Q-10 A load of 10kW is fed from a source of 230VAC at 50HZ. It has a pf of 0.707 lagging. We need to improve it to 0.9. Calculate the value of the capacitor that has to be connected in parallel to achieve it.

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.1MCQ: The rms value of v(t)=Vmaxcos(t+) is given by a. Vmax b. Vmax/2 c. 2Vmax d. 2Vmax
icon
Related questions
Question
Q-10 A loạad of 10kW is fed from a source of 230VAC at 50HZ. It has a pf of
0.707 lagging. We need to improve it to 0.9. Calculate the value of the
capacitor that has to be connected in parallel to achieve it.
Transcribed Image Text:Q-10 A loạad of 10kW is fed from a source of 230VAC at 50HZ. It has a pf of 0.707 lagging. We need to improve it to 0.9. Calculate the value of the capacitor that has to be connected in parallel to achieve it.
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Compensation Techniques in Transmission Line
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning