Problem 1: A -3% grade meets a +5% grade near an underpass. In order to maintain the minimum clearance allowed under the bridge and at the same time introduce a vertical transition curve in the grade line, it is necessary to use a curve that lies 200m on one side of the vertex of the straight grade and 100m on the other. The station of the beginning of the curve (200m side) is 10+ 000 and its elevation is 228m. a.) Determine the elevation at station 10 + 040. b.) If the uphill edge of the underside of the bridge is at station 10+ 220 and at elevation 229.60m, what is the vertical clearance under the bridge at this point? c.) Determine the stationing of the lowest point of the curve. P..C. 10+000 Fl. 228 m 40 -200 81=-38 10+040 B H -100 8 +59 8=(500+£0 3001 -

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Copy the questions and answer. Provide necessary drawings / illustrations base on the
problems.
Problem 1:
A -3% grade meets a +5% grade near an underpass. In order to maintain the
minimum clearance allowed under the bridge and at the same time introduce a vertical
transition curve in the grade line, it is necessary to use a curve that lies 200m on one
side of the vertex of the straight grade and 100m on the other. The station of the
beginning of the curve (200m side) is 10+ 000 and its elevation is 228m.
a.) Determine the elevation at station 10 +
040.
b.) If the uphill edge of the underside of the
bridge is at station 10+ 220 and at
elevation 229.60m, what is the vertical
clearance under the bridge at this point?
c.) Determine the stationing of the lowest
point of the curve.
P..C.
10+000
Fl. 228 m
40
-200
81=-38
10+040
H
-100
20+5%
8=(500+£0 3001 -
Transcribed Image Text:Copy the questions and answer. Provide necessary drawings / illustrations base on the problems. Problem 1: A -3% grade meets a +5% grade near an underpass. In order to maintain the minimum clearance allowed under the bridge and at the same time introduce a vertical transition curve in the grade line, it is necessary to use a curve that lies 200m on one side of the vertex of the straight grade and 100m on the other. The station of the beginning of the curve (200m side) is 10+ 000 and its elevation is 228m. a.) Determine the elevation at station 10 + 040. b.) If the uphill edge of the underside of the bridge is at station 10+ 220 and at elevation 229.60m, what is the vertical clearance under the bridge at this point? c.) Determine the stationing of the lowest point of the curve. P..C. 10+000 Fl. 228 m 40 -200 81=-38 10+040 H -100 20+5% 8=(500+£0 3001 -
Expert Solution
steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Knowledge Booster
Structural components of framed construction
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning