perceived by the customer?- Will the process win orders?A Time-Function Map is similar to a flow process chart, but with time added to the horizontal axis. With time-function mapping,notes indicate the activities and arrows indicate the flow direction, with time on the horizontal axis. 1. Choose a process within your organization and construct a Baseline Time-Function Map
- A small, privately owned Asian company is producing a private-label soft drink called Yoggo. A bottling line puts the soft drinks into plastic bottles and then packages the bottles into boxes holding 10 bottles each. The bottling line is comprised of the following four steps: (1) the bottling machine takes 1 second to fill a bottle, (2) the lid machine takes 3 seconds to cover the bottle with a lid, (3) a labeling machine takes 3 seconds per bottle, and (4) the packaging machine takes 4 seconds to place a bottle into a box. When a box has been filled with 10 bottles, a worker tending the packaging machine removes the filled box and replaces it with an empty box. Assume that the time for the worker to remove a filled box and replace it with an empty box is negligible and hence does not affect the capacity of the line. Problem data are summarized in the following table. Process Step Number of Machines Seconds per Bottle Bottling 1 1 Apply a lid 1 3 Labeling 1 3 Packaging 1 4…A small, privately owned Asian company is producing a private-label soft drink called Yoggo. A bottling line puts the soft drinks into plastic bottles and then packages the bottles into boxes holding 10 bottles each. The bottling line is comprised of the following four steps: (1) the bottling machine takes 1 second to fill a bottle, (2) the lid machine takes 3 seconds to cover the bottle with a lid, (3) a labeling machine takes 3 seconds per bottle, and (4) the packaging machine takes 4 seconds to place a bottle into a box. When a box has been filled with 10 bottles, a worker tending the packaging machine removes the filled box and replaces it with an empty box. Assume that the time for the worker to remove a filled box and replace it with an empty box is negligible and hence does not affect the capacity of the line. Problem data are summarized in the following table. Assuming unlimited demand, what would be the flow rate? Assuming unlimited demand, what would be the utilization at…A customer wants 38,400 parts for the next month and the production line operates continuously for 16 hours per day. It is known that the company works 20 days per month. Determine the Takt Time in parts per second.
- The AER company operates 24 hours a day. The performance measures of the production equipment used for 1 month are as follows: -Open time is 30 days -The expected time of non-availability of production equipment is 97 hours -The Unplanned hardware downtime is 25.5 hours - Hardware downtime attributable to employee delays is 2817 minutes - Equipment downtime due to power outages is 4578 minutes ' Determine the efficiency rate and the utilization rate of production equipmentHammond Inc. has analyzed the setup time on its computer-controlled lathe. The setup requires changing the type of fixture that holds a part. The average setup time has been 135 minutes, consisting of the following steps: Step Time (in minutes) Turn off machine and remove fixture from lathe 13 Go to tool room with fixture 15 Record replacement of fixture to tool room 18 Return to lathe 20 Clean lathe 17 Return to tool room 20 Record withdrawal of new fixture from tool room 12 Return to lathe 15 Install new fixture and turn on machine 8 Total setup time 138 Why should management be concerned about improving setup time? What do you recommend to Hammond Inc. for improving setup time? How much time would be required for a setup, using your suggestion in (b)?A 10 station automated assembly system produces an ideal cycle time (Tc) of 14 seconds/cycle. When a defective part enters any assembly station it sometimes causes a station jam or stoppage. Defective parts occur at a rate of 0.07 and a jams due to defective parts occur at a rate of 0.4. When a jam occurs, it takes on average 74 seconds to clear and restart the station. Determine the production rate of acceptable parts (Rap) to the nearest 1 part/hour.